Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.3 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹36.7 L+₹1.4 L (4.03%)Rejected-Finance 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | L2 | Rejected-Finance L2 | |
| 3 | L3₹36.9 L+₹1.6 L (4.57%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹38.6 L+₹3.3 L (9.37%)Rejected-Finance N A | FARIDABAD | HARYANA | 121004 | L4 | Rejected-Finance L4 | |
| 5 | L5₹40.1 L+₹4.8 L (13.6%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S MOHD. IDRIS CONTRACTOR L3 | DALMENDRA SINGH L1 | SHEESHPAL SINGH CONTRACTOR L4 | VIJAY ASSOCIATES L5 | M/s Ajay Kumar Contractor L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material as per direction of Engineer-in-charge. | 24.11 | Cum | 500 ₹12,055 | 300 ₹7,233 Lowest | 400 ₹9,644 | 518 ₹12,488.98 | 450 ₹10,849.5 |
| 2.00 | Dismantling R.C.C Including stacking of dismantled materials with in 60 Meter. Distance | 14.74 | Cum | 600 ₹8,844 | 300 ₹4,422 Lowest | 490 ₹7,222.6 | 633 ₹9,330.42 | 450 ₹6,633 |
| 3.00 | Earth work in foundation in all type of soil i/c all lift & lead and i/c back filling ,watering & ramming of exavated earth in to tranch or in to the space between the structure & the side of foundation tranches or in to the plinth with removal & disposal or surplus earth as dircted by Engg.-in-Charge. | 266.22 | Cum | 80 ₹21,297.6 | 50 ₹13,311 Lowest | 80 ₹21,297.6 | 100 ₹26,622 | 90 ₹23,959.8 |
| 4.00 | Providing and laying Cement Concrete (A-20 M15) (1:2:4) including all cost of materials, labour and T&P etc complete. | 40.72 | Cum | 5,000 ₹2,03,600 Lowest | 5,200 ₹2,11,744 | 5,300 ₹2,15,816 | 5,900 ₹2,40,248 | 6,300 ₹2,56,536 |
| 5.00 | Providing and laying Reinforcement Cement Concrete (A-20 M20) (1:1.5:3) including all cost of materials, labour and T&P etc complete. | 64.48 | Cum | 6,000 ₹3,86,880 Lowest | 6,200 ₹3,99,776 | 6,300 ₹4,06,224 | 6,800 ₹4,38,464 | 7,200 ₹4,64,256 |
| 6.00 | Providing and laying Reinforcement Cement Concrete (A-20 M25) (1:1:2) including all cost of materials, labour and T&P etc complete. | 168.42 | Cum | 7,000 ₹11,78,940 | 6,300 ₹10,61,046 | 7,145 ₹12,03,360.9 | 7,500 ₹12,63,150 | 6,200 ₹10,44,204 Lowest |
| 7.00 | Shuttering for Reinforcement Cement Concrete. work - For Bridge Slabs up to 3M span. | 80.79 | Sqm | 500 ₹40,395 | 550 ₹44,434.5 | 720 ₹58,168.8 | 860 ₹69,479.4 | 300 ₹24,237 Lowest |
| 8.00 | Shuttering for Reinforcement Cement Concrete. work - T-beam bridge, syphon,aqueduct & box culvert above 3M span | 436.99 | Sqm | 786 ₹3,43,474.14 | 750 ₹3,27,742.5 | 980 ₹4,28,250.2 | 900 ₹3,93,291 | 300 ₹1,31,097 Lowest |
| 9.00 | Supplying and laying TMT Steel bar (Of SAIL/TATA TISCON MAKE.) Reinforcement (Fe-550D) including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work. | 14.54 | M.T. | 73,786 ₹10,72,848.44 | 72,000 ₹10,46,880 | 63,400 ₹9,21,836 Lowest | 70,000 ₹10,17,800 | 1,07,000 ₹15,55,780 |
| 10.00 | S/F 110 mm dia P.V.C. Pipe Spout including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge. | 12.7 | R.M. | 250 ₹3,175 | 180 ₹2,286 | 235 ₹2,984.5 | 280 ₹3,556 | 90 ₹1,143 Lowest |
Tender Value
₹45.4 L
EMD Value
₹91,000
Closing Date
19 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE 1st IWC Meerut
Office of SE 1st IWC Meerut
As per the NIT
2026_UPIDC_1185387_1
13/SE-1/2026-27
Open Tender
Civil Works
Piece-work
90 days
Meerut
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹91,000
Office of SE 1st IWC Meerut
28 Sept 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
15 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material as per direction of Engineer-in-charge. | 24.11 | Cum | - | - |
| 2 | Dismantling R.C.C Including stacking of dismantled materials with in 60 Meter. Distance | 14.74 | Cum | - | - |
| 3 | Earth work in foundation in all type of soil i/c all lift & lead and i/c back filling ,watering & ramming of exavated earth in to tranch or in to the space between the structure & the side of foundation tranches or in to the plinth with removal & disposal or surplus earth as dircted by Engg.-in-Charge. | 266.22 | Cum | - | - |
| 4 | Providing and laying Cement Concrete (A-20 M15) (1:2:4) including all cost of materials, labour and T&P etc complete. | 40.72 | Cum | - | - |
| 5 | Providing and laying Reinforcement Cement Concrete (A-20 M20) (1:1.5:3) including all cost of materials, labour and T&P etc complete. | 64.48 | Cum | - | - |
| 6 | Providing and laying Reinforcement Cement Concrete (A-20 M25) (1:1:2) including all cost of materials, labour and T&P etc complete. | 168.42 | Cum | - | - |
| 7 | Shuttering for Reinforcement Cement Concrete. work - For Bridge Slabs up to 3M span. | 80.79 | Sqm | - | - |
| 8 | Shuttering for Reinforcement Cement Concrete. work - T-beam bridge, syphon,aqueduct & box culvert above 3M span | 436.99 | Sqm | - | - |
| 9 | Supplying and laying TMT Steel bar (Of SAIL/TATA TISCON MAKE.) Reinforcement (Fe-550D) including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work. | 14.54 | M.T. | - | - |
| 10 | S/F 110 mm dia P.V.C. Pipe Spout including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge. | 12.7 | R.M. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.59 MB
BOQ_2230709.xls
BOQ • 0.24 MB
TDUpload.pdf
Tender Documents • 6.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .