Executive Engineer
Electric Division JPDCL Udhampur
Creation of substation along with Ht and LT line
2021_PDD_152557_1
ED/UDH/60 of 2021-22 dt. 10-12-2021
Open Tender
Electrical Works
Turn-key
60 days
at Chuntagali of Pyt Ladda- B in Block Moungri
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer, Electric Division JPDCL
₹37,400
15 Jan 2022
10 Dec 2021
12 Jan 2022
10 Dec 2021
10 Jan 2022
10 Dec 2021
10 Dec 2021 - 17 Dec 2021
Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning of HT Line at Chuntagali W. No. 2 of Pyt. Ladda-B Block Moungri
8 mtr long ST Pole (ST-410SP15) for HT Line
GI V Cross -arm with top Bracket including clamps
GI Channel X-arm including clamps and Angle for braces
0.02 ACSR Squirrel conductor
Galvanized Nuts and Bolts
11KV Pin Insulator (Polymeric) with Pins (12kv, 5KN) Creepage Distance 320mm
11KV Disc Insulators (Polymeric 45KN ) creepage distance 320 mm with tension fittings
Earthing complete by GI Rod 20 mm, 2.5 mtr long through G.I. Strip 32X3 mm in HT Lines
Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning of HT Line of 25 kva substation including other materials at Chuntagali W. No. 3 of Pyt. Ladda-B Block Moungri
8 mtr long ST Pole (ST-410SP15) for HT Line
GI V Cross -arm with top Bracket including clamps
GI Channel X-arm including clamps and Angle for braces
0.02 ACSR Sqrirrel conductor
Galvanized Nuts and Bolts
11KV Pin Insulator (Polymeric) with Pins (12kv, 5KN) Creepage Distance 320mm
11KV Disc Insulators (Polymeric 45KN ) creepage distance 320 mm with tension fittings
Earthing complete by GI Rod 20 mm, 2.5 mtr long through G.I. Strip 32X3 mm in HT Lines
Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning of 2 no. 25 kva substation including other materials at Chuntagali W.No. 3 & W. No. 2 of Pyt. Ladda-B Block Moungri in District Udhampur
11/0.433kV, 3-phase 25KVA Distribution Transformer with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound, and with LV Cable Box having detachable Aluminium Gland plate
Gapless surge arrestor 9KV, 10KA, LA with polymer housing station type
11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
11 kV Horn Gap Fuse Set 3 Phase 200A
70 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Alumnium Stranded Conductor FRLS type
9 mtr. Long ST Pole (ST-410 SP33)
11kV Polymeric composite Disc Insulator 12kV, min failing load 45kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm with tension fitting
GI Channel/Angle/Flat of sizes including clamps
Galvinized Nuts and Bolts.
32/63 Amps TPN Switch Disconnector Fuse Unit
Cement bottoming of ST poles in 1:2:4 mix as per REC standards 0.45 Cum/Pole
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239. GI Strip for neutral earthing of size 50 mm x 6 mm & 32mm x 3mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning of LT Line (3-phase, 4 -wire) at Chuntagali W. No. 2 for 25kva Substation of Pyt. Ladda-B Block Moungri in District Udhampur
8 mtr. Long ST Pole( ST-410 SP15)
G.I. Mukki Clamps
0.03 ACSR Conductor Weasel
16kN Polymer Shackle Insulators
Galvinized Nuts and Bolts.
Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
LT Line Spacers
Earthing complete by GI Rod 20 mm, 2.5 mtr long through G.I. Strip 32X3 mm for LT
Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning of LT Line (3-phase, 4 -wire) at Chuntagali W. No. 3 for 25kva Substation of Pyt. Ladda-B Block Moungri in District Udhampur
8 mtr. Long ST Pole (ST-410 SP15)
G.I. Mukki Clamps
0.03 ACSR Conductor Weasel
16kN Polymer Shackle Insulators
Galvinized Nuts and Bolts.
Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
LT Line Spacers
Earthing complete by GI Rod 20 mm, 2.5 mtr long through G.I. Strip 32X3 mm for LT
AJAY KAPOOR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .