Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹49.2 L (45.5%)Admitted-Finance | ₹1.6 Cr+₹49.2 L (45.5%) | L2 | Admitted-Finance |
| 3 | L3₹2.4 Cr+₹1.3 Cr (124.8%)Admitted-Finance | ₹2.4 Cr+₹1.3 Cr (124.8%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SUSMITA ENGINEERING WORKS L3 | Aaditech Solutions L2 | Praveen Kumar Malik L1 |
|---|---|---|---|---|---|---|
| 1.00Magnetic Valve (Part No 301484) | ||||||
| 1.01 | Design & Development Cost (One time) | 1 | Nos | 1,40,000 ₹1,40,000 | 2,00,000 ₹2,00,000 | 92,000 ₹92,000 Lowest |
| 1.02 | Basic Cost (a+b+c) | 509 | Nos | 21,300 ₹1,08,41,700 | 13,500 ₹68,71,500 | 8,100 ₹41,22,900 Lowest |
| 1.02 | Material Cost (a) | 509 | Nos | 9,200 ₹46,82,800 | 7,000 ₹35,63,000 | 5,800 ₹29,52,200 Lowest |
| 1.02 | Labour (b) | 509 | Nos | 7,900 ₹40,21,100 | 5,000 ₹25,45,000 | 2,500 ₹12,72,500 Lowest |
| 1.02 | Over heads (c) | 509 | Nos | 4,200 ₹21,37,800 | 3,000 ₹15,27,000 | 2,800 ₹14,25,200 Lowest |
| 1.03 | Total (Total value of above rows of this item) | 509 | Nos | - | - | - |
| 2.00Fan Motor (Part No 242395) | ||||||
| 2.01 | Design & Development Cost (One time) | 1 | Nos | 1,45,000 ₹1,45,000 | 1,50,000 ₹1,50,000 | 65,000 ₹65,000 Lowest |
| 2.02 | Basic Cost (a+b+c) | 29 | Nos | 29,600 ₹8,58,400 | 9,500 ₹2,75,500 | 8,000 ₹2,32,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
14 Sept 2023, 11:00 amClosed
Brig (Indigenisation)
DTE OF INDIGENISATION/ MGS BRANCH WEST BLOCK 3 R K PURAM DELHI 110066
INDIGENISATION OF ITEMS MAGNETIC VALVE, FAN MOTOR AND SOLENOID SWITCH
2023_ARMY_613085_1
6051/DOI/ICE/MGS/RFP NO 202003003/MAGNETIC VALVE
Open Tender
Mechanical Maintenance Services
Supply
180 days
New Delhi
AS PER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹0
₹2.5 L
Yes
DSW (EE), 512 ABW, KIRKEE, PUNE
7 Nov 2023
10 Aug 2023
14 Sept 2023
10 Aug 2023
14 Sept 2023
10 Aug 2023
10 Aug 2023 - 31 Aug 2023
24 Aug 2023
Amount
Magnetic Valve (Part No 301484)
Design & Development Cost (One time)
Basic Cost (a+b+c)
Material Cost (a)
Labour (b)
Over heads (c)
Total (Total value of above rows of this item)
Fan Motor (Part No 242395)
Design & Development Cost (One time)
Basic Cost (a+b+c)
Material Cost (a)
Labour (b)
Over heads (c)
Total (Total value of above rows of this item)
Solenoid Switch (Part No 210995)
Design & Development Cost (One time)
Basic Cost (a+b+c)
Material Cost (a)
Labour (b)
Over heads (c)
Total (Total value of above rows of this item)
Aaditech Solutions
SUSMITA ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .