Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.3 LAccepted-AOC | L1 | Accepted-AOC Quoted L1 rate | |
| 2 | L2₹83.0 L+₹3.7 L (4.66%)Rejected-AOC 44 621708 | PERAMBALUR | TAMIL NADU | 621708 | L2 | Rejected-AOC Quoted L2 rate |
| Sl No | Description | Qty | Unit | RENGASAMY S L1 | KATHIRAVAN R L2 |
|---|---|---|---|---|---|
| 1.00 | Picking BT Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. KM 0/000 - 1/000 | 1,250 | M2 | 22 ₹27,500 Lowest | 25 ₹31,250 |
| 2.00 | Spreading the collected US gravel to watering and hand roller rolling including cost and supply of well Gravel from approved quarry and stacking to departmental gauge for premeasurements etc complete as per standard specifications and as directed by the departmental officers KM 0/000 - 1/000 | 180 | M3 | 534 ₹96,120 Lowest | 545 ₹98,100 |
| 3.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/000 - 1/000 | 468.75 | M3 | 2,564 ₹12,01,875 Lowest | 2,650 ₹12,42,187.5 |
| 4.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. KM 0/000 - 1/000 | 3,750 | M2 | 85 ₹3,18,750 Lowest | 90 ₹3,37,500 |
| 5.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., KM 0/000 - 1/000 | 3,750 | M2 | 20 ₹75,000 Lowest | 21 ₹78,750 |
| 6.00 | BITUMINOUS MACADAM : Providing and Laying bituminous Macadam with hot mix plant using crushed aggregates of gradign as per Table 500.4 premixed with bituminous binder, transported to site upto lead of 1000m laid over a previously prepared surface with paver finisher to the required grade , level and alignment and rolled to achieve the desired compaction as per Technical Specification KM 0/000 - 1/000 | 187.5 | M3 | 9,220 ₹17,28,750 Lowest | 10,150 ₹19,03,125 |
| 7.00 | BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 KM 0/000 - 1/000 | 93.75 | M3 | 11,752 ₹11,01,750 Lowest | 11,950 ₹11,20,312.5 |
| 8.00 | Provision for HM Stone charges etc complete | 4 | No | 574 ₹2,296 Lowest | 600 ₹2,400 |
| 9.00 | KM Stone | 1 | No | 2,197 ₹2,197 Lowest | 2,250 ₹2,250 |
| 10.00 | Construction of Drain Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete Drain wall 750m-1000m | 330 | cum | 263 ₹86,790 Lowest | 275 ₹90,750 |
Tender Value
₹83.8 L
EMD Value
₹84,000
Closing Date
3 Sept 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
DRDA Perambalur
Strengthening of 1 road in Alathur Block under the scheme of MGSMT 2025-26 Phase III in Perambalur District Package No.TN11-04
2025_RDTN_593897_4
DIPR/4437/TENDER/2025 Dated 18.08.2025
Open Tender
Civil Works - Roads
Item Rate
180 days
Perambalur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹84,000
DRDA Perambalur
15 Oct 2025
18 Aug 2025
3 Sept 2025
18 Aug 2025
3 Sept 2025
18 Aug 2025
26 Aug 2025
Amount
Picking BT Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. KM 0/000 - 1/000
Spreading the collected US gravel to watering and hand roller rolling including cost and supply of well Gravel from approved quarry and stacking to departmental gauge for premeasurements etc complete as per standard specifications and as directed by the departmental officers KM 0/000 - 1/000
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/000 - 1/000
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. KM 0/000 - 1/000
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., KM 0/000 - 1/000
BITUMINOUS MACADAM : Providing and Laying bituminous Macadam with hot mix plant using crushed aggregates of gradign as per Table 500.4 premixed with bituminous binder, transported to site upto lead of 1000m laid over a previously prepared surface with paver finisher to the required grade , level and alignment and rolled to achieve the desired compaction as per Technical Specification KM 0/000 - 1/000
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 KM 0/000 - 1/000
Provision for HM Stone charges etc complete
KM Stone
Construction of Drain Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete Drain wall 750m-1000m
PCC 1:4:8 using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete
Supply and Erection of steel centering for sides and soffits including cost and conveyance of all materials to site and all labour charges etc., complete
Plain Cement concrete in C.C.1:3:6 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all charges etc.,
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
KATHIRAVAN R (BID ID -1448383)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .