| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.3 LAdmitted-Fee/PreQual/Technical/Finance | -25.10% | ₹20.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹22.6 L+₹2.3 L (11.4%)Admitted-Fee/PreQual/Technical/Finance | -16.55% | ₹22.6 L+₹2.3 L (11.4%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹24.1 L+₹3.8 L (18.8%)Admitted-Fee/PreQual/Technical/Finance | -11.00% | ₹24.1 L+₹3.8 L (18.8%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹24.3 L+₹4.1 L (20.1%)Admitted-Fee/PreQual/Technical/Finance | -10.01% | ₹24.3 L+₹4.1 L (20.1%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹25.7 L+₹5.4 L (26.8%)Admitted-Fee/PreQual/Technical/Finance | -4.99% | ₹25.7 L+₹5.4 L (26.8%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹27.0 L
EMD Value
₹27,100
Closing Date
17 Sept 2026, 5:00 pmClosed
SE Kataka RandB Division No.I
O/O SE Kataka RandB Division No.I, Kataka
Building work
2026_EICCL_139882_1
SE CTC(R and B)-24 of 2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
Cuttack
As per DTCN
2 documents required · 2 mandatory
₹6,000
₹27,100
Yes
18 Sept 2026
5 Sept 2026
18 Sept 2026
5 Sept 2026
17 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation of foundation in all kinds of soil up to the required depth including Moorum, stony earth and earth mixed with boulders except sheet rocks and boulders requiring blasting including dressing, leveling the bed and depositing the excavated materials away from work site with initial leads and lifts, T&P shoring, shuttering and dewatering if required etc, complete as directed by Engineer-in-charge. | 61.32 | Cum | 260.95 | ₹16,001.45 |
| 2 | Supplying, & filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyance, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work etc., complete (Measurement will be taken on finished compacted section) as per specification and direction of Engineer-in-charge. | 20.43 | Cum | 530.54 | ₹10,838.93 |
| 3 | Plain Cement concrete (1:3:6) in foundation and floors using 4cm(1½”) size hard crusher broken granite stone metal of approved quality and from approved quarry including lowering, laying concrete, watering, curing etc, complete to required levels laid in layers not exceeding 0’-6” thick in each layer including cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc, complete as per specification & direction of the Engineer-in-charge. | 11.86 | Cum | 6,479.28 | ₹76,844.26 |
| 4 | R.C.C work of M-20 Grade having a minimum compressive strength (in work test) 200kg/sqcm in 15cm cubes at 28 days after mixing and test conducted in accordance with IS 456 and IS516 using 20mm down graded size black hard crusher broken granite stone chips as per the design mix of approved quality and from approved quarry including hoisting, lowering, laying and compaction by using vibrators, watering, curing for 28days, centering, shuttering and finishing the exposed surface smooth, providing grooves or beads where necessary including cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of MS Rod or tor steel and binding wires & labour charges for bending binding and tying the grills etc. as per specification and direction of the Engineer-in-Charge. (i)Column Base | 12.74 | Cum | 6,927.4 | ₹88,255.08 |
| 4.1 | (ii)Grade Beam | 10.24 | Cum | 7,801.82 | ₹79,890.64 |
| 4.2 | (iii)Column in Superstructure | 4.68 | Cum | 18,749.66 | ₹87,748.41 |
| 5 | Cutting, straightening coiled or bent up M.S. Rod or tor steel (TATA/ SAIL/Vizag/ Zindal etc)including bending, binding, welding and joining if necessary and tying the grills and placing in position as required for R.C.C. Work and for providing fan hooks as required, hoisting, lowering, laying including cost, conveyances, taxes of M.S. Rod or tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all floors (payment will be made on standard weight of B.I.S. for M.S. Rods or tor steel only) etc. complete as per specification & direction of Engineer-in-charge | 25.2 | Qntl. | 9,079.84 | ₹2,28,811.97 |
| 6 | Fly Ash Brick masonry using Fly Ash Bricks (25cmX12cmX8cm) having crushing strength not less than 75Kg/sqcm with dimensional tolerance +2% in cement mortar (1:6) after immersing the bricks for six hours in water before use in FOUNDATION, PLINTH AND BASEMENT and for ornamental flower beds, plinth molding and similar such type of works with all necessary projections, cutting, circular molding, corbelling, watering, curing etc. including cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. | 3.24 | Cum | 5,569.3 | ₹18,044.53 |
| 7 | Fly Ash Brick masonry using Fly Ash Bricks (25cmX12cmX8cm) having crushing strength not less than 75Kg/sqcm with dimensional tolerance +2% in cement mortar (1:6) after immersing the bricks for six hours in water before use in SUPERSTRUCTURES in all floors including splays, cutting, circular moulding, corbelling, champhering and similar such type of works, scaffolding, watering, curing, including cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. (Ground floor) | 189 | Cum | 5,602.63 | ₹10,58,897.07 |
| 8 | Providing 12mm thick cement plaster in cement mortar (1:6) in all floors finished smooth to out side smooth surface of brick walls after racking out joints, scrapping & cleaning the surface & finishing the plaster surface smooth using wooden float only to proper plumbs & level and making necessary grooves, beads & drip course to give required ornamental finish as per drawing, watering, curing, scaffolding, screening sand etc. complete with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work etc. complete as per specification & direction of Engineer-in-charge. | 721.83 | Sqm | 190.53 | ₹1,37,530.27 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 0.94 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 1.75 MB
BOQ_607794.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .