Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹147.6 CrAccepted-AOC NAMAKKAL | ₹147.6 Cr Quoted ₹148.7 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹155.9 CrRejected-Finance NO 07 CENTRAL STREET KILPAUK GARDEN COLONY CHENNAI 600010 | CHENNAI | TAMIL NADU | 600010 | ₹155.9 Cr | L2 | Rejected-Finance Rejected |
| 3 | Rejected-Technical NO 30 PERIYAR NAGAR ERODE 638001 | ERODE | TAMIL NADU | 638001 | - | - | Rejected-Technical Rejected |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | EMJAY CONSTRUCTIONS L2 | SRM CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Formation of Bedding Layer for rubble mound Breakwater with quarry run hard blue granite stone of weight upto 10kg having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the side slopes 1 : 2 on both sides with necessary equipment and devices as per the drawings and specification etc complete as directed by the Departmental Officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 58,578 | MT | 1,535 ₹9.0 Cr | 1,500 ₹8.8 Cr |
| 2.00 | Formation of core layer for rubble mound Breakwater with quarry run hard blue granite stone of weight 50Kg- 300Kg having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading, transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the side slopes 1 : 2 on both sides with necessary equipment and devices as per the drawing and specification etc., complete as directed by the Departmental Officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational changes of tools and plants etc. ( The payment shall be made on weight basis (ie) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 2,55,955 | MT | 1,535 ₹39.3 Cr | 1,500 ₹38.4 Cr |
| 3.00 | Formation of Toe Berm Layer for rubble mound Breakwater with hard blue granite stone of weight ranging from 300kg to 500kg having a specific gravity of not less than 2.65 and as nearly cubical as possible as per approved design and drawing. The rate is inclusive of quarrying, loading at quarry using crane and other tools and plants as required, transporting by tippers/ lorries weighing on the electronic weigh bridge for measurement, Unloading/dumping placing in position to required level, profile and finishing the side slopes of 1 : 2 using crane and floating equipment and devices as per the drawing and specification etc., complete and as directed by the Departmental Officers. The rate is inclusive of placing sectioning and finishing with necessary equipments and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 46,051 | MT | 1,600 ₹7.4 Cr | 1,525 ₹7.0 Cr |
| 4.00 | Formation of Armour Layer for rubble mound Breakwater with hard blue granite stone of weight ranging from 1500kg to 4000kg having a specific gravity of not less than 2.65 and as nearly cubical as possible as per approved design and drawing. The rate is inclusive of quarrying, loading at quarry using crane and other tools and plants as required, transporting by tippers/ lorries weighing on the electronic weigh bridge for measurement, Unloading/dumping placing in position to required level, profile and finishing the side slopes of 1 : 2 using crane and floating equipment and devices as per the drawing and specification etc., complete and as directed by the Departmental Officers. The rate is inclusive of placing sectioning and finishing with necessary equipments and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 1,21,840 | MT | 1,770 ₹21.6 Cr | 1,700 ₹20.7 Cr |
| 5.00 | Formation of Under Layer for rubble mound Breakwater with hard blue granite stone of weight ranging from 300kg to 500kg having a specific gravity of not less than 2.65 and as nearly cubical as possible as per approved design and drawing. The rate is inclusive of quarrying, loading at quarry using crane and other tools and plants as required, transporting by tippers/ lorries weighing on the electronic weigh bridge for measurement, Unloading/dumping placing in position to required level, profile and finishing the side slopes of 1 : 2 using crane and floating equipment and devices as per the drawing and specification etc., complete and as directed by the Departmental Officers. The rate is inclusive of placing sectioning and finishing with necessary equipments and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 42,171 | MT | 1,600 ₹6.7 Cr | 1,525 ₹6.4 Cr |
| 6.00 | Providing and laying in position, Standardised Concrete Mix M-30 Grade using In-situ Concrete batching plant/ Ready Mix Concrete (RMC) adopting weigh batch method in accordance with IS:456-2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 400 kg/m3 and maximum water cement ratio of 0.45, including admixture (plasticiser / superplasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 Cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m’) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including Conveyance of concrete from batching plant to Work site, Electricity charges and other works & labour cost involved for concrete production, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials). | 7,953 | Cum | 11,000 ₹8.7 Cr | 10,300 ₹8.2 Cr |
| 7.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 5,890 | Sqm | 859 ₹50.6 L | 800 ₹47.1 L |
| 8.00Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) ,Providing Fusion Bonded Epoxy coating not less than 175microns thickness and upto 300 microns to reinforcement of all diameters as per IS 13620/1993 including testing of coating at plant.The cost is inclusive of cost on account of careful handling, PVC coated binding wires, touchup material supplied by coating agency, repair work, loading, unloading and strengthening of bend rods etc., complete as per specification and as directed by the Engineer in charge. | |||||
| 8.01 | upto plinth/Basement level | 10,686 | Qtl | 12,260 ₹13.1 Cr | 11,500 ₹12.3 Cr |
| 8.02 | above plinth/Basement level | 212.5 | Qtl | 12,510 ₹26.6 L | 11,500 ₹24.4 L |
Tender Value
₹143.0 Cr
EMD Value
₹71.6 L
Closing Date
9 Jul 2025, 5:00 pmClosed
Chief Engineer
Fishing Harbour Project Circle Fisheries and Fishermen Welfare Department Chennai 35
Improvements to the Fish Landing Centre at Kunthukal in Ramanathapuram District.
2025_AHDF_560565_1
3 DB F.114 N 2025 Dated 20.05.2025
Open Tender
Civil Works
730 days
Kuthukal Ramanathapuram
As per Mentioned Below
4 documents required · 4 mandatory
₹0
₹71.6 L
21 Nov 2025
22 May 2025
10 Jul 2025
22 May 2025
9 Jul 2025
22 May 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.44 MB
Tenderdocument.pdf
Tender Documents • 1.19 MB
Tenderdocument_2.pdf
Tender Documents • 0.82 MB
Download all tender documents and submit your bid