| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.2 LAccepted-AOC 111 M C GARDEN ROAD KOL 30 | KOLKATA | WEST BENGAL | ₹79.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹79.5 LRejected-Finance VILL KHOTTADIHI P O KHOTTADIHI P S PANDAVESWAR DIST PASCHIM BARDHAMAN 713378 | KHOTTADIHI | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | ₹79.5 L | L2 | Rejected-Finance As mentioned in TCR |
| 3 | L3₹79.7 LRejected-Finance DVC PARA PANDAVESWAR PASCHIM BARDHAMAN WEST BENGAL 713346 | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹79.7 L | L3 | Rejected-Finance As mentioned in TCR |
Tender Value
₹72.6 L
EMD Value
₹90,900
Closing Date
9 Apr 2026, 6:00 pmClosed
Area Engineer Civil
GM Office, Sonepur Bazari Area
Construction of drain, storeroom, watch tower, approach road etc. at new railway siding under SB Area.
2026_ECL_357309_1
GM/SBA/CE/e-Tender/25-26/45 Dated 21-03-2026
Open Tender
Civil Works - Others
60 days
Sonepur Bazari Area
As per NIT and GTC
5 documents required · 5 mandatory
₹90,900
22 May 2026
23 Mar 2026
10 Apr 2026
23 Mar 2026
9 Apr 2026
24 Mar 2026
23 Mar 2026 - 2 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1(A) Construction of 2 Nos. Watch Tower | ||||||
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kind of soil | - | cum | - | - | BI01010001010000000000000515BI0100001119 | |
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | cum | - | - | BI01010001010000000000000515BI0100001120 | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (1:2:4) | - | cum | - | - | BI01010001010000000000000515BI0100001121 | |
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size de rived from natural sources) | 1 | cum | - | - | BI01010001010000000000000515BI0100001122 | |
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - | BI01010001010000000000000515BI0100001123 | |
Reinforced cement concrete work in beams, suspended foors, roofs having slope up to 15* landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to foor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - | BI01010001010000000000000515BI0100001124 | |
Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete. | 1 | sqm | - | - | BI01010001010000000000000515BI0100001125 | |
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 1 | sqm | - | - | BI01010001010000000000000515BI0100001126 | |
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 1 | sqm | - | - | BI01010001010000000000000515BI0100001127 | |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.86 MB
BOQ_370177.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid