Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAccepted-AOC | ₹5.4 Cr | L1 | Accepted-AOC A |
| 2 | L2₹5.5 Cr+₹7.9 L (1.45%)Rejected-Finance PROP PODDAR SONS GURUDWARA COMPLEX SEVOKE ROAD SEVOKE ROAD SILIGURI WEST BENGAL 734001 | JALPAIGURI | WEST BENGAL | 734001 | ₹5.5 Cr+₹7.9 L (1.45%) | L2 | Rejected-Finance R |
| 3 | Rejected-Technical WARD NO 04 TIWARAN TOLA DUDDHI DUDDHI SONBHADRA UTTAR PRADESH 231208 | SONBHADRA | UTTAR PRADESH | 231208 | - | - | Rejected-Technical Rejected by Member Committee |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected by Member Committee |
Tender Value
₹5.5 Cr
EMD Value
₹11 L
Closing Date
9 Mar 2024, 12:00 pmClosed
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
AR OF BANSI ITWA BELWA MARG (SH-159) KE KM 15 TO 27 29 AND 31
2024_CEUBZ_905780_1
623/4E-NIVIDA-BASTI CIRCLE/24 DATED-05-02-2024
Open Tender
Civil Works
Item Rate
240 days
BASTI
AS PER SBD
2 documents required · 2 mandatory
₹2,714
Yes
₹11 L
23 Mar 2024
27 Feb 2024
9 Mar 2024
27 Feb 2024
9 Mar 2024
27 Feb 2024
27 Feb 2024 - 4 Mar 2024
Amount
Providing and applying tack coat with VG-10 bitumen using bitumen pressure distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (including cost of bitumen) (The rate are excluding G.S.T. which will be paid extra as applicable)
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. (including cost of bitumen) (The rate are excluding G.S.T. which will be paid extra as applicable)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. (The rate are excluding G.S.T. which will be paid extra as applicable)
IInd Year @ 1.50%
IIIrd Year @ 3.00%
IVth Year @ 4.50%
Vth Year @ 6.00%
M/s Poddar and Sons
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .