Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | ₹2.0 L | L1 | Accepted-AOC accepted |
| 2 | L2₹2.0 LRejected-AOC | ₹2.0 L | L2 | Rejected-AOC rejected. |
| Sl No | Description | Qty | Unit | PRAVIN CONSTRUCTION L1 | KARTHIKEYAN K L2 |
|---|---|---|---|---|---|
| 1.00CIVIL WORKS | |||||
| 1.01 | Special ceiling Plastering with Cement mortor 1:3 (one cement,three sand) with 10 mm thick including cost of all materials,labour charges for finishing and curring etc., complete | 3.7 | m3 | 330 ₹1,221 | 340 ₹1,258 |
| 1.02 | Plastering with Cement mortor 1:5 (one cement,five sand) with 12 mm thick including cost of all materials,labour charges for finishing and curring etc., complete | 8.9 | m3 | 287 ₹2,554.30 | 296 ₹2,634.40 |
| 1.03 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 5.36 | m2 | 5,537 ₹29,678.32 | 5,703 ₹30,568.08 |
| 1.04 | Suplying and fabricating and placing in position of m.s rods (or) RTS for all RCC works as per design given including bending typing and cost of bending tying and cost of binding wire etc complete. | 3.21 | Qtl | 9,297 ₹29,843.37 | 9,575 ₹30,735.75 |
| 1.05 | Reinforced Cement Concrete 1:2:4 (One Cement, Two sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 8.04 | m3 | 8,795 ₹70,711.80 | 9,059 ₹72,834.36 |
| 1.06 | Painting the walls with one coats with first class quality Plastic Emulsion paint of approved colour including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification | 247.5 | m3 | 137 ₹33,907.50 | 141 ₹34,897.50 |
| 1.07 | White Washing two coats with freshly burnt white shell lime in all floors including cost of lime, brushes, scaffolding charges etc., complete complying with standard specification | 46 | m2 | 39 ₹1,794 | 40 ₹1,840 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
23 Feb 2026, 2:00 pmClosed
Excecutive Engineer
BSNL LEVEL IV building , Tallakulam
SPECIAL REPAIR WORKS TO OFFICE BUILDING AND TOILET IN TNCSC GODOWN CAMPUS AT MELUR IN MADURAI DISTRICT
2026_TCSC_657276_1
EE/DB/DO/FMadurai/2026
Open Tender
Civil Works
Melur
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹2,000
12 Mar 2026
13 Feb 2026
24 Feb 2026
13 Feb 2026
23 Feb 2026
14 Feb 2026
CIVIL WORKS
Special ceiling Plastering with Cement mortor 1:3 (one cement,three sand) with 10 mm thick including cost of all materials,labour charges for finishing and curring etc., complete
Plastering with Cement mortor 1:5 (one cement,five sand) with 12 mm thick including cost of all materials,labour charges for finishing and curring etc., complete
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Suplying and fabricating and placing in position of m.s rods (or) RTS for all RCC works as per design given including bending typing and cost of bending tying and cost of binding wire etc complete.
Reinforced Cement Concrete 1:2:4 (One Cement, Two sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Painting the walls with one coats with first class quality Plastic Emulsion paint of approved colour including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification
White Washing two coats with freshly burnt white shell lime in all floors including cost of lime, brushes, scaffolding charges etc., complete complying with standard specification
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_788292.xls
BOQ • 0.23 MB