Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.2 LAccepted-AOC | ₹75.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹75.6 L+₹41,641.70 (0.55%)Rejected-Finance | ₹75.6 L+₹41,641.70 (0.55%) | L2 | Rejected-Finance L2 |
| 3 | L3₹75.7 L+₹45,427.31 (0.60%)Rejected-Finance | ₹75.7 L+₹45,427.31 (0.60%) | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
9 Mar 2026, 12:00 pmClosed
SE RED MZP
JHANVI HOTEL PUTLIGHAR MIRZAPUR
V.K. KONE KE GRAM P KOTA KE GAURAHI SAMPARK MARGE SE RAMBALI BHIYA KE GHAR TAK SAMPARK MARGE KA NIRMAN
2026_REDUP_1121651_1
697/RED SBR/ 2025-26 DT- 30.01.2026
Open Tender
Civil Works
Percentage
120 days
KONE
AS PER NIT AND T2
2 documents required · 2 mandatory
₹3,687
₹2 L
5 Aug 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation ordinary soil for structures as per drawing and techanical specification clause 305 including setting out, construction of shoring and bracing, removal of stumps and other deleterous material and disposal up to a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 264.38 | cum | 381.9 | ₹1,00,966.72 |
| 2 | Plain Cement Concrete (PCC) M-10 (1:3:6 Nominal Mix) in open foundation complete as per drawing and techanical specification Clause 802 | 30.8 | cum | 5,444.93 | ₹1,67,703.84 |
| 3 | Stone Masonary work in cement mortor ( 1:4 ) in foundation complete asper drawing and techanical specification clause 702,704,1202 and 1203 (1st sort) | 165.84 | cum | 5,284.95 | ₹8,76,456.11 |
| 4 | Stone Masonary work in cement mortor ( 1:5 ) in super structure complete asper drawing and techanical specification clause 702,704,1202 and 1203 (1st sort) | 133.67 | cum | 4,341.88 | ₹5,80,379.1 |
| 5 | Providing and laying Reinforced Cement Concrete in Superstructure as per drawing and techanical specification 800 ( Excluding cost of Teinforcement ) | 9 | cum | 7,759.13 | ₹69,832.17 |
| 6 | Supply fitting and placing MS bar reinforcement in superstructure complete as per drawing and techanical specification Clause 1002 | 10.6 | Qtl | 6,821.29 | ₹72,305.67 |
| 7 | Cement pointing with cement mortar consisting of 1 part cement and 3 part of coarse sand as per drawing and specification clauses 613.3,1204 | 177.87 | cum | 78.95 | ₹14,042.84 |
| 8 | Providing PCC M-20 (1:2:4) archtectural coping on the top of wing / return wall . Etc. complete asper drawing and techanical spec.clause 615,710 and 1204.3.11 | 4.35 | cum | 5,968.19 | ₹25,961.63 |
| 9 | Providing weep holes in brick masonry/stone masonry plain/reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structure slope of 1(V)20(H) towards drawing face complete as per drawing and technical specification clauses 614,709,1204.3.7 | 50 | R/M | 106.4 | ₹5,320 |
| 10 | Providing and laying Reinforcement cement concrete pipe Np3 ( burried conducts) on first class bedding of granular material in Single row including collar with cement mortar 1:2 but excluding excavation, protection work, backing, concrete and masonary works in head walls and parapet. ( 600 mm dia ) MORD 1100 | 15 | R/M | 3,496 | ₹52,440 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.37 MB
BOQ_2087113.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .