Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | ₹3.4 L | L1 | Admitted-Finance |
| 2 | L2₹3.4 LAdmitted-Finance | ₹3.4 L | L2 | Admitted-Finance |
| 3 | L3₹3.5 LAdmitted-Finance | ₹3.5 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K R ENTERPRISE L2 | F.R. ENTERPRISE L1 | N.K. ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Part A : Transportation,and changing of one no. Gear box ,one no. motor and tail end drum of 48D belt conveyor in CM-1 section | ||||||
| 1.01 | Transportation of one no. tail end drum from surface to 49D/1L and unloading with the help of MUV. and transporting manually by pulling 40 mtr. with the help of chain pully block | 1 | WORK | 39,729 ₹39,729 | 38,950 ₹38,950 | 40,523.58 ₹40,523.58 |
| 1.02 | Transporting manually by pulling 70 mtr. with the help of chain pully block | 1 | WORK | 27,387 ₹27,387 | 26,850 ₹26,850 | 27,934.74 ₹27,934.74 |
| 1.03 | Dismantling of damaged tail end drum with clamping the belt | 1 | WORK | 20,247 ₹20,247 | 19,850 ₹19,850 | 20,651.94 ₹20,651.94 |
| 1.04 | Unlapping the belt and installation of new tail end drum | 1 | WORK | 17,207.4 ₹17,207.40 | 16,870 ₹16,870 | 17,551.55 ₹17,551.55 |
| 1.05 | Lapping after new drum installation | 1 | WORK | 16,870.8 ₹16,870.80 | 16,540 ₹16,540 | 17,208.22 ₹17,208.22 |
| 1.06 | Transportation of one no. gear box from surface to 49D/1L with the help of MUV and transporting manually by pulling 40 mtr. with the help of chain pully block | 1 | WORK | 44,523 ₹44,523 | 43,650 ₹43,650 | 45,413.46 ₹45,413.46 |
| 1.07 | Transportation of one no. 200 KW motor from surface to 49D/1L with the help of MUV and transporting manually by pulling 40 mtr. with the help of chain pully block | 1 | WORK | 31,875 ₹31,875 | 31,250 ₹31,250 | 32,512.5 ₹32,512.50 |
| 1.08 | Dismantling of Drive side gear box and removing the same from its base frame and fitting of spare gear box on its base frame with necessary alignment of gear box with motor and drive drum | 1 | WORK | 27,407.4 ₹27,407.40 | 26,870 ₹26,870 | 27,955.55 ₹27,955.55 |
| 1.09 | Dismantling of Drive side motor and removing the same from its base frame and fitting of spare motor on its base frame with necessary alignment of motor with gear box | 1 | WORK | 30,243 ₹30,243 | 29,650 ₹29,650 | 30,847.86 ₹30,847.86 |
Tender Value
₹4.0 L
EMD Value
₹5,000
Closing Date
20 Mar 2026, 11:00 amClosed
Area Engineer EnM
Office of the General manager, Jhanjra Area
Transportation,and changing of one no. Gear box ,one no. motor and tail end drum of 48D belt conveyor in CM-1 section
2026_ECL_356101_1
ECL/GM/JNR/EnM/A2/25-26/137 dated 07.03.2026
Open Tender
Miscellaneous Works
15 days
JHANJRA UG
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
Yes
21 Mar 2026
9 Mar 2026
21 Mar 2026
9 Mar 2026
20 Mar 2026
10 Mar 2026
9 Mar 2026 - 16 Mar 2026
Part A : Transportation,and changing of one no. Gear box ,one no. motor and tail end drum of 48D belt conveyor in CM-1 section
Transportation of one no. tail end drum from surface to 49D/1L and unloading with the help of MUV. and transporting manually by pulling 40 mtr. with the help of chain pully block
Transporting manually by pulling 70 mtr. with the help of chain pully block
Dismantling of damaged tail end drum with clamping the belt
Unlapping the belt and installation of new tail end drum
Lapping after new drum installation
Transportation of one no. gear box from surface to 49D/1L with the help of MUV and transporting manually by pulling 40 mtr. with the help of chain pully block
Transportation of one no. 200 KW motor from surface to 49D/1L with the help of MUV and transporting manually by pulling 40 mtr. with the help of chain pully block
Dismantling of Drive side gear box and removing the same from its base frame and fitting of spare gear box on its base frame with necessary alignment of gear box with motor and drive drum
Dismantling of Drive side motor and removing the same from its base frame and fitting of spare motor on its base frame with necessary alignment of motor with gear box
Transportation of replaced one nos. gear box to surface from drive head to 49D/1L manually by pulling 40 mtr. with the help of chain pully block and then loading gear box on MUV
Transportation of replaced one no. motor to surface from drive head to 49D/1L manually by pulling 40 mtr. with the help of chain pully block and then loading gear box on MUV
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.49 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_368955.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid