Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.0 L
Closing Date
1 Dec 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
xen rew udh
xen rew udh
boq
2021_RDPR_148839_5
eNIT No 204 of REW Udh of 2021-22 Dated 18/11/2021
Open Tender
Civil Works
Item Rate
90 days
udh
nit
2 documents required · 2 mandatory
₹600
Yes
xen rew udh
Exempted
2 Dec 2021
18 Nov 2021
2 Dec 2021
18 Nov 2021
1 Dec 2021
18 Nov 2021
90 days
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 70%All kinds of soil and 30 % ordinary rocks
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 70% All kinds of soil and 30 % ordinary rocks
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) Including all leads, lift and carriage complete.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) Including all leads, lift and carriage complete.
Dumping / filling of stones including cost of stones. In horizontal on level. Including all leads, lift and carriage complete. Including all leads, lift and carriage complete.
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
Polygonal/Random Rubble Masonary dry un coursed brought to course in sub structure including cost of bond/through stones, including all leads, lifts, carriages, handling and re-handling complete.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Dry stone soling laid horizontally . Including all leads, lift and carriage complete.
SUSHIL KUMAR
KULBIR SINGH
M/s BISHAN DASS
Mohd shabir
SOHAN LAL
M/s KULDEEP RAJ
AJAY KUMAR
RAKESH GUPTA
PURAN CHAND
BODH RAJ
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .