Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Finance 20 5 B P ROAD KOLKATA 700041 | KOLKATA | WEST BENGAL | 700001 | ₹6.9 L | L1 | Admitted-Finance |
| 2 | L2₹7.0 LAdmitted-Finance 20 C K M NASKAR ROAD KOLKATA 700 040 | KOLKATA | WEST BENGAL | 700040 | ₹7.0 L | L2 | Admitted-Finance |
| 3 | L3₹7.0 LAdmitted-Finance 216 RABINDRA PALLY BLOCK D KOLKATA 700086 | KOLKATA | WEST BENGAL | 700086 | ₹7.0 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BARISAL TRADING COMPANY L3 | ASHUTOSH DAS AND CO. L2 | PP CONCERN L1 |
|---|---|---|---|---|---|---|
| 1.00 | Thorough servicing and overhauling of 1.5 ton and 2 ton capacity split type air conditioner machine by cleaning, oiling of the dismantled spare parts like cooling coil, blower motor, runner motor, oscillating motor, fan, condenser, capacitor etc for indoor and outdoor unit by supplying of chemicals, petrol, thinner etc as and where applicable and also cleaning of other spares and changing of defective spares as per entire satisfaction of the EIC From 01-04-2026 to 31-03-2027 (Total No of Machine- 17 Nos)
Total number of machine - 17 Nos for EE, Alipur Division | 12 | Months | 13,475 ₹1.6 L | 13,450 ₹1.6 L | 13,410 ₹1.6 L |
| 2.00 | Testing of Addressable Fire Alarm Panel, Addressable Smoke Detector, Addressable Manual Call Point, Addressable Hooter, Fire Sprinkler, Fire Sprinkler Pipe Line, Fire Sprinkler Control Valve, Monthly inspection one time at site and as & when required, Any parts replacement shall cost extra during AMC period W.E.F 01-04-2026 to 31-03-2027 | 12 | Months | 19,275 ₹2.3 L | 19,201 ₹2.3 L | 19,186 ₹2.3 L |
| 3.00Thorough servicing and overhauling of 1.5 ton / 2 ton / 3 ton tower type, air conditioner machine by cleaning, oiling of the dismantled spare parts like cooling coil, blower motor, runner motor, oscillating motor, fan, condenser, capacitor etc for indoor and outdoor unit by supplying of chemicals, petrol, thinner etc as and where applicable and also cleaning of other spares and changing of defective spares as per entire satisfaction of the EIC W.E.F 01-04-2026 to 31-03-2027 | ||||||
| 3.01 | Total number of machine - 15 Nos for EE, SMD | 12 | Months | 11,925 ₹1.4 L | 11,875 ₹1.4 L | 11,833 ₹1.4 L |
| 3.02 | Total No. of Machine- 17 Nos for EE, SWD-I & SE, SWC | 12 | Months | 13,510 ₹1.6 L | 13,450 ₹1.6 L | 13,410 ₹1.6 L |
| 4.00N.B. 1. The work should be taken up once in a month or as per direction of the EIC 2. A printed log book must be maintained during maintenance work and signed by the concerned JE / AE. 3. Necessary spares will be supplied by the department. 4. Consumable item such as chemical, petrol, thinner etc will be supplied by the agency free of cost. | ||||||
| 5.00 | Add GST @ 18% | 1 | Item | - | - | - |
Tender Value
Refer Docs
EMD Value
₹16,700
Closing Date
16 Mar 2026, 5:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla
Operation and Maintenance of Air Conditioning system and Fire fighting arrangement at Office of the EE, SMD, PHE Dte. , EE , Alipore Division ,PHE Dte, EE, S 24pgs W/S Division-I, PHE Dte. and Office of the SE, S24pgs W/S circle, PHE Dte.
2026_PHED_1013086_3
WBPHE/EE/SMD/NIeT-62 of 2025-26
Open Tender
Miscellaneous Works
365 days
South 24 Pgs
Please refer Tender documents.
7 documents required · 7 mandatory
₹16,700
23 Mar 2026
3 Mar 2026
18 Mar 2026
3 Mar 2026
16 Mar 2026
3 Mar 2026
Thorough servicing and overhauling of 1.5 ton and 2 ton capacity split type air conditioner machine by cleaning, oiling of the dismantled spare parts like cooling coil, blower motor, runner motor, oscillating motor, fan, condenser, capacitor etc for indoor and outdoor unit by supplying of chemicals, petrol, thinner etc as and where applicable and also cleaning of other spares and changing of defective spares as per entire satisfaction of the EIC From 01-04-2026 to 31-03-2027 (Total No of Machine- 17 Nos) Total number of machine - 17 Nos for EE, Alipur Division
Testing of Addressable Fire Alarm Panel, Addressable Smoke Detector, Addressable Manual Call Point, Addressable Hooter, Fire Sprinkler, Fire Sprinkler Pipe Line, Fire Sprinkler Control Valve, Monthly inspection one time at site and as & when required, Any parts replacement shall cost extra during AMC period W.E.F 01-04-2026 to 31-03-2027
Thorough servicing and overhauling of 1.5 ton / 2 ton / 3 ton tower type, air conditioner machine by cleaning, oiling of the dismantled spare parts like cooling coil, blower motor, runner motor, oscillating motor, fan, condenser, capacitor etc for indoor and outdoor unit by supplying of chemicals, petrol, thinner etc as and where applicable and also cleaning of other spares and changing of defective spares as per entire satisfaction of the EIC W.E.F 01-04-2026 to 31-03-2027
Total number of machine - 15 Nos for EE, SMD
Total No. of Machine- 17 Nos for EE, SWD-I & SE, SWC
N.B. 1. The work should be taken up once in a month or as per direction of the EIC 2. A printed log book must be maintained during maintenance work and signed by the concerned JE / AE. 3. Necessary spares will be supplied by the department. 4. Consumable item such as chemical, petrol, thinner etc will be supplied by the agency free of cost.
Add GST @ 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 1.14 MB
Tendernotice_3.pdf
PDF • 0.06 MB
Tendernotice_4.pdf
PDF • 0.24 MB
BOQ_2499889.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid