Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹26.2 LAccepted-AOC SOMNATH NAGAR SR NO 43 1 2 GREWAL HOUSING SOCIETY PUNE NAGAR ROAD WADGAON SHERI PUNE 411 014 | PUNE | PUNE | MAHARASHTRA | 411014 | 1st | Accepted-AOC The M/s Ganesh Enterprises is L1 bidder being accepted please. | |
| 2 | 2nd₹31.4 L+₹5.0 L (19.0%)Rejected-Finance | 2nd | Rejected-Finance Not being L1 | |
| 3 | 3rd₹31.4 L+₹5.1 L (19.2%)Rejected-Finance | 3rd | Rejected-Finance Not being L1 | |
| 4 | 4th₹34.1 L+₹7.7 L (29.2%)Rejected-Finance | 4th | Rejected-Finance Not being L1 | |
| 5 | 5th₹34.3 L+₹7.9 L (30.0%)Rejected-Finance S 15 SACRED WORLD OPP SACRED HEART TOWN WANWADI PUNE 411040 | PUNE | MAHARASHTRA | 411040 | 5th | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | Sunshine Ventures L2 | Galaxy Construction L4 | Ganesh Enterprises L1 | APB INFFRASTRUCTURE PVT LTD L3 | PAVEWAY CONSTRUCTIONS PRIVATE LIMITED L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Repair to potholes any depth, not exc 1 sqm each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting around edges to at least 25 mm in depth, making good by applying tack coat @ 5 kg per 10 sqm, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sq m, blinded with 0.09 cu m of stone chippings, 6.3 mm size and again well rammed (including supply of premixed macadam, binder and chippings) depth of potholes exc 30 mm all as specified and directed. | 30 | 10 Sqm | 1,500 ₹45,000 | 1,500 ₹45,000 | 1,000 ₹30,000 | 750 ₹22,500 | 300 ₹9,000 Lowest |
| 2.00 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm and depth of potholes exc 50mm and n exc 100mm deep complete all as specified and direted. | 90 | 10 Sqm | 100 ₹9,000 | 100 ₹9,000 | 50 ₹4,500 | 220 ₹19,800 | 15 ₹1,350 Lowest |
| 3.00 | M & L Laying and compacting 75 mm thick (compacted thickness) Wet Mix Macadam (WMM) grading as pe table 400-13 of MaRTH specifications for Road and Bridge works 2013 manufactured in WMM plant material comprising of clean, crushed, graded aggregate and granular material premixed with water to a dense mass, spread, rolled and consolidating to required gradient and camber complete all as specified and directed | 90 | 10 Sqm | 1,100 ₹99,000 | 1,500 ₹1,35,000 | 1,400 ₹1,26,000 | 1,350 ₹1,21,500 | 950 ₹85,500 Lowest |
| 4.00 | M&L for preparing unsurfaced water bound macadam by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 7.50 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 90 | 10 Sqm | 200 ₹18,000 Lowest | 750 ₹67,500 | 200 ₹18,000 Lowest | 480 ₹43,200 | 500 ₹45,000 |
| 5.00 | M&L for preparing unsurfaced Black top surface by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 5 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 513 | 10 Sqm | 200 ₹1,02,600 | 500 ₹2,56,500 | 150 ₹76,950 Lowest | 375 ₹1,92,375 | 350 ₹1,79,550 |
| 6.00 | M & L for premixed bituminous macadam using paving bitumen @ 4% by weight of total mix spread rolled and compacted to required gradient and camber for upto 50 mm consolidated thickness all as specified and directed, | 61 | Cum | 6,200 ₹3,78,200 | 6,500 ₹3,96,500 | 5,000 ₹3,05,000 Lowest | 7,250 ₹4,42,250 | 5,800 ₹3,53,800 |
| 7.00 | M &L for preparing new Bituminous macadam Surface and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 2.5 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 122 | 10 Sqm | 180 ₹21,960 | 200 ₹24,400 | 130 ₹15,860 Lowest | 187 ₹22,814 | 200 ₹24,400 |
| 8.00 | M & L for Bituminous premix semi dense asphaltic concrete 30 mm consolidated thickness with 5.5% binder content by weight of total mix using paving bitumen, rolled and compacted to required camber and gradient complete all as specified and directed. | 603 | 10 Sqm | 3,030 ₹18,27,090 | 3,200 ₹19,29,600 | 2,600 ₹15,67,800 Lowest | 3,001 ₹18,09,603 | 2,650 ₹15,97,950 |
| 9.00 | M & L for moorum filling in berms of road laid in layers spread levelled and rammed including watering and well ramming with power road roller of spread thickness 100 mm complete all as specified and directed by Engr-in-Charge | 80 | 10 Sqm | 600 ₹48,000 | 400 ₹32,000 | 1,000 ₹80,000 | 388 ₹31,040 Lowest | 650 ₹52,000 |
| 10.00 | Demolition of Concrete of any description and in any position not otherwise
specifically provided fo complete all as specified and directed. | 32.55 | Cum | 1,800 ₹58,590 | 500 ₹16,275 | 500 ₹16,275 | 215 ₹6,998.25 | 100 ₹3,255 Lowest |
Tender Value
₹40.3 L
EMD Value
₹80,700
Closing Date
21 Sept 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Shri Vinay Kumar, IDSE, SE (SAG), CWE
HQ Commander Works Engineer (Army) Mumbai, 24 Assaye Building Colaba-05
REPAIR AND RESURFACING OF INTERNAL/APPROACH ROADS IN MD/OTM ACCN AT 126 AD REGT, SIGNAL COMPANY,SN,915 WORKSHOP, ETC UNDER GE DEHU ROAD
2026_MES_786004_1
85338/DR/E8
Open Tender
Civil Works - Roads
Item Rate
90 days
Dehu Road Pune
All as per NIT and tender documents
8 documents required · 8 mandatory
₹500
GE DEHU ROAD PUNE
₹80,700
Yes
18 Oct 2026
24 Aug 2026
23 Sept 2026
24 Aug 2026
21 Sept 2026
7 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Repair to potholes any depth, not exc 1 sqm each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting around edges to at least 25 mm in depth, making good by applying tack coat @ 5 kg per 10 sqm, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sq m, blinded with 0.09 cu m of stone chippings, 6.3 mm size and again well rammed (including supply of premixed macadam, binder and chippings) depth of potholes exc 30 mm all as specified and directed. | 30 | 10 Sqm | - | - |
| 0.0 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm and depth of potholes exc 50mm and n exc 100mm deep complete all as specified and direted. | 90 | 10 Sqm | - | - |
| 0.0 | M & L Laying and compacting 75 mm thick (compacted thickness) Wet Mix Macadam (WMM) grading as pe table 400-13 of MaRTH specifications for Road and Bridge works 2013 manufactured in WMM plant material comprising of clean, crushed, graded aggregate and granular material premixed with water to a dense mass, spread, rolled and consolidating to required gradient and camber complete all as specified and directed | 90 | 10 Sqm | - | - |
| 0.0 | M&L for preparing unsurfaced water bound macadam by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 7.50 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 90 | 10 Sqm | - | - |
| 0.0 | M&L for preparing unsurfaced Black top surface by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 5 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 513 | 10 Sqm | - | - |
| 0.0 | M & L for premixed bituminous macadam using paving bitumen @ 4% by weight of total mix spread rolled and compacted to required gradient and camber for upto 50 mm consolidated thickness all as specified and directed, | 61 | Cum | - | - |
| 0.0 | M &L for preparing new Bituminous macadam Surface and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 2.5 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 122 | 10 Sqm | - | - |
| 0.0 | M & L for Bituminous premix semi dense asphaltic concrete 30 mm consolidated thickness with 5.5% binder content by weight of total mix using paving bitumen, rolled and compacted to required camber and gradient complete all as specified and directed. | 603 | 10 Sqm | - | - |
| 0.0 | M & L for moorum filling in berms of road laid in layers spread levelled and rammed including watering and well ramming with power road roller of spread thickness 100 mm complete all as specified and directed by Engr-in-Charge | 80 | 10 Sqm | - | - |
| 0.0 | Demolition of Concrete of any description and in any position not otherwise
specifically provided fo complete all as specified and directed. | 32.55 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
TenderDocuments85338.pdf
Tender Documents • 0.94 MB
BOQ_880793.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .