Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹74,146.78Admitted-Fee/PreQual/Technical/Finance | -17.89% | ₹74,146.78 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹81,270.60+₹7,123.82 (9.61%)Admitted-Fee/PreQual/Technical/Finance | -10.00% | ₹81,270.60+₹7,123.82 (9.61%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹90,000
EMD Value
₹1,800
Closing Date
27 Jul 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON SRINAGAR MUNICIPAL CORPORATION REGAL LANE LAL CHOWK
Const. of lane/drain near h/o Abdul Rehman Dar at Rather Mohalla, shunglipora
2026_HAUDD_316275_3
SHORT Term NOTICE INVITING ETENDER No. 15 of 2026-2027 Dated 15.07.2026 RRWD SMC
Open Tender
Civil Works
Percentage
30 days
Rather Mohalla, shunglipora
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹200
FA/CAO AC NO 0216010200000007
₹1,800
29 Jul 2026
16 Jul 2026
28 Jul 2026
17 Jul 2026
27 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Engagement of Labourers for site clearance | 6 | No. | 553 | ₹3,318 |
| - | Supplyinng and laying Stone Soling / Khakh Bajri with horizonntal level including all carriages complete job | 5.57 | Cum | 850 | ₹4,734.5 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3.39 | Cum | 5,202.9 | ₹17,637.83 |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 4.48 | Cum | 7,104.35 | ₹31,827.49 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more | 224 | Kgs | 123.2 | ₹27,596.8 |
| - | Carriage of material by mechanical Transport: Sand/Aggregate | 10.7 | Cum | 344.49 | ₹3,686.04 |
| - | Taking of Photographs before, during after execution of work and providing and fixing of signboard complete job | 1 | job | 1,500 | ₹1,500 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_1030558.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .