Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹1.8 L+₹62,500 (55.6%)Qualified RZF 772 12 STREET NO13 RAJ NAGAR PART 2 PALAM COLONY SOUTH DELHI DELHI 110017 | SOUTH DELHI | DELHI | 110017 | L2 | Qualified | |
| 2 | L1₹1.1 LDisqualified KHATA NO 2529 2531 121 FEET ROAD DHARAM COLONY PALAM VIHAR EXTN GAUSALA ROAD PALAM VIHAR EXTENSION GURUGRAM GURGAON HARYANA 122017 UDYAM HR 05 0125256 | GURUGRAM | HARYANA | 122017 | L1 | Disqualified | |
| 3 | L3₹1.8 L+₹65,000 (57.8%)Disqualified 2377 1 NIRALA NAGAR SULTANPUR UTTAR PRADESH 228001 | SULTANPUR | UTTAR PRADESH | 228001 | L3 | Disqualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
16 Sept 2025, 5:00 pmClosed
Aadhaar Enabled Biometric Attendance System (AEBAS) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 5
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6590081 Dated : 26-08-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 39 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : General Manager Advanced Centre for Energetic Materials
Ambe Hill
Opp. B M Patil Petrol Pump
Ozar
Nashik
422207. (The General Manager
Acem
Nasik) Splitting 2/7
8244792
GEM/2025/B/6590081
Single Packet Bid
Aadhaar Enabled Biometric Attendance System (AEBAS) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
30 days
NASHIK RURAL
Total value wise evaluation
PRODUCT
1 document required · 1 mandatory
Exempted
26 Aug 2025
26 Aug 2025
16 Sept 2025
Aadhaar Enabled Biometric Attendance System (AEBAS) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 5
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6590081 Dated : 26-08-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 39 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : General Manager Advanced Centre for Energetic Materials
Opp. B M Patil Petrol Pump
422207. (The General Manager
Nasik) Splitting 2/7
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8244792.pdf
GEM_BID
SpecMerge_bbe26f62-f89e-4735-b9e51755687716397_ajay_yadav07.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .