Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.4 LAdmitted-Finance | -49.53% | ₹11.4 L | L1 | Admitted-Finance |
| 2 | L2₹11.7 L+₹34,751.55 (3.05%)Admitted-Finance | -47.99% | ₹11.7 L+₹34,751.55 (3.05%) | L2 | Admitted-Finance |
| 3 | L3₹12.1 L+₹66,118.20 (5.81%)Admitted-Finance | -46.60% | ₹12.1 L+₹66,118.20 (5.81%) | L3 | Admitted-Finance |
| 4 | L4₹12.2 L+₹79,251.58 (6.96%)Admitted-Finance | -46.02% | ₹12.2 L+₹79,251.58 (6.96%) | L4 | Admitted-Finance |
| 5 | L5₹12.4 L+₹99,967.11 (8.78%)Admitted-Finance | -45.10% | ₹12.4 L+₹99,967.11 (8.78%) | L5 | Admitted-Finance |
Tender Value
₹22.6 L
EMD Value
₹45,140
Closing Date
20 Jul 2026, 4:00 pmClosed
Executive Engineer Flood Control Division Akhnoor
Executive Engineer Flood Control Division Akhnoor
Construction of Anti Erosion Work at damaged spot at Sitriwala on Right Bank of River Chenab (Part IV)
2026_IFC_315828_1
e-NIT 13 OF 2026-27
Open Tender
Civil Works
Percentage
30 days
Akhnoor
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Engineer Flood Control Division Akhnoor
₹45,140
25 Jul 2026
13 Jul 2026
21 Jul 2026
13 Jul 2026
20 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Tipping stone-filled zinc coated Gabion boxes in position; including equipment
charges. | 718.84 | cum | 312.2 | ₹2,24,421.85 |
| 2 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 1,026.04 | cum | 371.15 | ₹3,80,814.75 |
| 3 | Supply of nallah stones. | 872.13 | cum | 700 | ₹6,10,491 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 73.22 | cum | 218.4 | ₹15,991.25 |
| 5 | Carriage of Nallah Stones at an Av. Distance 10km by MT. | 872.13 | cum | 328.31 | ₹2,86,329 |
| 6 | Earth Average 1 Km by M.T from source to site of work | 73.22 | cum | 160.93 | ₹11,783.29 |
| 7 | K Wire Crates avg. 50 Km by M.T 24 no 60 Kg Each Gabion wire boxes 416 Nos @ 12 kg each and B. A wire 464 Kg | 6.9 | MT | 1,976.05 | ₹13,634.75 |
| 8 | Add cost of 24 No. wire crates | 24 | nos | 4,941 | ₹1,18,584 |
| 9 | Add cost of G. Boxes | 416 | nos | 1,350 | ₹5,61,600 |
| 10 | Add cost of B.A. Wire | 464 | kgs | 71 | ₹32,944 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_1026369.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .