Tender Value
₹20.9 Cr
EMD Value
₹10 L
Closing Date
14 Sept 2026, 2:00 pm
Superintending Engineer/W.H.C.1/P.W.(R)D.
Office of the Superintending Engineer, Western Highway Circle No.-I, Purta Bhavan 1st Floor, Burdwan, Purba Bardhaman. 713103.
Link Rd from Arbelia on Kalna-Baidyapur Rd to Dhapaspara via Chagram H.C.(VR) from 0 to 4.60km and Pandua-Kulti Rd(VR) from 0 to 2.60km-W and S Work including Construction of 10nos CD Structures,805mtr Protective work under Burdwan South Hwy Div-RIDF
2026_WBPWD_5019160_1
WBPW(R)D/NIT- 02 of SE/WHC-I/2026-2027
Open Tender
CIVIL WORKS
Percentage
220 days
Burdwan
Please refer Tender documents.
8 documents required · 8 mandatory
₹10 L
Yes
Off of the S.E./W.H.C.1/P.W.(R)D.
18 Aug 2026
18 Aug 2026
16 Sept 2026
18 Aug 2026
14 Sept 2026
25 Aug 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ROAD WORKS : | |||||
| 1.01 | Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials up to a
lead of 1000 metres, stacking serviceable and unserviceable materials
separately (Reference to MoRT&H's specification clause 202)
By Mechanical Means
Bituminous course
Rate is Including 1.0% Cess. | 1,878.1 | m³ | 312.86 | ₹5,87,582.37 |
| 1.02 | Excavation in Soil with Dozer with lead up to 100 metres
Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment up to a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections (Reference to MoRT&H's specification clause 301).
Rate is Including 1.0% Cess. | 3,596.13 | m³ | 166.21 | ₹5,97,712.77 |
| 1.03 | Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits (land own/arranged by the Agency) with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305).
Land owned /Arranged by the Contractor. Carried earth. Lead upto 5km.
Rate is Including 1.0% Cess. | 57,217.43 | m³ | 220.72 | ₹1,26,29,031.15 |
| 1.04 | Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits (earth is available from Govt. land) with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305).
Land owned /Arranged by the Department. Lead upto 5km.
Rate is Including 1.0% Cess. | 38,144.96 | m³ | 168.17 | ₹64,14,837.92 |
| 1.05 | Construction of Embankment with Material Deposited from Roadway Cutting
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2 & 300-1.The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305).
Rate is Including 1.0% Cess. | 745.01 | m³ | 105.59 | ₹78,665.61 |
| 1.06 | Supplying, spreading and compacting Fine Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary.
The compaction factor for dry, clean sand may be taken as 0.835.
Rate is Including 1.0% Cess. | 2,194.43 | m³ | 936.85 | ₹20,55,851.75 |
| 1.07 | Granular Sub-Base with Graded Material (Plant Mix Method)
Construction of granular sub-base byproviding graded material such asnatural sand/crushed gravel/crushedstone/combination depending uponthe required grading spreading inuniform layers with motor grader onprepared surface, mixing byappropriate mechanical mixure (withcontrolled addition of water), and compacting with vibratory roller toachieve at least 98% of the maximumdry density for the materialdetermined as per IS:2720 (Part 8),complete as per clause 401
Grading-V
Rate is Including 1.0% Cess. | 2,999.87 | m³ | 3,461.87 | ₹1,03,85,159.96 |
| 1.08 | Granular Sub-Base with Graded Material (Plant Mix Method)
Construction of granular sub-base byproviding graded material such asnatural sand/crushed gravel/crushedstone/combination depending uponthe required grading spreading inuniform layers with motor grader onprepared surface, mixing byappropriate mechanical mixure (withcontrolled addition of water), and compacting with vibratory roller toachieve at least 98% of the maximumdry density for the materialdetermined as per IS:2720 (Part 8),complete as per clause 401
Grading-III
Rate is Including 1.0% Cess. | 279.7 | m³ | 3,421.92 | ₹9,57,111.02 |
| 1.09 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate conforming to the grading of table 400- 13 revised vide table 2 of IRC : 109 (2015) to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density .The thickness of a single compacted layer shall not be less than 75 mm.(Reference to MoRT&H's specification 406. Using Pakur Variety Stone Aggregates.
Rate is Including 1.0% Cess. | 9,605.37 | m³ | 3,524.64 | ₹3,38,55,471.32 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.89 MB
Tendernotice_2.pdf
PDF • 0.55 MB
BOQ_5090984.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].