| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹1Accepted-AOC | L2 | Accepted-AOC Rejected due to rates on higher side |
Tender Value
₹45.5 L
EMD Value
₹45,510
Closing Date
20 Apr 2021, 5:00 pmClosed
Executive Engineer, Indri W/S Division, karnal
Executive Engineer, Indri W/S Division, The Mall Road Karnal
Construction Outfall Gate at RD 0 and Sump Well at RD 13400 and remodeling of 1 No. Culvert at RD 3300 Bazida Drain
2021_HRY_168420_1
2608/33-A dated 09/04/2021
Open Tender
Civil Works
Item-rate/Agreement basic
240 days
Karnal
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,500
₹45,510
Yes
16 Jun 2021
12 Apr 2021
22 Apr 2021
12 Apr 2021
20 Apr 2021
12 Apr 2021
Amount
Works Details
Dismantling brick work, Tile masonry or Tile lining and Tile Terracing in cement as per HSR item No. 8.5 (b)
Dismantling reinforced cement concrete with cleaning and straightening and cutting of bars if required as per HSR No. 8.6 (e)
Dismentalling CC plane 1:3:6 as per HSR item 8.6 © as a rate
Earth work excavation in all kind of soil with an avg. lead of 45 Mtr. with dressing and all other allowances if any as per HSR item No.6.2 (b)©
Extra for compaction of earth as per specification including watering the earth laid in 25 cm. layers. As per HSR 6.2 G(i)
Earth work excavation in Foundation, Trenches etc. in all kind of soils, not exceeding 2 mtrs. Depth including dressing of bottom and sides of trenches etc. as per HSR item No. 6.6 (b) I
Shuttering for faces of concrete foundation and foundation beams (HSR item No. 9.13
Centering and shuttering for slab with smooth exposed surface upto to 3 mtr. Span as per HSR 9.18(b)
Providing & laying in position machine batched and machine mixed design mix M-15 grade cement conc. For plain cement conc. work, using cement content as per approved design mix,including pumping of conc. to site of laying but excluding the cost of centering, shuttring, finishing and reinfocment, including admixturte in recommneded proportions as per IS: 9103 to accelerate , retared setting of conc., improve workability without impairing strength durabality as per direction of engineer incharge in F & P ( Note :- cement content considered in this item is @ 240 kg per Cum) as per HSR item No.10.64
First class brick work laid in cement sand mortar 1:3 in foundation & Plinth including S/o & C/o material and labour charges complete in all respect as per drawing and design supplied by the Department and as per PWD Specification. HSR item No. 11.5
Providing & laying in position machine batched and machine mixed design mix M-25 grade cement conc. For reinforced cement conc. work, using cement content as per approved design mix,including pumping of conc. to site of laying but excluding the cost of centering, shuttring, finishing and reinfocment, including admixturte in recommneded proportions as per IS: 9103 to accelerate , retared setting of conc., improve workability without impairing strength durabality as per direction of engineer incharge in 1st story upto 4 mtr. Above plinth level ( Note :- cement content considered in this item is @ 330 kg per Cum) as per HSR item No. 10.66
Fe500 EQR TMTsteel bars for R.C.C works, where not included in the complete rate of RCC including bending, binding and placing in position complete. (HSR item No.18.22).
Preparing water & ramming surface for laying Conc. ( HSR item No. 10.122 ) b (i).
Providing & fixing PVC rain water pipe 6 Kg. pressure of ISI mark in cement mortar during masonry work as per HSR item No. 13.89 (a)
Providing, lowering,cutting,jointing and testing RCC pipe class NP3 as per IS 458-2003 with Spigot & socketted joints manufactured with ISI marked sulphate resistsnce cement as per ISI 12330 with rubber rings ISI marked, antitermmite as required at site, into trenches, for all depths and laying out the same to correct alignment as per HSR item No.28.60 (v) for 600mm dia pipe
Removing R.C.C. hume pipe 600 mm dia. HSR item no. 8.35 (b )
Providing and fixing premoulded bitumenous joints 20mm wide filler for expension joints complete in all respect. (HSR item No. 24.35 (b)
Filing sand behind the structure
Cement pointing 1:3 deep variety on brick and tile work (HSR item No.15.61)
Laying of Dry brick bats as per HSR 10.116
Dry brick on edge paving sand grouted over 50mm thick earth mud plaster as per HSR item No 14.20.
Prepration of plaster for concrete surfaces for painting, including sand papering the surface, applying one coat of linseed oil as per HSR item No. 16.24
Painting two coat of exterior acrylic emlusion paint HSR item no. 16.79 (b)
Lease for land for diversion
Earth work excavation in all kind of soil with an avg. lead of 15 Mtr. undressed and all other allowances if any as per HSR item No.6.2 (b)©
Rehandling earth work with an avg. lead 15 metre including all other allowances
Providing & laying in position machine batched and machine mixed design mix M-25 grade cement conc. For plain cement conc. work, using cement content as per approved design mix,including pumping of conc. to site of laying but excluding the cost of centering, shuttring, finishing and reinfocment, including admixturte in recommneded proportions as per IS: 9103 to accelerate , retared setting of conc., improve workability without impairing strength durabality as per direction of engineer incharge in 1st story upto 4 mtr. Above plinth level ( Note :- cement content considered in this item is @ 330 kg per Cum) as per HSR item No. 10.66
Providing and fixing gate and gearing as per design and specification complete in all respect
Centering & Shuttering for faces of walls, partitions, retaining walls weal staining and the like (vertical or battering)including attached pilasters, buttresses etc. as per HSR item No. 9.5
Credit for brick bats
Credit for reinforcement
Credit for NP2 Pipe 600 mm dia
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .