| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.1 LAccepted-AOC VILLAGE BALHI DHAVER P O DHANGOTA BARSAR TEHSIL DHATWAL DISTT HAMIRPUR H P 176040 | HAMIRPUR | HAMIRPUR | HIMACHAL PRADESH | 176040 | ₹31.1 L | L1 | Accepted-AOC awarded |
| 2 | L2₹33.0 L+₹1.9 L (6.06%)Rejected-Finance VILLAGE GASOTA PO BOHNI TEHSIL DISTRICT HAMIRPUR | ₹33.0 L+₹1.9 L (6.06%) | L2 | Rejected-Finance high amount |
| 3 | L3₹34.2 L+₹3.0 L (9.80%)Rejected-Finance | ₹34.2 L+₹3.0 L (9.80%) | L3 | Rejected-Finance high amount |
Tender Value
₹35.8 L
EMD Value
₹62,000
Closing Date
27 Mar 2026, 11:00 amClosed
EE HPSAMB
EE HPSAMB
Repair and Maintenance of Regulated Market Yard and Construction of Staff Quarter and Parking shed at RM Yard Hamirpur, Distt Hamirpur, H.P.
2026_HPAMB_132124_1
HMB-EC-11/92-Vol-XI
Open Tender
Civil Works
Percentage
90 days
Hamirpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
₹62,000
1 Apr 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolishing R.C.C./PCC work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material at dumpring site to be arranged by contractor at his own llevel and as per direction of Engineer - in- charge including all kind of mechanical as well as manual transportation charges and all taxes etc. | |||||
| 2Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of unserviceable material at dumpring site to be arranged by contractor at his own llevel and as per direction of Engineer - in- charge including all kind of mechanical as well as manual transportation charges and all taxes etc. | |||||
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 with 20 mm aggrigate including curing charges and excluding cost of form work as per HPPWD specification nd as per direction of Engineer - in- charge including all kind of mechanical as well as manual transportation charges and all taxes etc. | |||||
| 4Providing and laying mechanically mixed & vibrated cement concrete 1:3 :6(1cement :3 sand :6 graded stone aggregate 20mm. nominal size) including curing charges and excluding cost of form work as per HPPWD specification nd as per direction of Engineer - in- charge including all kind of mechanical as well as manual transportation charges and all taxes etc. | |||||
| 5 | Providing form work with steel plates 3.15mm (Three point one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, height of propping and centering in all heights. below supporting floor to ceiling and removal of the same for in – situ reinforced concrete and plain concrete work in foundation footings, basis of columns etcetera and mass concrete, including carriage of materials. Within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. | - | SQM | 260 | - |
| 6 | Providing form work with steel plates 3.15mm (Three point one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, height of propping and centering in all heights. below supporting floor to ceiling and removal of the same for in – situ reinforced concrete and plain concrete work in Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc., including carriage of materials. Within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. | - | SQM | 450 | - |
| 7 | Providing form work with steel plates 3.15mm (Three decimal one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, heights of propping and centering in all heights below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in flat surfaces such as soffits of suspended floors, roofs, landings, shelves, and the like floor, etc. up to any thickness, up to all floor level, including carriage of materials within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. | - | SQM | 448 | - |
| 8 | Providing form work with steel plates 3.15mm (Three point one five millimeters)thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, height of propping and centering in all heights below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in beams cantilevers, girders and lintels, sides and soffits of beams, beam haunchings, cantilevers, bressumers and lintels upto any depth/heights, up to all floor level, including carriage of materials within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. | - | SQM | 490 | - |
| 9 | Providing form work with steel plates 3.15mm (Three point one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering, strutting and propping etc, with wooden battens and ballies, height of propping and centering in all heights below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in Columns, pillars, posts and struts, (circular or curved in plan), up to all floor level, including carriage of materials within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. | - | SQM | 495 | - |
| 10 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge in all works upto plinth level complete as per HPPWD specifications or as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals.The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government. | - | CUm | 7,455 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_195359.xls
BOQ • 0.48 MB
SBD_1_Staffquarter_Hamirpur.pdf
Tender Documents • 7.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .