| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹2.2 CrRejected-Finance | ₹2.2 Cr | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹2.3 CrRejected-Finance | ₹2.3 Cr | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹2.3 CrRejected-Finance GSTIN: 09AJIPM2707R1ZL | ₹2.3 Cr | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹2.3 CrRejected-Finance GSTIN: 09AAJPD7369J1Z8 | ₹2.3 Cr | L-5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | M/S RAJENDRA SINGH YADAV L4 | BHAMAR SINGH L8 | Shyam Lalit Dubey L5 | M/S BADRI SINGH L6 | DHARAM DEV CHAUHAN L9 | M/S RADHEY MOHAN DUBEY CONSTRUCTION L7 | M/S RAMPYARE SINGH L3 | S.B. ENTERPRISES L2 | M/S LALMANI MAURYA L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in ordinary soil including all lead & lift with proper completion of work. | 7,406.74 | Cum | 50 ₹3.7 L | 80 ₹5.9 L | 70 ₹5.2 L | 50 ₹3.7 L | 80 ₹5.9 L | 60 ₹4.4 L | 45 ₹3.3 L | 86 ₹6.4 L | 40 ₹3.0 L |
| 2.00 | Preparation of sub grade before laying PCC for Toe drain excluding cost of earth work but including cost of labour & T&P etc. for proper completion of work. | 12,223.2 | Sqm | 9 ₹1.1 L | 10 ₹1.2 L | 8 ₹97,785.60 | 10 ₹1.2 L | 10 ₹1.2 L | 8 ₹97,785.60 | 8.5 ₹1.0 L | 8.86 ₹1.1 L | 9 ₹1.1 L |
| 3.00 | Earth work in filling for strenthening of bank with all lead & lift including cost of all material and proper compaction, labour, T&P etc. with proper completion of work | 32,753.11 | Cum | 132 ₹43.2 L | 184 ₹60.3 L | 200 ₹65.5 L | 80 ₹26.2 L | 100 ₹32.8 L | 111.25 ₹36.4 L | 145 ₹47.5 L | 126 ₹41.3 L | 128 ₹41.9 L |
| 4.00 | Shuttering work for Cement concrete including cost of all material, labour,T&P, fixing and removel etc.with proper completion of work. | 2,041.55 | Sqm | 169 ₹3.5 L | 190 ₹3.9 L | 100 ₹2.0 L | 250 ₹5.1 L | 160 ₹3.3 L | 150 ₹3.1 L | 125 ₹2.6 L | 156 ₹3.2 L | 128 ₹2.6 L |
| 5.00 | Laying C.C. 1:3:6 in foundation (with 1 cement :3 Coarse sand FM not less than 2.00 :6 stone ballast size 20 to 40mm) including all cost of material, labour ,T&P etc. with all lead and lift required for proper completion of work. | 1,017.44 | Cum | 3,617 ₹36.8 L | 4,079 ₹41.5 L | 3,000 ₹30.5 L | 4,250 ₹43.2 L | 4,100 ₹41.7 L | 4,300 ₹43.7 L | 3,300 ₹33.6 L | 3,286 ₹33.4 L | 3,350 ₹34.1 L |
| 6.00 | C.R. stone masonry with 1:3 cement coarse sand mortar including cost of all material, labour and T&P etc. including all lead and lift for proper completion of work. | 3,499.16 | Cum | 3,319 ₹1.2 Cr | 3,744 ₹1.3 Cr | 3,200 ₹1.1 Cr | 4,250 ₹1.5 Cr | 4,555.53 ₹1.6 Cr | 4,260.2 ₹1.5 Cr | 3,400 ₹1.2 Cr | 3,426 ₹1.2 Cr | 3,450 ₹1.2 Cr |
| 7.00 | Cement plaster 1:3 on stone masonry including cost of all material, labour, T&P etc. including all lead and lift for proper completion of work. | 7,730.63 | Sqm | 162 ₹12.5 L | 184 ₹14.2 L | 149 ₹11.5 L | 200 ₹15.5 L | 200 ₹15.5 L | 177 ₹13.7 L | 120 ₹9.3 L | 106 ₹8.2 L | 115 ₹8.9 L |
| 8.00 | Providing and Laying 900 mm dia NP-2 class R.C.C. pipe with collar jointed with stiff mixture of 1:2 (1 Cement : 2 fine sand) including testing of joints etc. complete. | 35 | RM | 2,756 ₹96,460 | 3,107 ₹1.1 L | 2,700 ₹94,500 | 4,200 ₹1.5 L | 3,050 ₹1.1 L | 3,122 ₹1.1 L | 3,500 ₹1.2 L | 3,586 ₹1.3 L | 3,600 ₹1.3 L |
| 9.00 | Providing and laying local sand of FM<2 in filling over NP-2 pipe & below stone pitching for preparing subgrade including cost of all materials, labour charges & T&P etc. for proper completion of work. | 12.45 | Cum | 968 ₹12,051.60 | 1,092 ₹13,595.40 | 800 ₹9,960 | 1,200 ₹14,940 | 1,250 ₹15,562.50 | 903 ₹11,242.35 | 900 ₹11,205 | 886 ₹11,030.70 | 950 ₹11,827.50 |
| 10.00 | Laying stone pitching with R.R Stone masonary in 1:4 cement mortor in embankment including cost of all material, labour, T&P binding wire etc. required for proper completion of work. | 18.98 | Cum | 3,491 ₹66,259.18 | 3,937 ₹74,724.26 | 3,700 ₹70,226 | 5,000 ₹94,900 | 3,950 ₹74,971 | 4,100 ₹77,818 | 3,000 ₹56,940 | 3,586 ₹68,062.28 | 2,500 ₹47,450 |
Tender Value
Refer Docs
EMD Value
₹6.3 L
Closing Date
14 Jan 2026, 1:00 pmClosed
Superintending Engineer, B S C C C-1 Mzp
Superintending Engineer, Bansagar Canal Construction Circle-1 Mirzapur
Strengthening of Canal between km. 5.785 to km. 7.435 of Meja Jirgo Link Canal
2026_UPIDC_1103917_1
06/SE/2025-26
Open Tender
Civil Works
240 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹6.3 L
16 Feb 2026
5 Jan 2026
14 Jan 2026
5 Jan 2026
14 Jan 2026
6 Jan 2026
Earth work in excavation in ordinary soil including all lead & lift with proper completion of work.
Preparation of sub grade before laying PCC for Toe drain excluding cost of earth work but including cost of labour & T&P etc. for proper completion of work.
Earth work in filling for strenthening of bank with all lead & lift including cost of all material and proper compaction, labour, T&P etc. with proper completion of work
Shuttering work for Cement concrete including cost of all material, labour,T&P, fixing and removel etc.with proper completion of work.
Laying C.C. 1:3:6 in foundation (with 1 cement :3 Coarse sand FM not less than 2.00 :6 stone ballast size 20 to 40mm) including all cost of material, labour ,T&P etc. with all lead and lift required for proper completion of work.
C.R. stone masonry with 1:3 cement coarse sand mortar including cost of all material, labour and T&P etc. including all lead and lift for proper completion of work.
Cement plaster 1:3 on stone masonry including cost of all material, labour, T&P etc. including all lead and lift for proper completion of work.
Providing and Laying 900 mm dia NP-2 class R.C.C. pipe with collar jointed with stiff mixture of 1:2 (1 Cement : 2 fine sand) including testing of joints etc. complete.
Providing and laying local sand of FM<2 in filling over NP-2 pipe & below stone pitching for preparing subgrade including cost of all materials, labour charges & T&P etc. for proper completion of work.
Laying stone pitching with R.R Stone masonary in 1:4 cement mortor in embankment including cost of all material, labour, T&P binding wire etc. required for proper completion of work.
Laying cement concrete (1:2:4) on coping to restore it, with all material, labour, T&P etc. with proper completion of work.
Providing and filling in position bitumen mix of blown bitumen in expansion joints/ construction joint in daula work including cost of materials, fuel for heating labour, T&P etc. required for proper completion of work.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
Tender_Document.pdf
Tender Documents • 3.36 MB
BOQ_2036223.xls
BOQ • 5.34 MB
Download all tender documents and submit your bid