| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 CrAccepted-AOC 246 OKHLA INDUSTRIAL ESTATE PHASE III NEW DELHI 110020 INDIA | SOUTH | DELHI | 110020 | ₹15.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹15.2 CrRejected-AOC 376 377 UDYOG VIHAR PHASE 4 GURGAON HARYANA 122015 | GURUGRAM | HARYANA | 122015 | ₹15.2 Cr | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
Closing Date
3 Oct 2022, 3:00 pmClosed
DGM CONTRACTS
IOCL R AND D CENTRE SECTOR-13 FARIDABAD
Up-Gradation of Common Utilities at VTFE Dept. of IOCL R AND D Centre ,Faridabad
2022_RND_154729_1
RDCCNT2224
Open Tender
Lump Sum TurnKey
450 days
FARIDABAD
Please refer Tender documents.
6 documents required · 6 mandatory
Exempted
IOCL R AND D CENTRE
31 Oct 2023
6 Aug 2022
4 Oct 2022
6 Aug 2022
3 Oct 2022
18 Aug 2022
16 Aug 2022
Amount
FORM SP-01: Supply of material includes all material required as per technical specifications and scope of work. It includes material required for relocation & stand-by arrangement of running the utilities and material required for up-grading the utilities.
FORM SP-02: Relocation of existing utilities and Stand-by arrangement of running utilities with skilled manpower (2 no’s). It includes following: • Dismantling of existing utility items and shifting to make-shift place. • Stand-by arrangement to run the existing test benches. • Charges for skilled manpower (2 no’s 1-B Tech and 1-Diploma for maximum 1 year period).
FORM SP-03: Design & Engineering includes following: • Submission of all plans, P&ID, datasheets for equipments, BOQ, bar chart, shop drawings, detailed equipment layout, structural drawings, electrical and mechanical control system, instrumentation, GAD for piping isometrics etc. • Handing over of final as-built drawings/ documents/ manuals, obtaining and satisfying all statutory licenses, clearances, consents, no objections, approvals and complying with all statutory formalities. Providing necessary training for operation and maintenance of all equipments.
FORM SP-04: Installation and commissioning includes following: • Fabrication, erection, alignment, grouting and all other required works. • Mechanical completion • Testing, commissioning & acceptance of up-graded utilities.
FORM SP-05: Operation & maintenance of common utilities include operation, maintenance, warranty, spares, manpower etc. for 03 years after commissioning of upgraded utilities.
Bidder Name
Amount in Words
HORIBA India Pvt Ltd
AVL INDIA PVT LTD
HORIBA India Pvt Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid