Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.0 LAccepted-AOC MOHANBARI JEMES WARREN TINALI AIR PORT ROAD PO MOHANBARI ASSAM 786012 | DIBRUGARH | ASSAM | 786012 | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹49.1 L+₹4.2 L (9.40%)Rejected-Finance | L2 | Rejected-Finance Being other than lowest | |
| 3 | L3₹50.1 L+₹5.2 L (11.6%)Rejected-Finance | L3 | Rejected-Finance Being other than lowest | |
| 4 | L4₹51.9 L+₹7.1 L (15.8%)Rejected-Finance NAV PUKHARI ROAD MILLAN PALLY PO DIST TINSUKIA ASSAM 786 125 | TINSUKIA | DIBRUGARH | ASSAM | 786125 | L4 | Rejected-Finance Being other than lowest | |
| 5 | L4₹52.2 L+₹7.3 L (16.3%)Rejected-Finance AZARA THAKURIAPARA AZARA ASSAM 781 017 | KAMRUP METRO | ASSAM | 781017 | L4 | Rejected-Finance Being other than lowest |
| Sl No | Description | Qty | Unit | M/s Pramillabh Construction L4 | M/s Sashi Enterprise L6 | M/S P R SINGH AND SONS L8 | M/S P.K.B.CONSTRUCTION L1 | KP GHOSH AND CO L2 | M/S CHAKRA GOHAIN L7 | M/s Lalowari Electricals L5 | D N ENTERPRISE L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches n.exc 1.50 mtr wide but for additional 1.50 mtr (1.50 to 3.00 mtr) depth or part there of in depth beyond the first 1.50 mtr for taking out / laying of under ground cable, pole, pipe, stay and getting out in soft soil strata including making good to the disbturbed surfaces such as hardstanding, footpath/ pavments complete all as specified and directed. | 0.16 | Cum | 507 ₹81.12 | 524 ₹83.84 | 544 ₹87.04 | 450 ₹72 | 420 ₹67.2 Lowest | 535 ₹85.6 | 509 ₹81.44 | 450 ₹72 |
| 2.00 | Excavation in trenches n.exc 1.50 mtr wide and n.exc 1.50 mtr deep for taking out/ laying of under ground cable, pole, pipe, stay and getting out in soft soil strata including making good to the disbturbed surfaces such as hardstanding, footpath/ pavments complete all as specified and directed. | 378 | Cum | 406 ₹1,53,468 Lowest | 419 ₹1,58,382 | 435 ₹1,64,430 | 465 ₹1,75,770 | 460 ₹1,73,880 | 428 ₹1,61,784 | 408 ₹1,54,224 | 465 ₹1,75,770 |
| 3.00 | Returning filling in including spreading leveling watering and well ramming in layers not exceeding 25cm spread any type of soil complete all as specified and directed. | 191.84 | Cum | 304 ₹58,319.36 | 314 ₹60,237.76 | 326 ₹62,539.84 | 210 ₹40,286.4 | 205 ₹39,327.2 Lowest | 321 ₹61,580.64 | 306 ₹58,703.04 | 210 ₹40,286.4 |
| 4.00 | Removing excavated materials n.exc 50 mtr and depositing where directed at a level nexc 1.50 mtr above the starting point complete all as specified and directed. | 186.32 | Cum | 507 ₹94,464.24 | 524 ₹97,631.68 | 544 ₹1,01,358.08 | 460 ₹85,707.2 | 380 ₹70,801.6 Lowest | 535 ₹99,681.2 | 509 ₹94,836.88 | 460 ₹85,707.2 |
| 5.00 | M&L for sand cushioning to under ground cable provided with a layer of sand 8 cm depth before laying of cable and 15 cm depth after laying and stretching the cable complete all as specified and directed.
Note: Punned thickness of sand shall be measured & paid. | 136.08 | Cum | 1,420 ₹1,93,233.6 Lowest | 1,467 ₹1,99,629.36 | 1,523 ₹2,07,249.84 | 1,450 ₹1,97,316 | 1,620 ₹2,20,449.6 | 1,498 ₹2,03,847.84 | 1,426 ₹1,94,050.08 | 1,450 ₹1,97,316 |
| 6.00 | M&L for well burnt sub class 'B' bricks of nominal size 230X115X75 mm abutting each other for mechanical protection of cable with width equal to lenght of brick complete all as specified and directed. | 10,957 | Each | 20 ₹2,19,140 Lowest | 21 ₹2,30,097 | 21 ₹2,30,097 | 30 ₹3,28,710 | 24.2 ₹2,65,159.4 | 21 ₹2,30,097 | 20 ₹2,19,140 Lowest | 30 ₹3,28,710 |
| 7.00 | Relaying of serviceable bricks retrive from item no 13 of any size abutting each other for mechanical protection of cable with width equal to lenght of brick complete all as specified and directed. | 3,652 | Each | 4 ₹14,608 Lowest | 4 ₹14,608 Lowest | 4 ₹14,608 Lowest | 10 ₹36,520 | 8.56 ₹31,261.12 | 4 ₹14,608 Lowest | 4 ₹14,608 Lowest | 10 ₹36,520 |
| 8.00 | M&L for boring/ drilling (horizontally) hole manually under existing road, pavement, hard standing (maximum 10mtr in width) suitable for passing GI tubing upto 100 mm bore complete all as specified and directed. | 70 | RM | 1,217 ₹85,190 | 1,257 ₹87,990 | 1,305 ₹91,350 | 1,250 ₹87,500 | 1,215 ₹85,050 Lowest | 1,283 ₹89,810 | 1,223 ₹85,610 | 1,250 ₹87,500 |
| 9.00 | S&F in replacement GI protection pipe of 40 mm dia light grade for cable protection including all fittings laid in trenches or fixed on pole/ walls with mild steel clamps, bolts, nuts and washers complete all as specified and directed.
Note:- Earth work shall be measured and paid separately. | 40 | RM | 761 ₹30,440 | 786 ₹31,440 | 817 ₹32,680 | 700 ₹28,000 Lowest | 712 ₹28,480 | 803 ₹32,120 | 764 ₹30,560 | 700 ₹28,000 Lowest |
| 10.00 | All as per item No. 9.00 above but pipe of 50 mm dia complete all as specified and directed. | 50 | RM | 913 ₹45,650 | 943 ₹47,150 | 979 ₹48,950 | 800 ₹40,000 Lowest | 825 ₹41,250 | 963 ₹48,150 | 917 ₹45,850 | 800 ₹40,000 Lowest |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
28 Apr 2026, 6:00 pmClosed
GE (AF) Mohanbari
Garrison Engineer (AF) Mohanbari Mohanbari Post Dibrugarh Assam 786012
REPAIR/ MAINT OF LT UNDER GROUND CABLE, JOINTS, OVERHEAD CONDUCTOR LINE, MAIN PANEL, MCCB, BUSBAR CHAMBER, AND CONNECTING ALLIED WORKS AF STN MOHANABRI
2026_MES_759529_1
8001/779/E8
Open Tender
Civil Works
Item Rate
270 days
Mohanbari
Class D, category b(i)
7 documents required · 7 mandatory
₹500
Garrison Engineer (AF) Mohanbari
₹90,000
Yes
10 Jun 2026
8 Apr 2026
29 Apr 2026
8 Apr 2026
28 Apr 2026
22 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation in trenches n.exc 1.50 mtr wide but for additional 1.50 mtr (1.50 to 3.00 mtr) depth or part there of in depth beyond the first 1.50 mtr for taking out / laying of under ground cable, pole, pipe, stay and getting out in soft soil strata including making good to the disbturbed surfaces such as hardstanding, footpath/ pavments complete all as specified and directed. | - | Cum | - | - |
| - | Excavation in trenches n.exc 1.50 mtr wide and n.exc 1.50 mtr deep for taking out/ laying of under ground cable, pole, pipe, stay and getting out in soft soil strata including making good to the disbturbed surfaces such as hardstanding, footpath/ pavments complete all as specified and directed. | - | Cum | - | - |
| - | Returning filling in including spreading leveling watering and well ramming in layers not exceeding 25cm spread any type of soil complete all as specified and directed. | - | Cum | - | - |
| - | Removing excavated materials n.exc 50 mtr and depositing where directed at a level nexc 1.50 mtr above the starting point complete all as specified and directed. | - | Cum | - | - |
| - | M&L for sand cushioning to under ground cable provided with a layer of sand 8 cm depth before laying of cable and 15 cm depth after laying and stretching the cable complete all as specified and directed.
Note: Punned thickness of sand shall be measured & paid. | - | Cum | - | - |
| - | M&L for well burnt sub class 'B' bricks of nominal size 230X115X75 mm abutting each other for mechanical protection of cable with width equal to lenght of brick complete all as specified and directed. | - | Each | - | - |
| - | Relaying of serviceable bricks retrive from item no 13 of any size abutting each other for mechanical protection of cable with width equal to lenght of brick complete all as specified and directed. | - | Each | - | - |
| - | M&L for boring/ drilling (horizontally) hole manually under existing road, pavement, hard standing (maximum 10mtr in width) suitable for passing GI tubing upto 100 mm bore complete all as specified and directed. | - | RM | - | - |
| - | S&F in replacement GI protection pipe of 40 mm dia light grade for cable protection including all fittings laid in trenches or fixed on pole/ walls with mild steel clamps, bolts, nuts and washers complete all as specified and directed.
Note:- Earth work shall be measured and paid separately. | - | RM | - | - |
| - | All as per item No. 9.00 above but pipe of 50 mm dia complete all as specified and directed. | - | RM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tender.pdf
Tender Documents • 1.48 MB
BOQ_850739.xls
BOQ • 0.91 MB
Amntdate.pdf
PDF • 0.35 MB
Amnt.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .