| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr Quoted ₹1.4 Cr | L1 | Accepted-AOC Quoted Lowest Rate |
| 2 | L2₹1.4 Cr+₹3.0 L (2.20%)Rejected-AOC | ₹1.4 Cr+₹3.0 L (2.20%) | L2 | Rejected-AOC Rate Quoted Higher than L1 |
| 3 | L3₹1.4 Cr+₹4.5 L (3.34%)Rejected-AOC | ₹1.4 Cr+₹4.5 L (3.34%) | L3 | Rejected-AOC Rate Quoted Higher than L1 |
| Sl No | Description | Qty | Unit | NIZAMUDHEEN L2 | T. Saravanan L1 | R NAGARAJAN L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 476 | M3 | 375 ₹1,78,500 | 370 ₹1,76,120 Lowest | 380 ₹1,80,880 |
| 2.00 | Cement Concrete 1:5:10 (One Cement, Five M.sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation and flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 24.7 | M3 | 6,080 ₹1,50,176 | 5,900 ₹1,45,730 Lowest | 6,130 ₹1,51,411 |
| 3.00 | Providing laying spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in sub base course on well prepared surface andcompacting with vibratory soil compactor to etc, complete as per clause 406 of MORTH Rev-5 | 42.5 | M3 | 2,310 ₹98,175 | 2,240 ₹95,200 Lowest | 2,330 ₹99,025 |
| 4.00 | Supply and filling in foundation and basement with Conveyed Earth 5 kmmr in layers of not more than 15 cm thick well watered, without consolidation etc. complete complying with standard specification and as directed by the departmental officers. | 130 | M3 | 555 ₹72,150 | 550 ₹71,500 Lowest | 560 ₹72,800 |
| 5.00 | Supplying and filling in foundation, basement, etc with filling Stone Dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 44 | M3 | 590 ₹25,960 | 580 ₹25,520 Lowest | 600 ₹26,400 |
| 6.00 | Pre-Construction anti-termite treatment plinth area – surface treatment
stage-1 :- Completion of earth work for column footings before laying plain cement concrete 25mm dia Hole spaced at 30cm center to center on both direction will be made at the bottom of earth workand the chemical will be poured in the holes and will be sprayed in the four sides of earth work at the rate of 3 litres of chemical solution (Chlorophyrifos emulsion diluted in ration 1:19 (One emulsion and 19 water ) per square metre payment shall be made after completion of 3 stages. stage-II :- After filling the basement before laying flooring concrete with filling Crushed Stone Sand (M-Sand)) 25mm dia holes to adepth of 450mm will be made inside the basement and the chemical will be poured in the holes at the rate of 3 litres of chemical solution (Chlorophyrifos emulsion diluted in ration 1:19 (One emulsion and 19 water ) per square metre payment shall be made after completion of 3 stages. Stage-2: Spraying anti-termite chemical solution to the grade beam level, spraying has to done for the grade beam, brick masonry contact with the back fill earth. Stage-3: Spraying anti-termite chemical solution on the sand for the flooring before laying the flooring concrete. This treatment has to be carried out on the sand filling by making holes with crow bar to a depth of 60 cms and at 60cms intervals on both. Stage-4: Spraying anti-termite chemical solution alround building outside by making holes through bar before laying plinth protection and the holes to be closed after the treatment. | 234.5 | M2 | 135 ₹31,657.5 | 130 ₹30,485 Lowest | 140 ₹32,830 |
| 7.00 | Damp proof course with Cement Mortar 1:4 (One Cement and Four crushed stone sand) 12mm thick mixed with best approved quality water proofing compound conforming to Indian Standard specification as specified by the departmental officers at 2% by weight of cement used, finishing and curing etc. complete complying with standard specification. | 24 | M2 | 305 ₹7,320 | 300 ₹7,200 Lowest | 310 ₹7,440 |
| 8.00 | Supplying and erecting steel Strutting including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | 240 | M2 | 705 ₹1,69,200 | 700 ₹1,68,000 Lowest | 710 ₹1,70,400 |
| 9.00 | Supplying and erecting centering for plane surfaces such as RCC Floor Slab, Roof Slab, Loft, Landing Slabs, etc with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over steel adjustable span of size 2m x 2m (expandable upto 3.60m) and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 501.7 | M2 | 970 ₹4,86,649 | 960 ₹4,81,632 Lowest | 980 ₹4,91,666 |
| 10.00 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 296.1 | M2 | 1,250 ₹3,70,125 | 1,240 ₹3,67,164 Lowest | 1,260 ₹3,73,086 |
Tender Value
₹1.3 Cr
EMD Value
₹77,500
Closing Date
10 Sept 2025, 3:00 pmClosed
Superintending Engineer PWD Buildings Sivagangai
Superintending Engineer PWD Buildings C M Circle Sivagangai 630562
Construction of 5 Classroom building 1 Boys Toilet and 1 Girls Toilet in Government Higher Secondary School at Pambur in Ramantathapuram District
2025_PWD_597597_1
16 SE Buildings C M Circle Sivagangai 2025 2026 dt 19 08 2025 5
Open Tender
Civil Works - Buildings
Lump-sum
210 days
Pambur in Ramantathapuram District
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹77,500
28 Oct 2025
27 Aug 2025
11 Sept 2025
27 Aug 2025
10 Sept 2025
27 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .