Loading…
Loading…
Tender Value
₹5.0 L
EMD Value
₹9,933
Closing Date
26 Sept 2026, 6:00 pm3d left
EE(PnA) O/o C.E.(C)-I LKO
Executive Engineer (PnA) O/o Sr. Chief Engineer (Civil)-I, BSNL UP(E) Civil Zone, Lucknow.
Day to day and emergent civil maintenance works of staff quarters in BSNL Colony Sector-K Aliganj Lucknow for a period of one year.
2026_BSNL_291076_1
NIT No.26/2026-27/BSNL/EE(PnA)/LKO
Open Tender
Civil Works
Item Rate
365 days
LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
AS PER TENDER DOCUMENT
₹9,933
Yes
16 Sept 2026
16 Sept 2026
30 Sept 2026
16 Sept 2026
26 Sept 2026
16 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DSR 2023 ITEMS | - | - | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level | - | - | - | - |
| 3 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.5 | One Cubic Metre | - | - |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing : | - | - | - | - |
| 5 | 1:2:4 (1 Cement : 2 coarse sand derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.25 | One Cubic Metre | - | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | - | - | - | - |
| 7 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | One Cubic Metre | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for : | - | - | - | - |
| 9 | Foundations, footings, bases of columns, etc. for mass concrete | 2 | One Square Metre | - | - |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
TENDERDOCUMENTDAYTODAYSECTORKALIGANJLUCKNOW.pdf
Tender Documents • 0.36 MB
BOQ_339478.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .