| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC NO 5 37 VITTAMPALAYAM EMAPALLI TIRUCHENGODE TALUK NAMAKKAL DISTRICT 637211 | EMAPALLI | NAMAKKAL | TAMIL NADU | 637211 | ₹2.0 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.1 CrRejected-AOC | ₹2.1 Cr | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | RKK CONSTRUCTION L1 | V.RAJENDRAN L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling,clearing away and carefully stacking materials useful for re-use for any thickness of walls of Brick work in cement mortar walls under 3m high,etc complying with standard specifications and as directed by the departmental officers. | 380 | Cu.m | 320 ₹1.2 L | 337 ₹1.3 L |
| 2.00Precast Concrete Block masonry using Autoclaved Cellular Aerated Concrete Block of size 600x200x225mm conforming to IS 2185 (Part 3) : 1984 with Self Curing AAC Joint Mortar for Partition Wall of non load bearing type in accordance with IS 6041:1985 including neat finishing, etc., complete complying with standard specification and as directed by the departmental officers. | |||||
| 2.01 | For Superstructure in Ground Floor | 59 | Cu.m | 7,310 ₹4.3 L | 7,736 ₹4.6 L |
| 2.02 | For Superstructure in First Floor | 125 | Cu.m | 7,600 ₹9.5 L | 8,052 ₹10.1 L |
| 2.03 | For Superstructure in Second Floor | 190 | Cu.m | 7,800 ₹14.8 L | 8,261 ₹15.7 L |
| 3.00 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 2,486 | Sq.m | 300 ₹7.5 L | 317 ₹7.9 L |
| 4.00 | Hire charges for Closing the glazed doors and windows in Strong room using Plywood and strengthening the same with countrywood reeper 2"x1". The entire cost should be borne by the contractor himself and the work should be completed. After the counting is over the same protection should be removed as directed by the departmental officers.(14 days) | 785 | Sq.m | 1,280 ₹10.0 L | 1,337 ₹10.5 L |
| 5.00 | Hire charges for Closing the glazed doors and windows in Strong room using GI sheet and strengthening the same with countrywood reeper 2"x1". The entire cost should be borne by the contractor himself and the work should be completed. After the counting is over the same protection should be removed as directed by the departmental officers.(14 days) | 565 | Sq.m | 880 ₹5.0 L | 928 ₹5.2 L |
| 6.00 | Hire charges for providing weldmesh partition using 7.50cm x 2.50 cm weldmesh (10 gauge) with silver oak scantling of required length and size of vertical and horizontal supports and cross supports using countrywood reeper of size 2" x 1" etc., complete as directed by the departmental officers. (14 days) | 1,785 | Sq.m | 1,540 ₹27.5 L | 1,627 ₹29.0 L |
| 7.00 | Hire charges for Providing Steel Frame Weld Mesh Door of size 0.90m x 1.85m using countrywood reepers frame of size 2"x1" of two vertical of size 1.85m each and two horizontal of 0.90m by the each and intermediate support on the bottom 2Nos of 0.65m layers each and weldmesh of size 3" x 1" (10 gauge x 6 gauge) including cost of nails and labour charges etc., complete.(14 days) | 73.3 | Sq.m | 1,610 ₹1.2 L | 1,696 ₹1.2 L |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
7 Apr 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER, PWD, BUILDINGS CONSTRUCTION AND MAINTENANCE CIRCLE, COIMBATORE
Providing Strong Room Counting Hall Pandal G.I Sheet Pandal Barricading arrangements for Counting Centres for 8 LA Constituencies Tiruppur South,Tiruppur North, Avinashi Palladam, Kangeyam Dharapuram Udumalpet in LRG Govt Arts Clge Campus at Tirupur
2026_PWD_675374_1
89BCMCBE24032026(4)
Open Tender
Civil Works - Buildings
Tiruppur
Please refer Tender Documents
7 documents required · 7 mandatory
₹0
₹1.1 L
11 Apr 2026
30 Mar 2026
7 Apr 2026
30 Mar 2026
7 Apr 2026
30 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Dismantling,clearing away and carefully stacking materials useful for re-use for any thickness of walls of Brick work in cement mortar walls under 3m high,etc complying with standard specifications and as directed by the departmental officers. | - | Cu.m | - | - | item Code 01 | |
Precast Concrete Block masonry using Autoclaved Cellular Aerated Concrete Block of size 600x200x225mm conforming to IS 2185 (Part 3) : 1984 with Self Curing AAC Joint Mortar for Partition Wall of non load bearing type in accordance with IS 6041:1985 including neat finishing, etc., complete complying with standard specification and as directed by the departmental officers. | - | - | - | - | item Code 02 | |
For Superstructure in Ground Floor | - | Cu.m | - | - | item Code 03 | |
For Superstructure in First Floor | - | Cu.m | - | - | item Code 04 | |
For Superstructure in Second Floor | - | Cu.m | - | - | item Code 05 | |
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | - | Sq.m | - | - | item Code 06 | |
Hire charges for Closing the glazed doors and windows in Strong room using Plywood and strengthening the same with countrywood reeper 2"x1". The entire cost should be borne by the contractor himself and the work should be completed. After the counting is over the same protection should be removed as directed by the departmental officers.(14 days) | - | Sq.m | - | - | item Code 07 | |
Hire charges for Closing the glazed doors and windows in Strong room using GI sheet and strengthening the same with countrywood reeper 2"x1". The entire cost should be borne by the contractor himself and the work should be completed. After the counting is over the same protection should be removed as directed by the departmental officers.(14 days) | - | Sq.m | - | - | item Code 08 | |
Hire charges for providing weldmesh partition using 7.50cm x 2.50 cm weldmesh (10 gauge) with silver oak scantling of required length and size of vertical and horizontal supports and cross supports using countrywood reeper of size 2" x 1" etc., complete as directed by the departmental officers. (14 days) | - | Sq.m | - | - | item Code 09 | |
Hire charges for Providing Steel Frame Weld Mesh Door of size 0.90m x 1.85m using countrywood reepers frame of size 2"x1" of two vertical of size 1.85m each and two horizontal of 0.90m by the each and intermediate support on the bottom 2Nos of 0.65m layers each and weldmesh of size 3" x 1" (10 gauge x 6 gauge) including cost of nails and labour charges etc., complete.(14 days) | - | Sq.m | - | - | item Code 10 |
stage.html
html • 0.04 MB
techsummary_811732.pdf
finsummary_811732.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
GenConditionElectionCivilTpr.pdf
Tender Documents • 0.66 MB
BOQ_811732.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid