| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC | ₹8.5 L Quoted ₹9.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.5 LRejected-AOC 245 1A SATIN SEN SARANI KOLKATA 700054 | KOLKATA | KOLKATA | WEST BENGAL | 700054 | ₹9.5 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SEETHALAKSHMI ENTERPRISES | KRISHNA ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Hiring and fixing Diesel/electric pump for dewatering pump using electric pumps with engine including hire charges for dewatering pumps, operator cost, transporting and placing in position of pumps, including all accessories like delivery hose, suction pipe, dismantling of the same after completion of work with all lead, lift, labour, consumables, T&P, etc., complete. | 4.05 | Days | 8,910 ₹10,513.80 | 9,315 ₹10,991.70 |
| 2.00 | Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in sand, silt or other loose soil wet sand or silt under water light black cotton soil sandy loam and ordinary soil including excavated earth SS-20B. | 109.76 | M3 | 12,073.6 ₹14,246.85 | 14,268.8 ₹16,837.18 |
| 3.00 | Dismantling the existing brick masonry for the required height and disposing the debris 1 Km. away from the site including cost of all labours, lead, lift, etc. complete. | 25.94 | M3 | 9,597.8 ₹11,325.40 | 9,857.2 ₹11,631.50 |
| 4.00 | Refilling with excavated soil other than sand complying with standard specification for filling in foundation and basement with watering and consolidation including cost of labours, lead, lift, etc. complete. | 19.74 | M3 | 927.78 ₹1,094.78 | 987 ₹1,164.66 |
| 5.00 | Providing shuttering for supporting the reinforced cement concrete surfaces rate including cost of all materials, labours, lead, lift, etc. complete. | 319.6 | M2 | 1,66,192 ₹2.0 L | 1,69,388 ₹2.0 L |
| 6.00 | Providing PCC 1:4:8 cement concrete using OP/PP cement with 40mm size machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete. | 19.74 | M3 | 1,12,518 ₹1.3 L | 1,18,440 ₹1.4 L |
| 7.00 | Providing RCC 1:1.5:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete. | 36.66 | M3 | 3,66,600 ₹4.3 L | 4,03,260 ₹4.8 L |
| 8.00 | Supplying & providing Steel reinforcement including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, etc. complete. | 2,382.9 | Kg | 2,21,609.7 ₹2.6 L | 2,26,375.5 ₹2.7 L |
Tender Value
Refer Docs
EMD Value
₹7,600
Closing Date
19 Nov 2025, 2:00 pmClosed
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
Improvement Works to the West side Drain in 595 E Road from JT 4 to JT 13 in ICHS area at TTP
2025_EB_619835_1
CE SE C TTPS 313 2025 26
Open Tender
Civil Works - Others
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,600
Yes
14 May 2026
4 Nov 2025
20 Nov 2025
4 Nov 2025
19 Nov 2025
4 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_741111.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid