MR PRATAP BHANU PATEL(DFLT)
FINANCE
Boiler Valve Repairing & Maintenance Works etc.
194080
13/07/2026
OPEN TENDER
Goods
RATE CONTRACT
3 days
FINANCE
Required Past Technical Experience: AS PER NIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
10 documents required · 10 mandatory
Lauh Purush Sugar Plant, Pandariya(LSPSSKM)
Goods
MR PRATAP BHANU PATEL(DFLT)
OPEN TENDER
RATE CONTRACT
OPEN TO ALL
FINANCE
PURCHASE
LAUH PURUSH SARDAR VALLABH BHAI PATEL SAHAKARI SHAKKAR KHARKHANA MRYADIT,PANDARIYA
365
3
No
18
194080
13 Jul, 2026 12:00:00 PM IST
13 Jul, 2026 12:30:00 PM IST
27 Jun, 2026 8:00:00 PM IST
13/07/2026
Boiler Valve Repairing & Maintenance Works etc.
300000.00 INR
RTGS/NEFT (OFFLINE)
No
2
13 Jul, 2026 12:01:01 PM IST
AS PER NIT
AS PER NIT
AS PER NIT
1000.00 INR
10 documents required · 10 mandatory
₹1,000
₹3 L
13 Jul 2026
27 Jun 2026
13 Jul 2026
27 Jun 2026
13 Jul 2026
Feed station 100% line Size 6" Class - 900 Gate Valve Make - KSB (Only OEM/Experience)
Steam inlet Distributor header Size 10" Class - 1500 Gate Valve Make - KSB (Only OEM/Experience)
9MW line to header Size 8" Class-1500 Gate Valve Make - KSB (Only OEM/Experience)
9MW line to header Size 6" Class-1500 Gate Valve Make - KSB (Only OEM/Experience)
PRDS line to header Size 6" Class- 1500 Gate Valve Make - KSB (Only OEM/Experience)
PRDS Station PRDS line Size 6" Class- 1500 Gate Valve Make - KSB (Only OEM/Experience)
PRDS Station PRDS line Size 4" Class- 1500 Globe Valve Make - KSB (Only OEM/Experience)
Startup Vent Size 6" Class- 1500 Globe Valve Make - KSB (Only OEM/Experience)
MSSV Size 10" Class- 1500 Gate Valve Make - KSB (Only OEM/Experience)
Main Steam line NRV Size 10" Class- 1500 NRV Make - KSB (Only OEM/Experience)
Safety Valve (Boiler) Size 3" Safety Valve Make - SACL (Only OEM/Experience)
9MW Main steam stop valve size 8" Class-1500 Gate Valve Make - KSB (Only OEM/Experience)
9MW Main steam stop valve size 6" Class-1500 Gate Valve Make - KSB (Only OEM/Experience)
Rediator System Steam Turbine 5MW Make - TDPS Alternetor) The Scope shall include complete dismantling, removal of old tubes, supply and fitting of new seamless brass tubes, necessary brazing/welding , leakage testing , cleaning, assembly and commissioning of rediator system. they required material specification are as follws: Material: Admiralty Brass: ASTM B111/B111M Type: Seamless Brass Tubes Outer Diameter (OD): 18 mm Inner Diameter (ID): 16 mm Wall Thickness: 1.0mm Length: 6 Feet (1828.8mm) Quantity: 225 Nos Mechnical Properties: Tensile Strength : Minimum 310MPa Yield Strength: Minimum 105 MPa Elongation: 35% Scope of Job Work: Dismantling of radiator assembly. Removal of damaged/Old radiator tubes. Supply of new seamless brass radiator tubes. Tube fitting, expansion and brazing work. leakage testing and rectification. Cleaning and flushing of radiator. Re-assembly and commissioning. Trail run and satifactory performance checking. The job work shall be carried out safety and completed as per technical standards and department requirements. ( Similer work 5 years experience)
REMAINING LIFE ASSESSMENT (RLA) STUDY FOR 75 TPH/14 MW BOILER PRE-REQUISITES & SITE PREPARATION (WHAT WORK TO EXECUTE) 1. Complete boiler shutdown, isolating all feedlines, steam lines, and electrical connections followed byproper purging 2. Erection of robust, safe structural scaffolding insde the furnace, radiant zones, and around external headers to facilitate full access. 3. Removal of localized thermal insulation cladding over marked spots on headers, main steam pipes, and steam drum areas. 4. Grinding and surface mirror polishing up to 1200 grit level at marked test locations to allow accurate In-Sutu Metallographic Replica and hardness testing. ( Similer work 5 years experience)
Work Order: Complete Overhauling & Maintenance of ESP (Field-1) Plant & Equipment Specifications The maintenance work is specific to the Electrostatic Precipitator (ESP) unit integrated with the following high-pressure boiler system: Parameter Technical Detail: Boiler Capacity 75 TPH (UBL Make), Working Pressure 87 kg/cm², Steam Temperature 515 ± 5°C Fuel Type Bagasse / Coal (Multifuel) Target Field
Complete Overhauling, Maintenance, and Job Work Execution of its existing 35 TPH Sugar Grader/Sizer 01. Equipment Technical Specifications The scope of maintenance service covers the specific machine details extracted from the standard plant technical delivery criteria: Parameter / Component Technical Specification Requirements Equipment Type Six Deck Sugar Grader / Sizer (IC Make) Processing Capacity 35 Tonnes Per Hour (TPH) continuous sugar graduation capacity Deck & Sieve Output 6 Decks; each deck capable of sieving a minimum of 6 tonnes of sugar per hour of any desired commercial Vibration Mechanism Mechanical/Electrical Vibrator Type utilizing Direct Force Exciter and Cardan Shaft Assembly Screen Quality Premium SS-304 stainless steel screens across all six decks Drive Unit Totally Enclosed Fan Cooled (TEFC) Electric Motor Auxiliary Attachments Feed distributor, unique multi-silo delivery chutes with bypass flexibility, 6th deck dry seed belt diversion chutes, powder sugar diversion arrangement to magma mixer/sugar melter, magnetic iron separators per chute, and integrated dust catching setup.
JOB WORK FOR COMPLETE MAINTENANCE OF SULPHUR BURNER Equipment: Sulphur Burner, Capacity: 70 Kg/Hr, Quantity: 01 No., Make: Visva Engineering, Nashik Scope of Work Complete dismantling and inspection of Sulphur Burner. Cleaning of Sulphur Burner body, combustion chamber and burner assembly. Inspection and servicing of burner nozzle, sulphur gun and associated fittings. Checking, cleaning and servicing of sulphur feeding arrangement. Inspection and replacement of worn-out gaskets, nuts, bolts and fasteners wherever required. Repair and maintenance of burner refractory lining, if required. Checking and servicing of air blower connected with the sulphur burner. Inspection and maintenance of burner ignition and combustion system. Checking of all valves, dampers and burner pipelines connected to the burner. Alignment and tightening of all mechanical components. Leak testing of the complete sulphur burner system. Trial run and performance testing after completion of maintenance work. Successful commissioning and handing over of the sulphur burner to factory authorities. Complete housekeeping of work area after completion of job. Contractor's Scope Skilled manpower, supervisor, fitter, welder and helpers. All tools, tackles, welding machine, gas cutting set and consumables required for execution of work. Compliance with all safety regulations and use of PPE. COMPLETION PERIOD:- The complete job work shall be completed within one (01) month from the date of issue of Purchase Order (P.O.) or within the time schedule decided by the Factory Management. GUARANTEE / WARRANTY:- The contractor shall provide a guarantee for one complete crushing/running season or twelve (12) months from the date of successful commissioning, whichever is earlier, for the maintenance work carried out on the Sulphur Burner. During the guarantee period, any defect, malfunction, poor workmanship, or failure arising out of the maintenance work shall be attended to and rectified by the contractor at his own cost without any additional financial liability to the factory. PAYMENT TERMS:- 100% payment shall be released after successful completion of the job, trial run, commissioning, and certification by the concerned department and Factory Management. (Similer Job work Experience)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.02 MB
9002672823338156925_194080_E-Tender No 194080 (Technical) Date- 13-07-2026.doc
NIT • 0.18 MB
2397359647227002859_194080_194080 Date- 13.xlsx
BOQ • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .