Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical BHUBANESWAR MUNICIPAL CORPORATION BHUBANESWAR | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical PLOT NO 146 498 SHREE VIHAR PO PATIA PS CHANDRASEKHARPUR BHUBANESWAR KHORDHA | BHUBANESWAR | KHORDHA | ODISHA | Admitted-Fee/PreQual/Technical |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
11 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (Central Tender Cell)
Central Tender Cell, BMC, ICOMC Tower, Unit-9, Satyanagar
Construction of roads and drains from Backside of Angan Hotel near T.V. Rao house and other locations in ward no 12
2026_ORULB_144262_1
BMC-EE-Tender Cell-84/2026-27 dt. 23.10.2026
Open Tender
Civil Works - Others
Percentage
210 days
BMC, AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.1 L
Yes
Office Chamber of EE(Central Tender Cell)
12 Nov 2026
27 Oct 2026
12 Nov 2026
27 Oct 2026
11 Nov 2026
27 Oct 2026
27 Oct 2026 - 3 Nov 2026
3 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning the existing B.T. surface with removal of foreign materials with brooms or soft brushes and finally dusting with old gunny bags and or compressed air to receive bituminous. | 5,491.99 | sqm | 5.59 | ₹30,700.22 |
| 2 | Labour for applying primer coat / tack coat, Using materials (Tack coat) for Bituminous surface for nominal bituminous surface, @ 0.20Kg/M2. | 5,491.99 | sqm | 30.41 | ₹1,67,011.42 |
| 3 | Providing laying, spreading and compacting graded stone aggregate to "WET MIX MACADAM" specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achive the desired density as per Clause 406 of MoSRT&H specification for road and bridge works | 222.73 | cum | 2,420.36 | ₹5,39,086.78 |
| 4 | Providind and laying "BITUMINOUS MACADAM" with hot mix plant using crushed aggregates of specified grading premixed with Bituminous binder of 60/70 penetration grade of bitumen transportred to site laid over a previously prepared surface with a hydrostatic paver finisher with mechanical control to the required grade level and alignment and rolling with smooth wheeled vibrating and tandem rollers to achieve the desired compaction as per clause 504 of MoSRT&H specification for Road works. | 274.58 | cum | 10,374.26 | ₹28,48,564.31 |
| 5 | Providing and laying semi dense bituminous concrete with batch type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen transporting the hot mix to work site laying with a hydro static paver finisher with mechanical control to the required grade, level and alignment rolling with smooth wheeled vibratory and tendem rollers to achieve the desired compaction as per clause 508 of MoSRT&H specification for road & bridge work. | 137.28 | cum | 14,158.95 | ₹19,43,740.66 |
| 6 | Providing and laying of hot applied thermoplastic compound 2.5mm thick including rafleat rising glass beads @ 250gms per sqmt area thickness of 2.5mm is exclusive of surface applied glass beads as per IRC-35. The finished surface to be level, uniform and free from streaks and holes etc complete. | 234.7 | sqm | 362.84 | ₹85,158.55 |
| 7 | Dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead etc complete. | 46.36 | cum | 877.16 | ₹40,665.14 |
| 8 | Earth work excavation in Hard soil using one cum Bucket Hydraulic Excavator with all leads and lifts and transpotation of ecavated matiral by mechcanical means. and direction of Engg -in- charge | 833.01 | cum | 209.95 | ₹1,74,890.45 |
| 9 | Carriage of Excavated earth by mechanical means within 5 km lead including loading and unloading with all cost conveyance T & P sundries etc complete as per direction of Engineer- in-charge. | 46.36 | cum | 160.68 | ₹7,449.12 |
| 10 | Supply and filling in foundation and plinth with river sand, in layers including watering, with cost, conveyance, royalties, and taxes of all materials, cost of all labour, carriage of water, sundries T & p required for the work etc all complete as per the specification & direction of E-I-C | 208.1 | cum | 588.9 | ₹1,22,550.09 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
DTCN_84.pdf
Tender Documents • 0.96 MB
BOQ_615482.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .