Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.2 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹39.0 L+₹11,404 (0.29%)Rejected-AOC A 8 YAHODUTTA SOCIETY KASBA PETH PUNE 411011 | PUNE | PUNE | MAHARASHTRA | 411011 | L2 | Rejected-AOC Rejected | |
| 3 | L3₹39.9 L+₹1.0 L (2.61%)Rejected-AOC FLAT NO 105 2A SURVEY NO 30 2 MORAYA HEIGHTS DHANKAWADI PUNE 411043 | PUNE | PUNE | MAHARASHTRA | 411043 | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SWAMIRAJ CORPORATION L3 | AV AND COMPANY L2 | RAJMUDRA ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00Description | ||||||
| 2.00 | Item no.01 Removing the existing filter media sand& supporting gravel fromthe filter bed i.e.any lead & lifts i.e. screening thegravelwithapproriate meshsieve&stacking themedia& travel as directed by the Engineer incharge. | 71.28 | Cubic Meter | 620 ₹44,193.6 | 400 ₹28,512 Lowest | 500 ₹35,640 |
| 3.00 | Item no.02 Dismantling the R.C.C. Work 1:2:4 andsortingoutthematerialssuchas steel etc. as directed and stacking themwithin the specified lead as directed etc. complete. | 10 | Cubic Meter | 1,350 ₹13,500 | 1,130 ₹11,300 | 1,000 ₹10,000 Lowest |
| 4.00 | Item no.03 Cleaning & washing of existing v-wire Laterals by using specialized acidic and alkaline chemicals to remove Scale, Sludge and other sedimental partials from lateral surface. including all material chemicals, labour etc. | 273 | Running meter | 765 ₹2,08,845 | 650 ₹1,77,450 Lowest | 1,000 ₹2,73,000 |
| 5.00 | Item No.04 ProvidingV-wireunderdrainsystem withV-wirescreenmadeof SS304 fittedonUPVCbasepipe3.5"dia,V wirescreenhavingscreenslotof350 micronshaving16%openareabase pipeof laterals3"diaUPVCSCH40. Tee for main manifold with air distributionismadeofUPVCfittings, Air clamp withmain header is of UPVC saddle with SS 304 nuts & bolts | 27 | Running meter | 14,950 ₹4,03,650 | 14,750 ₹3,98,250 | 14,000 ₹3,78,000 Lowest |
| 6.00 | Item No.05 Providing and casting in situ C.C. of trap / granite/ quartzite / gneiss metalofapprovedqualityforRCC works as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, formwork, compaction, finishing theformedsurfaceswithC.M.1:3of sufficientminimumthicknesstogive a smooth and even surface wherevernecessaryorroughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, BirlaGold,Manikgad,Rajashree,etc. cementispermitted.)(ExcludingM.S.or Tor reinforcement)
5.1 Slabs / Landings / Vertical Walls / Wai st Slabs / Steps for Staircase
In RCC M-200 | 11 | Cubic Meter | 9,250 ₹1,01,750 | 9,200 ₹1,01,200 | 8,000 ₹88,000 Lowest |
| 7.00 | Item no.06 Drilling holes in existing concrete structureforreinforcementanchoring withthehelpofHILTY-500chemical including locating existing reinforcementwiththehel pofdevice PS-35 including all labour material machinery transportation charges excludingcost of reinforcement. For 12 mm dia | 216 | Number | 255 ₹55,080 | 250 ₹54,000 Lowest | 250 ₹54,000 Lowest |
| 8.00 | Item no.07 Providing and fixing in position steel bar reinforcement of various diameters for RCC piles, caps, footings, foundations, slabs, beams, columns, canopies, staircases, newels, chajjas, lintels, pardies, copings, fins, arches, etc. asperdetaileddesigns,drawings andschedules; includingcutting, bending, hooking the bars, bindingwithwiresortackwelding and supporting as required, etc. complete(includingcostofbinding wire). (Bd-F- 17/306)
7.1 Corrosion Resistant Steel (Fe 500) | 1 | Meteric Tonne | 81,500 ₹81,500 | 80,990 ₹80,990 | 80,000 ₹80,000 Lowest |
| 9.00 | Item No.08 Laying of V- wire under drain systemincluding laying& fixing the laterals inpositionas shown in the drawing.Fixingendcaptooneend& ‘T‘ to the other end of the lateral. Fixing separate air header with coupler over the ‘T‘ of the lateral connectingair nipplebetween ‘T‘ of the lateral and air header with coupler whole assembly arranged as per drawing over the manifold. | 273 | Running meter | 1,400 ₹3,82,200 Lowest | 1,450 ₹3,95,850 | 1,400 ₹3,82,200 Lowest |
| 10.00 | Item no.09 Supply of Filter media fine quality sand from any source having effective size 0.45 to 0.70 and uniformity coefficientwithin the limit of 1.3 to 1.7withinpremises asper IS:8419 Part-I of 1977 including transportation, loading, unloading, stacking and for all leads. | 92 | Cubic Meter | 15,000 ₹13,80,000 | 14,230 ₹13,09,160 | 14,000 ₹12,88,000 Lowest |
Tender Value
₹39.0 L
EMD Value
₹39,000
Closing Date
12 Nov 2025, 5:00 pmClosed
SE E and M Comm Mumbai
MIDC HQ office Udyog sarathi Andheri Mumbai 93
M and R to Shahad Water Works.....Repairs to Filter Bed No.9 along with allied repairing works at Filter House Stage-II, WTP Shahad
2025_MIDC_1234770_1
MIDC/E and M/AMB/37046/50/2025-26
Open Tender
Civil Works
Item Rate
120 days
Shahad
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,030
₹39,000
5 Jan 2026
29 Oct 2025
14 Nov 2025
29 Oct 2025
12 Nov 2025
29 Oct 2025
29 Oct 2025 - 31 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.24 MB
ItemSpecification.pdf
Other Document • 0.04 MB
TenderDocument.pdf
Tender Documents • 0.32 MB
BOQ_2130680.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .