| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹2.2 Cr+₹2.0 L (0.89%)Rejected-Finance | ₹2.2 Cr+₹2.0 L (0.89%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹2.3 Cr+₹4.4 L (1.99%)Rejected-Finance | ₹2.3 Cr+₹4.4 L (1.99%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹2.3 Cr+₹4.5 L (2.04%)Rejected-Finance | ₹2.3 Cr+₹4.5 L (2.04%) | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹2.3 Cr+₹13.5 L (6.12%)Rejected-Finance | ₹2.3 Cr+₹13.5 L (6.12%) | L-5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | M/S RAJENDRA SINGH YADAV L4 | BHAMAR SINGH L8 | Shyam Lalit Dubey L5 | M/S BADRI SINGH L6 | DHARAM DEV CHAUHAN L9 | M/S RADHEY MOHAN DUBEY CONSTRUCTION L7 | M/S RAMPYARE SINGH L3 | S.B. ENTERPRISES L2 | M/S LALMANI MAURYA L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in ordinary soil including all lead & lift with proper completion of work. | 7,406.74 | Cum | 50 ₹3,70,337 | 80 ₹5,92,539.2 | 70 ₹5,18,471.8 | 50 ₹3,70,337 | 80 ₹5,92,539.2 | 60 ₹4,44,404.4 | 45 ₹3,33,303.3 | 86 ₹6,36,979.64 | 40 ₹2,96,269.6 Lowest |
| 2.00 | Preparation of sub grade before laying PCC for Toe drain excluding cost of earth work but including cost of labour & T&P etc. for proper completion of work. | 12,223.2 | Sqm | 9 ₹1,10,008.8 | 10 ₹1,22,232 | 8 ₹97,785.6 Lowest | 10 ₹1,22,232 | 10 ₹1,22,232 | 8 ₹97,785.6 Lowest | 8.5 ₹1,03,897.2 | 8.86 ₹1,08,297.55 | 9 ₹1,10,008.8 |
| 3.00 | Earth work in filling for strenthening of bank with all lead & lift including cost of all material and proper compaction, labour, T&P etc. with proper completion of work | 32,753.11 | Cum | 132 ₹43,23,410.52 | 184 ₹60,26,572.24 | 200 ₹65,50,622 | 80 ₹26,20,248.8 Lowest | 100 ₹32,75,311 | 111.25 ₹36,43,783.49 | 145 ₹47,49,200.95 | 126 ₹41,26,891.86 | 128 ₹41,92,398.08 |
| 4.00 | Shuttering work for Cement concrete including cost of all material, labour,T&P, fixing and removel etc.with proper completion of work. | 2,041.55 | Sqm | 169 ₹3,45,021.95 | 190 ₹3,87,894.5 | 100 ₹2,04,155 Lowest | 250 ₹5,10,387.5 | 160 ₹3,26,648 | 150 ₹3,06,232.5 | 125 ₹2,55,193.75 | 156 ₹3,18,481.8 | 128 ₹2,61,318.4 |
| 5.00 | Laying C.C. 1:3:6 in foundation (with 1 cement :3 Coarse sand FM not less than 2.00 :6 stone ballast size 20 to 40mm) including all cost of material, labour ,T&P etc. with all lead and lift required for proper completion of work. | 1,017.44 | Cum | 3,617 ₹36,80,080.48 | 4,079 ₹41,50,137.76 | 3,000 ₹30,52,320 Lowest | 4,250 ₹43,24,120 | 4,100 ₹41,71,504 | 4,300 ₹43,74,992 | 3,300 ₹33,57,552 | 3,286 ₹33,43,307.84 | 3,350 ₹34,08,424 |
| 6.00 | C.R. stone masonry with 1:3 cement coarse sand mortar including cost of all material, labour and T&P etc. including all lead and lift for proper completion of work. | 3,499.16 | Cum | 3,319 ₹1,16,13,712.04 | 3,744 ₹1,31,00,855.04 | 3,200 ₹1,11,97,312 Lowest | 4,250 ₹1,48,71,430 | 4,555.53 ₹1,59,40,528.35 | 4,260.2 ₹1,49,07,121.43 | 3,400 ₹1,18,97,144 | 3,426 ₹1,19,88,122.16 | 3,450 ₹1,20,72,102 |
| 7.00 | Cement plaster 1:3 on stone masonry including cost of all material, labour, T&P etc. including all lead and lift for proper completion of work. | 7,730.63 | Sqm | 162 ₹12,52,362.06 | 184 ₹14,22,435.92 | 149 ₹11,51,863.87 | 200 ₹15,46,126 | 200 ₹15,46,126 | 177 ₹13,68,321.51 | 120 ₹9,27,675.6 | 106 ₹8,19,446.78 Lowest | 115 ₹8,89,022.45 |
| 8.00 | Providing and Laying 900 mm dia NP-2 class R.C.C. pipe with collar jointed with stiff mixture of 1:2 (1 Cement : 2 fine sand) including testing of joints etc. complete. | 35 | RM | 2,756 ₹96,460 | 3,107 ₹1,08,745 | 2,700 ₹94,500 Lowest | 4,200 ₹1,47,000 | 3,050 ₹1,06,750 | 3,122 ₹1,09,270 | 3,500 ₹1,22,500 | 3,586 ₹1,25,510 | 3,600 ₹1,26,000 |
| 9.00 | Providing and laying local sand of FM<2 in filling over NP-2 pipe & below stone pitching for preparing subgrade including cost of all materials, labour charges & T&P etc. for proper completion of work. | 12.45 | Cum | 968 ₹12,051.6 | 1,092 ₹13,595.4 | 800 ₹9,960 Lowest | 1,200 ₹14,940 | 1,250 ₹15,562.5 | 903 ₹11,242.35 | 900 ₹11,205 | 886 ₹11,030.7 | 950 ₹11,827.5 |
| 10.00 | Laying stone pitching with R.R Stone masonary in 1:4 cement mortor in embankment including cost of all material, labour, T&P binding wire etc. required for proper completion of work. | 18.98 | Cum | 3,491 ₹66,259.18 | 3,937 ₹74,724.26 | 3,700 ₹70,226 | 5,000 ₹94,900 | 3,950 ₹74,971 | 4,100 ₹77,818 | 3,000 ₹56,940 | 3,586 ₹68,062.28 | 2,500 ₹47,450 Lowest |
Tender Value
Refer Docs
EMD Value
₹6.3 L
Closing Date
14 Jan 2026, 1:00 pmClosed
Superintending Engineer, B S C C C-1 Mzp
Superintending Engineer, Bansagar Canal Construction Circle-1 Mirzapur
Strengthening of Canal between km. 5.785 to km. 7.435 of Meja Jirgo Link Canal
2026_UPIDC_1103917_1
06/SE/2025-26
Open Tender
Civil Works
Item Rate
240 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹6.3 L
16 Feb 2026
5 Jan 2026
14 Jan 2026
5 Jan 2026
14 Jan 2026
6 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in ordinary soil including all lead & lift with proper completion of work. | 7,406.74 | Cum | - | - |
| 2 | Preparation of sub grade before laying PCC for Toe drain excluding cost of earth work but including cost of labour & T&P etc. for proper completion of work. | 12,223.2 | Sqm | - | - |
| 3 | Earth work in filling for strenthening of bank with all lead & lift including cost of all material and proper compaction, labour, T&P etc. with proper completion of work | 32,753.11 | Cum | - | - |
| 4 | Shuttering work for Cement concrete including cost of all material, labour,T&P, fixing and removel etc.with proper completion of work. | 2,041.55 | Sqm | - | - |
| 5 | Laying C.C. 1:3:6 in foundation (with 1 cement :3 Coarse sand FM not less than 2.00 :6 stone ballast size 20 to 40mm) including all cost of material, labour ,T&P etc. with all lead and lift required for proper completion of work. | 1,017.44 | Cum | - | - |
| 6 | C.R. stone masonry with 1:3 cement coarse sand mortar including cost of all material, labour and T&P etc. including all lead and lift for proper completion of work. | 3,499.16 | Cum | - | - |
| 7 | Cement plaster 1:3 on stone masonry including cost of all material, labour, T&P etc. including all lead and lift for proper completion of work. | 7,730.63 | Sqm | - | - |
| 8 | Providing and Laying 900 mm dia NP-2 class R.C.C. pipe with collar jointed with stiff mixture of 1:2 (1 Cement : 2 fine sand) including testing of joints etc. complete. | 35 | RM | - | - |
| 9 | Providing and laying local sand of FM<2 in filling over NP-2 pipe & below stone pitching for preparing subgrade including cost of all materials, labour charges & T&P etc. for proper completion of work. | 12.45 | Cum | - | - |
| 10 | Laying stone pitching with R.R Stone masonary in 1:4 cement mortor in embankment including cost of all material, labour, T&P binding wire etc. required for proper completion of work. | 18.98 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
Tender_Document.pdf
Tender Documents • 3.36 MB
BOQ_2036223.xls
BOQ • 5.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .