Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance S F NO 472 C3 VINAYAGA GARDEN SUKKALIYUR KARUR 639 003 | KARUR | KARUR | TAMIL NADU | 639003 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
8 Jul 2021, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/SEDC/Salem
O/o.The Superintending Engineer, TANGEDCO, Kamaraj Nagar Colony, Udayapatty, Salem - 636014
Survey Supply Erection Testing and Replacement of 22 KV ACSR 2.59 mm Conductor by 22KV HT ABl Cable of Size 3x50 Sq mm Phase 1x50 Sq mm Bare Messenger in Yercaud feeder in Yercaud I Section
2021_EB_203086_1
SE/SEDC/WC.008/2021-22 Dt.15.06.2021
Open Tender
Electrical Works
Works
90 days
Yercaud
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹50,000
9 Jul 2021
18 Jun 2021
9 Jul 2021
18 Jun 2021
8 Jul 2021
18 Jun 2021
90 days
Amount
Supply of materials
Supply of 22 KV HT Aerial Bunched Cable of size 3x50 Sq.mm (Phase) + 1x50 Sq.mm Bare messenger (Inclusive of 5% Sag)
Suspension Clamp Assembly including Pole Clamp
Dead End Clamp / Anchor Clamp Assembly including brackets, Pole Clamp
End Termination Kits
Cable Straight Through Joint Kits
T Joint Kit
Pole Concreting Materials
Stay Pit Concreting Materials
Grounding Connection for Messenger Wire
Spiral Electrodes
Labour Charges
Labour Charges for Erection of 22 KV HT Aerial Bunched Cable of size 3x95 (Phase) + 1x95 Sq.mm Bare messenger (Inclusive of 5% Sag)
Erection of Suspension Clamp Assembly including Pole Clamp
Erection of Dead End Clamp / Anchor Clamp Assembly including Brackets, Pole Clamp
Erection of End Termination Kits
Erecton of Cable Straight Through Joint Kit
Erection of T Joint Kit
Erection of RSJ Poles 36' (with Base Plate)
Erection of Stay Set/ Guy Set
Erection of 22 KV LAS
Concreting of Guy Set
Concreting of Pole
Grounding Connection for Messenger Wire
Erection of Spiral Electrodes
Dismantling of All size of Conductor
Dismantling of V Cross Arm (4' x 6")
Dismantling of Tapping Channel
Dismantling of Back Clamp
Dismantling of HT TI Fitting
Dismantling of 22 KV Pin Insulator and GI Pin
Dismantling of 11 KV Polymer Composite Disc Insulator with metal parts
E.S.I. @ 3.25 % should be Entered by the Bidder.
E.P.F. @ 13 % should be Entered by the Bidder.
G.S.T. @ 18% should be Entered by the Bidder.
SRI LAKSHMI POWER INFRA
RMITHA POWER AND INFRA (OPC) PRIVATE LIMITED
stage.html
html • 0.02 MB
finance_241781.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .