| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | Accepted-Technical Qualified |
| 2 | Accepted-Technical AT NUKERKFRE PUR P D ALAVA P S ALADI DIST KENDRAPARA | Accepted-Technical Qualified |
| 3 | Accepted-Technical AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | Accepted-Technical Qualified |
| 4 | Accepted-Technical | Accepted-Technical Qualified |
| 5 | Accepted-Technical | Accepted-Technical Qualified |
Tender Value
₹7.5 Cr
EMD Value
₹7.5 L
Closing Date
28 May 2026, 5:30 pmClosed
CCE Cuttack RandB Circle
O/o CCE Cuttack RandB Circle
Road work
2026_EICCL_129334_2
CCE.Ctc.(RandB)21/2025-26
National Competitive Bid
Civil Works - Roads
Percentage
270 days
Kendrapara
As per DTCN
3 documents required · 3 mandatory
₹10,000
₹7.5 L
Yes
21 Sept 2026
15 May 2026
29 May 2026
15 May 2026
28 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fine dressing and turfing to the slope of embankment with compact turf grass transporting to site by mechanical means with 5km lead etc complete as per the direction of the Engineer-in-charge | 21,920 | Sqm | 28.91 | ₹6,33,707.2 |
| 2 | Clearing and grubbing road land including uprooting vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of existing stumps of trees dead or cut earlier stacking serviceable material for use or auction within the road land & disposal of all unserviceable material including removal top 150mm thick organic soil away from the road land as under Clause no. 201, specification for Road & Bridge work of MORT&H (5th revision) including full compensation all operations, all inclusive costs, contigencies, incidentals involved for finished defect free item of work complete as per specification and direction of the Engineer-in-charge | 24,800 | Sqm | 8.45 | ₹2,09,560 |
| 3 | Scarifing the existing bituminous road surface to a depth of 50mm and disposal of scarified material with in all lifts and lead upto 1000meters as per the direction of the Engineer-in-charge | 18,600 | Sqm | 6.03 | ₹1,12,158 |
| 4 | Reworking the scarified bituminous surface suitably after supplimenting the base materials with sand and compacting finished surface as per clause 501.8.3.2 of MORTH Specification for Road and Brifge works 5th. Revision. | 23,250 | Sqm | 20.66 | ₹4,80,345 |
| 5 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers trimming bottom and side slopes in accordance with requirement of lines grades and cross section and transporting to the embankment location within all lead and lifts upto 1000m. etc. complete as per specification and direction of Engineer-in-charge | 3,312.4 | cum | 74.79 | ₹2,47,734.4 |
| 6 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5 km. spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MORT&H specifications for Road & Bridge works(5th Revision). | 12,254.61 | Cum | 203.79 | ₹24,97,366.97 |
| 7 | Construction of embankment with approved material obtained from roadway cutting with all lifts and leads, transporting to site by mechanical means within a lead of 5 km. spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MORT&H specifications for Road & Bridge works(5th Revision). | 2,649.92 | Cum | 35.83 | ₹94,946.63 |
| 8 | Providing compacted shoulder with granular materials by using moorum of approved quality, watering and compacting the required density in OMC with PRR as per approved drawing and technical specification as per Section 900 and Clause 407 of MoRT&H Specification for Road & Bridge works (5th Revision) and as per direction of Engineer-in-Charge | 1,395 | Cum | 2,139.13 | ₹29,84,086.35 |
| 9 | Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause 406 of MORT&H specification for Road and Bridge works(5th Revision). | 3,763.88 | cum | 3,867.68 | ₹1,45,57,483.4 |
| 10 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surfce and spraying primer @ 0.6kg. per sqm.using mechanical broom as per Clause 502 of MORT&H Specification for Road & Bridge works (5th Revision.) | 23,934.3 | Sqm | 42.93 | ₹10,27,499.5 |
stage.html
html • 0.07 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
DTCN.pdf
Tender Documents • 0.55 MB
BOQ_591461.xls
BOQ • 0.45 MB
Clarification_OM.pdf
Additional Documents • 2.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .