Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC LAXMI NAGAR CHHINDWARA ROAD SAONER DIST NAGPUR | SAONER | NAGPUR | MAHARASHTRA | L1 | Accepted-AOC Due to L1 | |
| 2 | L2₹3.2 L+₹8,176 (2.61%)Rejected-Finance H N 52 NA LAXMI NAGAR CHHINDWARA ROAD VILLAGE TOWN SAONER CITY SAONER NAGPUR MAHARASHTRA 441107 INDIA | NAGPUR | MAHARASHTRA | 441107 | L2 | Rejected-Finance Due to L2 | |
| 3 | L3₹3.3 L+₹16,046 (5.12%)Rejected-Finance 7 S T ADITYA DIXIT KORADI ROAD NAGPUR 440030 | NAGPUR | NAGPUR | MAHARASHTRA | 440030 | L3 | Rejected-Finance Due to L3 | |
| 4 | L4₹3.5 L+₹41,480 (13.2%)Rejected-Finance 122 7 WCL SHAKTI NAGAR SAONER ROAD NAGPUR NAGPUR MAHARASHTRA 441107 | NAGPUR | MAHARASHTRA | 441107 | L4 | Rejected-Finance Due to L4 |
Tender Value
₹4.9 L
EMD Value
₹6,200
Closing Date
17 Jan 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
STAFF OFFICER (MINING) NAGPUR AREA
OFFICE OF AREA GENERAL MANAGER NAGPUR AREA
Dismantling of belt and its accessories from 43D 1st belt (43D/-4L to 43R/5L) seam V and (51R/20L to 51D/15 L) seam IV (M) and installation of 2 Nos. belt with accessories at 52D/11LW and 53R/11LW of seam IV (B) at Saoner Mine No.3 (On Labour rate)
2023_WCL_266455_1
Na3250-min-e-tender 044 -2022-23
Open Tender
Civil Works - Others
Item Rate
120 days
Saoner Mine No.3
As per NIT
4 documents required · 4 mandatory
₹6,200
13 Feb 2023
2 Jan 2023
19 Jan 2023
3 Jan 2023
17 Jan 2023
3 Jan 2023
3 Jan 2023 - 10 Jan 2023
Amount
Belt dismantling & transportation from existing site i.e. 43D Ist belt (43D/-4L to 43R/5L) seam V & (51R/20L to 51D/15L) seam IV (M) along with Drums, Gear Box, Base Frame, Starter Motor, ACB switches, power cable etc. structure, Stool, Bracket, Channel, Top roller, Bottom roller, from surface, power cable for 43D/5L seam V or as per instruction of Engineer In charge.
Installation of belt 52D/11LW & 53R/11LW seam IV (B) 100m each, Drive Head, Discharge Drum & Tail End along with Base Preparation, Duggies For Loop Take up, Girder Fixing, Complete Frame Setting etc. or as per instruction of Engineer In charge.
Installation of Belt 52D/11LW & 53R/11LW seam IV(B) 100m each, with Accessories such as structure, stool, Bracket, Channel, Top roller, Bottom roller, Drums, Gear Box, Base Frame, Starter, Motor, ACB switches, power cable etc. as per instruction of Engineer In charge.
Total impact of GST for the purpose of CTC
M/S. NAMDEO KHOJRE CONSTRUCTION
M/s ADITYADIXIT
M/s Sunil Yadav
stage.html
html • 0.04 MB
techsummary_275638.pdf
PDF • 0.28 MB
finsummary_275638.pdf
PDF • 0.73 MB
LOA44.pdf
PDF • 0.49 MB
finance_275638.pdf
PDF • 0.30 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .