Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.9 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹31.1 L+₹4.2 L (15.7%)Rejected-Finance JODHPUR ROAD UTARLAI BARMER RAJ 344035 | BARMER | RAJASTHAN | 344035 | L2 | Rejected-Finance Rejected being L2 | |
| 3 | L3₹31.2 L+₹4.4 L (16.3%)Rejected-Finance 205 IIND PHASE INDUSTRIAL AREA BARMER 344001 | BARMER | BARMER | RAJASTHAN | 344001 | L3 | Rejected-Finance Rejected being L3 | |
| 4 | L4₹32.9 L+₹6.0 L (22.4%)Rejected-Finance MAHAMUNI PARA BOGAFA P S P O SANTIRBAZAR SOUTH TRIPURA | GOMATI | TRIPURA | 799125 | L4 | Rejected-Finance Rejected being L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical Duplicate bid |
Tender Value
₹34.6 L
EMD Value
₹69,120
Closing Date
8 Jun 2021, 6:00 pmClosed
CWE (A) Jaisalmer
CWE (A) Jaisalmer
OUTSOURCING THE RESOURCES FOR MAINTENANCE AND OPERATION OF E/M INSTALLATIONS FOR PUMP HOUSES FOR VARIOUS UNITS AND WATER SUPPLY DISTRIBUTION OF JALIPA MIL STN UNDER GE(A) BARMER
2021_MES_442364_1
83948
Open Tender
Miscellaneous Works
Item Rate
334 days
GE (A) Barmer
Please refer tender documents
10 documents required · 10 mandatory
₹500
Yes
GE (A) BARMER
₹69,120
Yes
9 Jul 2021
12 May 2021
10 Jun 2021
12 May 2021
8 Jun 2021
27 May 2021
Amount
Outsourcing of services for maintenance and operation of 74 Armd Pump House (Pump House No - 2) at Jalipa Mil Stn on all working days (including Sunday/Holiday) by deploying one skilled operator (PHO/FGM) round the clock to operate electrically driven 3 phase, 50 Hz,AC water supply pumping system along with control of all mechanical device such as sluice valve/butter fly valve,foot valve and NRV etc including keeping the installation operational in healthy condition including carrying out all daily maintenance all as directed by Engineer-in-charge & as per Indian electricity rules/ Engineering practices & maintaining properly the protective instruments complete in good condition and all maintenance records, break down records by providing with adequate staff all as specified in particular specifications to the entire satisfaction of Engineer-in-charge. The installation to be operated in 3 shift (8 Hours per shift) as per under mentioned or as directed by the Engr-in-charge. (a) First Shift - 0600 Hrs to 1400 Hrs - One PHO/FGM. (b) Second Shift - 1400 Hrs to 2200 Hrs - One PHO/FGM. (c) Third Shift - 2200Hr to 0600 Hrs - One PHO/FGM . The details of 74 Armd Pump House (Pump House No - 2) at Jalipa Mil Stn are as under: - (a) Centrifugal Pump Set of Capacity upto 40 HP - 04 Nos (b) Chlorination plant - 01 Nos. (c) UG Sump of capacity upto 2.0 Lakh Gallon - 03 Nos. (d) O/H Tanks of Capacity 50000 Gallon – 02 Nos. (e) DG Set of Capacity 30 KVA - 01 No (f) Electric control panel board indoor type with accessories - 03 Nos.
Outsourcing of services for maintenance and operation of 22 Guard Pump House(Pump House No - 4) at Jalipa Mil Stn on all working days (including Sunday/Holiday) by deploying one skilled operator (PHO/FGM) round the clock to operate electrically driven 3 phase, 50 Hz,AC water supply pumping system along with control of all mechanical device such as sluice valve/butter fly valve,foot valve and NRV etc including keeping the installation operational in healthy condition including carrying out all daily maintenance all as directed by Engineer-in-charge & as per Indian electricity rules/ Engineering practices & maintaining properly the protective instruments complete in good condition and all maintenance records, break down records by providing with adequate staff all as specified in particular specifications to the entire satisfaction of Engineer-in-charge. The installation to be operated in 3 shift (8 Hours per shift) as per under mentioned or as directed by the Engr-in-charge. (a) First Shift - 0600 Hrs to 1400 Hrs - One PHO/FGM. (b) Second Shift - 1400 Hrs to 2200 Hrs - One PHO/FGM. (c) Third Shift - 2200Hr to 0600 Hrs - One PHO/FGM . The details of 22 Guard Pump House (Pump House No - 4) at Jalipa Mil Stn are as under: - (a) Centrifugal Pump Set of Capacity upto 25 HP- 02 Nos (b) Chlorination plant - 01 Nos. (c) UG Sump of capacity 50000 Gallon - 01 Nos. (d) O/H Tanks of Capacity 50000 Gallon – 01 Nos. (e) DG Set of Capacity 20 KVA - 01 No (f) Electric control panel board indoor type with accessories - 02 Nos.
Outsourcing of services for maintenance and operation of 13 Guard Pump House(Pump House No - 5) at Jalipa Mil Stn on all working days (including Sunday/Holiday) by deploying one skilled operator (PHO/FGM) to operate electrically driven 3 phase, 50 Hz,AC water supply pumping system along with control of all mechanical device such as sluice valve/butter fly valve,foot valve and NRV etc including keeping the installation operational in healthy condition including carrying out all daily maintenance all as directed by Engineer-in-charge & as per Indian electricity rules/ Engineering practices & maintaining properly the protective instruments complete in good condition and all maintenance records, break down records by providing with adequate staff all as specified in particular specifications to the entire satisfaction of Engineer-in-charge. The installation to be operated in 2 shifts (8 Hours per shift) as per under mentioned or as directed by the Engr-in-charge. (a) First Shift - 0600 Hrs to 1400 Hrs - One PHO/FGM. (b) Second Shift - 1400 Hrs to 2200 Hrs - One PHO/FGM. The details of 13 Gurad Pump House ( Pump House No - 5) at Jalipa Mil Stn are as under: - (a) Centrifugal Pump Set of Capacity upto 25 HP - 05 Nos (b) Chlorination plant - 01 Nos. (c) UG Sump of capacity 1.0 Lakh Gallon - 02 Nos. (d) O/H Tanks of Capacity 1.0 Lakh Gallon – 01 Nos. (e) DG Set of Capacity 82.5 KVA - 01 No (f) Electric control panel board indoor type with accessories - 04 Nos.
Outsourcing of services for maintenance and operation of 412 Engr KLP Pump House(Pump House No - 6) at Jalipa Mil Stn on all working days (including Sunday/Holiday) by deploying one skilled operator (PHO/FGM) to operate electrically driven 3 phase, 50 Hz,AC water supply pumping system along with control of all mechanical device such as sluice valve/butter fly valve,foot valve and NRV etc including keeping the installation operational in healthy condition including carrying out all daily maintenance all as directed by Engineer-in-charge & as per Indian electricity rules/ Engineering practices & maintaining properly the protective instruments complete in good condition and all maintenance records, break down records by providing with adequate staff all as specified in particular specifications to the entire satisfaction of Engineer-in-charge. The installation to be operated in 2 shift (8 Hours per shift) as per under mentioned or as directed by the Engr-in-charge. (a) First Shift - 0600 Hrs to 1400 Hrs - One PHO/FGM. (b) Second Shift - 1400 Hrs to 2200 Hrs - One PHO/FGM. The details of 412 Engr KLP Pump House ( Pump House No -6 ) at Jalipa Mil Stn are as under: - (a) Centrifugal Pump Set of Capacity upto 25 HP - 02 Nos (b) Chlorination plant - 01 Nos. (c) UG Sump of capacity 50000 Gallon - 01 Nos. (d) O/H Tanks of Capacity 50000 Gallon – 01 Nos. (e) Electric control panel board indoor type with accessories - 02 Nos.
Outsourcing of services for maintenance and operation of valves in each shift of 8 hours for two shifts of one day for water supply distribution system of Zone 3 & 4 and ensured by valveman employed minimum overflow and wastage of water shall also be ensured while operating valves,any leakage or any break down found in the supply line shall be reported to the JE/Engr-in-Charge for timely repair/corrective and preventive action including providing suitable conveyance to operator for operating the valves complete all as directed by Engineer-in-charge. The water distribution systemof 1 & 2 Zone to be operated in 2 shift (8 Hours per shift) as per under mentioned or as directed by the Engr-in-charge. (a) First Shift - 0600 Hrs to 1400 Hrs - One valve man (b) Second Shift - 1400 Hrs to 2200 Hrs - One valve man. The details of water supply distribution system of 3 & 4 zone at Jalipa Mil Stn are as under: - (a) CI Sluice Valve 200/150/100/80 mm dia - 39 Nos within 1 KM. (b) Gate Valve 80/50/40 mm dia - 85 Nos within 1 KM.
Notes for Srl item Nos 1 to 5: (i) The contractor shall quote the rate for deputing the tradesman and reliever arrangement as per labour laws. (ii) PHO/FGM/Valve man shall be ITI qualified or having minimum three years of experience in maintenance and operation of water supply/DG Set/RO Plant/Chlorination plant etc. Qualification and experience certificates of the trdesman to be deployed shall be submitted by contractor for prior approval of Engr-in-Charge in writing. (iii) Wage paid by the contractor to the persons employed shall not be less than the minimum wages fixed by State/Central Government from time to time whichever is higher. The payment shall be made to the workers through NEFT to adhaar linked bank account of M&O employees/ staff and the bank statement of fair wages as per minimum labour wages as mentioned above shall be submitted along with the RARs/FB for payments. (iv) The contractor shall be responsible for the EPF, ESI, bonus, Safety etc as per existing Labour Rules/Acts/Regulations. (v) Contractor special attention is invited that payment of tradesman / labour shall be made only through Account payee cheque/NEFT and same shall be deposited in Adhar link account of tradesman / labour. Documentary evidence for the same shall be submitted to Engineer -in-Charge before payment of RAR / Final bill.
(vi) Necessary weekly off will be given to tradesman employed for this schedule as per existing rules and regulation of state /central govt. and necessary replacement will be provided by the contractor. Rates quoted for this schedule shall deemed to be included this provision. (vii) In case absence of any tradesman / workmen from any shift will be penalized with a penalty of double the rate quoted by the contractor in addition to the shift not taken in to consideration for payment. Attendant / tradesman wanting leave will get it sanctioned before proceeding on leave along with the name of individual who will be performing his duty/shift in his absence. No replacement of tradesman/workmen without the knowledge of department will be allowed. (viii) Safety equipment's, tools and first aid kit will be provided by contractor to all tradesman without any extra cost to government. (ix) Log Sheet, Muster roll, attendance register shall be maintained by operator and get it signed by contractor ,JE E/M and Engr-in-Charge on daily basis. (x) The contractor shall close the doors/shutters of the installations properly with lock and key before leaving the installation. Contractor shall be held responsible for any theft or loss at the installation. Contractor shall make sure to have everything in installation under lock and key.
(xi) Cleaning of installations from inside and out side up to 15 Meters will be responsibility of the contractor. (xii) Contractor shall ensure that police verification is carried out for the persons employed by him.He will submit police verification of the individual before start of work. (xiii) Contractor will submit bank account Number, qualification certificates and other required details of the persons to be employed within 20 days from acceptance of contract otherwise penalty of Rs 100/- per day will be recovered from the contractor. (xiv) The contractor shall provide insurance cover to the tradesman employed by him and the department will not be responsible for any damages/loss to the personnel/human resources engaged by the contractor. (xv) All tradesman shall wear proper uniform, failing which a recovery of Rs 50/- per shift shall be recovered from the contractor's dues. (xvi)The contractor shall ensure proper handing taking over,between employed personnel's at the time of change of shift. (xvii) The rate quoted shall deemed to be included the cost of all the tools & plants required like torch,cells,batteries,shoes,umbrellas/rain coats etc.
M/s godara infratech and power industries
National Rewinding Works
BHARAT NIRMAN INFRASTRUCTURE COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .