Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Rejected-Technical | Rejected-Technical has not submitted originalcertified copies of documents as mentioned in NIT in the Division office as per EE Cuttack as well as his registration Certificate not submitted Undertaking as per NIT not submitted and MSME is not as per tender nature of w |
| 2 | Rejected-Technical | Rejected-Technical has not submitted original certified copies of documents as mentioned in NIT in the Division office as per EE Cuttack as well as MSME is not as per tender nature of work and not satisfying experience criteria as per NIT |
Tender Value
₹39.2 L
EMD Value
₹78,330
Closing Date
13 Jul 2026, 3:00 pmClosed
Nodal Officer (Tender)
3rd floor DSB Unit 9 BBSR 22
Revamping and retrofitting work to the damaged structure of TAX Building (Telephone Bhawan), Bajrakabati Road, Cuttack.(4th call)
2026_BSNL_278918_1
09/CE(C)/2026-27/BCD/Cuttack
Open Tender
Civil Works
Item Rate
180 days
TB Cuttack
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
Accounts Officer (Cash) BSNL O/oPGMTD Cuttack
₹78,330
Yes
23 Jul 2026
27 May 2026
14 Jul 2026
27 May 2026
13 Jul 2026
27 May 2026
27 May 2026 - 13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sub-Head : Earth Work | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | - | - | - |
| 1.02 | All kinds of soil. | - | One Cubic Metre | - | - |
| 2Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete. (Measurements to be taken of the face area timbered) : | |||||
| 2.01 | Depth exceeding 1.5 m but not exceeding 3 m. | - | One Square Metre | - | - |
| 3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | |||||
| 4Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. | |||||
| 4.01 | All kinds of soil. | - | One Cubic Metre | - | - |
| 5Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | |||||
| 6Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | |||||
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
Tender09.pdf
Tender Documents • 1.83 MB
BOQ_325592.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .