Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAccepted-AOC NOT APPLICABLE | FARIDABAD | HARYANA | 121004 | ₹2.6 Cr Quoted ₹2.7 Cr | L1 | Accepted-AOC Lower Rates |
| 2 | L2₹2.9 Cr+₹16.2 L (6.02%)Rejected-Finance HOUSE NO 342 DHURI GATE PADHIAN WALI STREET SANGRUR PUNAJB 148001 | SANGRUR | PUNJAB | 148001 | ₹2.9 Cr+₹16.2 L (6.02%) | L2 | Rejected-Finance Higher Rates |
| Sl No | Description | Qty | Unit | M/s AMAN BUILDERS L1 | AMBEY CONSTRUCTION CO L2 |
|---|---|---|---|---|---|
| 1.00 | Ordinary jungle clearance of both banks of distributaries, minors and drains with discharge upto 9 cum/s including boundary road discharge exceeding 1.5 cum/s but upto 4.5 cum/s. | 2 | km | 2,782 ₹5,564 Lowest | 2,810 ₹5,620 |
| 2.00 | Excavation of soil (any type) using hydraulic excavator and CK 90 excavation with hydraulic excavator of 0.9 cum capacity including cutting trimming bottom and side slopes in accordance with requirement of grades and cross sections, includingall lift and combined lead upto 30 mtr. | 2,581.65 | cum | 38 ₹98,102.7 Lowest | 38 ₹98,102.7 Lowest |
| 3.00 | Excavation of soil using hydraulic exavator and hydraulic tractor trolly including cutting and loading in trolly and transporting to the embankments locations with all lifts and leads , including extra for compensation for ordinary earth/ ordinary clay taken from private land without royalty | 28,971.2 | cum | 353 ₹1,02,26,833.6 Lowest | 410 ₹1,18,78,192 |
| 4.00 | Compaction of earth Extra for laying earth/fly ash as per specificaion in 20cm layers and dressing and including cost of rolling Extra for watering the earth / fly ash laid in 20 cm layers as per specificaion for compation Extra for Rolling to Specificaions | 30,045.55 | cum | 105 ₹31,54,782.75 Lowest | 107 ₹32,14,873.85 |
| 5.00 | Dressing of Earthwork (New work or remodeling work.) | 8,511.76 | sqm | 1 ₹8,511.76 Lowest | 1.4 ₹11,916.46 |
| 6.00 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth | 2,736.95 | cum | 169 ₹4,62,544.55 Lowest | 172 ₹4,70,755.4 |
| 7.00 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above 1.5 mtr depth but upto 3.0 m depth. | 1,234.97 | cum | 178 ₹2,19,824.66 Lowest | 180 ₹2,22,294.6 |
| 8.00 | Earthwork excavation in foundations trenches extra in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 meters depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 meters. | 253.35 | cum | 204 ₹51,683.4 Lowest | 207 ₹52,443.45 |
| 9.00 | Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification. | 13,618.73 | sqm | 19 ₹2,58,755.87 Lowest | 20 ₹2,72,374.6 |
| 10.00 | Dressing bed and preparation of sub grade for lining. | 3,650.97 | sqm | 12 ₹43,811.64 Lowest | 12.5 ₹45,637.13 |
Tender Value
₹2 Cr
EMD Value
₹4 L
Closing Date
20 Feb 2026, 4:30 pmClosed
Executive Engineer Devigarh Patiala Division
Executive Engineer/Devigarh Patiala Canal and Ground Water Division WRD Punjab Patiala Phone No 0175 2353311
Estimate for concrete lining of Ghuram Disty from RD 0-6550 off-taking from RD 157000/R of Narwana Branch
2026_WR_159508_1
44/2025-26
Open Tender
Civil Works
Item Rate
60 days
Patiala
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Yes
₹4 L
Yes
Devigarh Patiala Division
22 May 2026
6 Feb 2026
20 Feb 2026
6 Feb 2026
20 Feb 2026
6 Feb 2026
13 Feb 2026
Ordinary jungle clearance of both banks of distributaries, minors and drains with discharge upto 9 cum/s including boundary road discharge exceeding 1.5 cum/s but upto 4.5 cum/s.
Excavation of soil (any type) using hydraulic excavator and CK 90 excavation with hydraulic excavator of 0.9 cum capacity including cutting trimming bottom and side slopes in accordance with requirement of grades and cross sections, includingall lift and combined lead upto 30 mtr.
Excavation of soil using hydraulic exavator and hydraulic tractor trolly including cutting and loading in trolly and transporting to the embankments locations with all lifts and leads , including extra for compensation for ordinary earth/ ordinary clay taken from private land without royalty
Compaction of earth Extra for laying earth/fly ash as per specificaion in 20cm layers and dressing and including cost of rolling Extra for watering the earth / fly ash laid in 20 cm layers as per specificaion for compation Extra for Rolling to Specificaions
Dressing of Earthwork (New work or remodeling work.)
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above 1.5 mtr depth but upto 3.0 m depth.
Earthwork excavation in foundations trenches extra in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 meters depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 meters.
Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification.
Dressing bed and preparation of sub grade for lining.
Dressing of dowels along water carrying channel in addition to payment for dressed earth work.
Dag Belling single kassi stroke complete in all respect
Putting 1:3 (cement: water) cement slurry with cement @ 2.25 kg/ sqm on prepared bed and side slopes before laying concrete on bed and side slopes
Laying Reinforced Cement concrete lining 150 mm. thick or less laid manually for irrigation channels, using cement concrete M-20 with cement content 335 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) as per design/drawing and PWD specifications (for Side Slope)
Laying Reinforced Cement concrete lining 150 mm. thick or less laid manually for irrigation channels, using cement concrete M-20 with cement content 335 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) as per design/drawing and PWD specifications (for Coping)
Cement concrete lining 10cm. thick or less with mechanical Paver for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km a) Computerized Batching & Mixing plant mixed concrete lining on bed and on slide slopes upto vertical height 2.0m.
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M- 15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) (For Coping)
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M- 15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) (For Sleepers)
Shuttering for faces of Concrete lining on side slopes and bed complete in all respect as per design/drawing and PWD specifications.
Filling of construction/Contraction Joints with sealing compound including supply, carriege of material complete in all respect as per design/ drawing and PWD specifications
Filling expansion joints with special impervious hot pour 12.5 mm wide
Extra bitumen painting at 0.69 per sqm (on sleeper) .
Providing & laying 250 mm wide LDPE Film 150 micron over sleepers
Earth work for dismentalling or construction of new pipe outlet including Excavation, refilling, consolidation and dressing channel discharge upto 1.5 cum
Earth work involved in dismantling Open flume, A.P.M. or O.S.M. type Outlets (including excavation, refilling, consolidation and dressing )
Adjusting new APM Block in correct "y" & fixing in position (in case of new outlet where no dismentling and reconstructing of gollet wall is involved
Laying cement concrete 1:4:8 with gauge 40mm mixing by mechanical means using concrete mixer volumetric type.
First class burnt brick work laid in cement sand mortar 1:4 in foundations & plinth
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth.
Cold twisted detormed (Ribbed/ ToR Steel Bar) Bars (Fe 500 grade as per IS 1786-2005) , for R.C.C works, where not including in the complete rate of RCC including bending and biding placing in position complete
Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering including attached pilasters buttresses etc.
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976 (0.20 ft = 6.1 cm (min wt 65 kg))
Providing and laying, jointing, fixing, testing ISI Marked G.I. Pipe (as per IS 1239) BClass, including cost of Specials such as tees, bends, sockets elbow etc., cutting, threading and testing in trenches in the ground complete 50mm i/d
Providing and laying, jointing, fixing, testing ISI Marked G.I. Pipe (as per IS 1239) BClass, including cost of Specials such as tees, bends, sockets elbow etc., cutting, threading and testing in trenches in the ground complete 65mm i/d
Providing and laying, jointing, fixing, testing ISI Marked G.I. Pipe (as per IS 1239) BClass, including cost of Specials such as tees, bends, sockets elbow etc., cutting, threading and testing in trenches in the ground complete 80mm i/d
Providing, lowering in trenches to correct gradient and alignment, jointing with tyton rubber joint and cutting of reinforced cement concrete spigot and socketed pipes and specials with rubber ring ISI marekd as per IS code IS 458-2003 into trenches for all depths and laying out the same to correct alignment, gradients, levels etc. cutting of concrete beds and joints holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benchings, haunches and envelopes are completed. The pipes shall rest on the beds at all joints through their lengths and fixing of rubber ring, facing, testing the pipes for leakage and making good the same leakage and all defects to the entire satisfaction of the Engineer-in-charge including all cartage etc. upto 100 mm inside diameter
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.60 MB
BOQ_323534.xls
BOQ • 0.25 MB
44Corrigendum4.pdf
PDF • 0.49 MB
44Corrigendum3.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .