| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr Quoted ₹1.7 Cr | L1 | Accepted-AOC Quoted lowest amount |
| 2 | L2₹1.8 Cr+₹10.2 L (6.02%)Rejected-AOC | ₹1.8 Cr+₹10.2 L (6.02%) | L2 | Rejected-AOC Not quoted lowest amount |
| 3 | L3₹2.3 Cr+₹55.8 L (33.0%)Rejected-AOC | ₹2.3 Cr+₹55.8 L (33.0%) | L3 | Rejected-AOC Not quoted lowest amount |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non-complying of BQR |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non-complying of BQR |
Tender Value
₹5.9 Cr
EMD Value
₹14.7 L
Closing Date
2 Feb 2023, 11:00 amClosed
The Superintending Engineer-MP and ORs
Electricity Department, No.137, Nethaji Subash Chandra Bose Salai, Puducherry - 605 001
Repairing and Supply of Spares for 150 Nos. (Approx) of 22KV and 47 Nos. (Approx) of 11KV sick Distribution Transformers of various capacities in Electricity Department, Puducherry for a period of one year from the date of award of contract
2023_EDCC_11802_1
e. No.13/ED/EE-SPM and Bldgs./2022-2023
Open Tender
Electrical Works
Works
365 days
Head office, Electricity Department
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,770
The Executive Engineer-SPM and Buildings, PED
₹14.7 L
Yes
31 Jul 2023
20 Jan 2023
2 Feb 2023
20 Jan 2023
2 Feb 2023
20 Jan 2023
20 Jan 2023 - 2 Feb 2023
HV Coil SE Copper / Kg for 22KV / 100 KVA
Add: Wastage 5% on HV copper coil
H.T. Bushings Insulator (I.S. 3347 ) for 22KV / 100 KVA
L.T. Bushings Insulator(I.S. 3347) for 22KV / 100 KVA
H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 22KV / 100 KVA
L.T. Rod copper with Metal parts Brass each (IS. 3347) for 22KV / 100 KVA
Breather for 22KV / 100 KVA
Wheel valve of size 1 ¼”each (superior quality) for 22KV / 100 KVA
New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 22KV / 100 KVA
C.R.G.O Lamination for 22KV / 100 KVA
Radiator Fins for 22KV / 100 KVA
Inter coil Insulation per limb for 22KV / 100 KVA
Re-insulation of L.V. Coils for 22KV / 100 KVA
Oil Resistance Paint for inner side of Tanks per Transformer for 22KV / 100 KVA
Gray Paint for outer side of Distribution Transformer for 22KV / 100 KVA
Gasket for tank cover / Transformer for 22KV / 100 KVA
Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 22KV / 100 KVA
Opening, lifting the core and re-Examination: Per Transformer for 22KV / 100 KVA
Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 22KV / 100 KVA
Electrical connections: Star Connection for 22KV / 100 KVA
Electrical connections : Delta Connection for 22KV / 100 KVA
Cleaning tank, tubes, conservator tank etc., internal surface and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 22KV / 100 KVA
Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 22KV / 100 KVA
Charges for hot oil circulation after filling for 22KV / 100 KVA
Drying out of the repaired core after assembling the coils for 22KV / 100 KVA
Welding per cm for 22KV / 100 KVA
Total amount for repairing of 1 No. of 22KV, 100KVA sick Distribution Transformer
Total amount for repairing of 14 Nos. of 22KV, 100KVA sick Distribution Transformer (A)
HV Coil SE Copper / Kg for 22KV / 200 KVA
Add: Wastage 5% on HV copper coil
H.T. Bushings Insulator (I.S. 3347 ) for 22KV / 200 KVA
L.T. Bushings Insulator(I.S. 3347) for 22KV / 200 KVA
H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 22KV / 200 KVA
L.T. Rod copper with Metal parts Brass each (IS. 3347) for 22KV / 200 KVA
Breather for 22KV / 200 KVA
Wheel valve of size 1 ¼”each (superior quality) for 22KV / 200 KVA
New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 22KV / 200 KVA
C.R.G.O Lamination for 22KV / 200 KVA
Radiator Fins for 22KV / 200 KVA
Inter coil Insulation per limb for 22KV / 200 KVA
Re-insulation of L.V. Coils for 22KV / 200 KVA
Oil Resistance Paint for inner side of Tanks per Transformer for 22KV / 200 KVA
Gray Paint for outer side of Distribution Transformer for 22KV / 200 KVA
Gasket for tank cover / Transformer for 22KV / 200 KVA
Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 22KV / 200 KVA
Opening, lifting the core and re-Examination: Per Transformer for 22KV / 200 KVA
Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 22KV / 200 KVA
Electrical connections: Star Connection for 22KV / 200 KVA
Electrical connections : Delta Connection for 22KV / 200 KVA
Cleaning tank, tubes, conservator tank etc., internal surface and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 22KV / 200 KVA
Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 22KV / 200 KVA
Charges for hot oil circulation after filling for 22KV / 200 KVA
Drying out of the repaired core after assembling the coils for 22KV / 200 KVA
Welding per cm for 22KV / 200 KVA
Total amount for repairing of 1 No. of 22KV, 200KVA sick Distribution Transformer
Total amount for repairing of 77 Nos. of 22KV, 200KVA sick Distribution Transformer (B)
HV Coil SE Copper / Kg for 22KV / 315 KVA
Add: Wastage 5% on HV copper coil
H.T. Bushings Insulator (I.S. 3347 ) for 22KV / 315 KVA
L.T. Bushings Insulator(I.S. 3347) for 22KV / 315 KVA
H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 22KV / 315 KVA
L.T. Rod copper with Metal parts Brass each (IS. 3347) for 22KV / 315 KVA
Breather for 22KV / 315 KVA
Wheel valve of size 1 ¼”each (superior quality) for 22KV / 315 KVA
New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 22KV / 315 KVA
C.R.G.O Lamination for 22KV / 315 KVA
Radiator Fins for 22KV / 315 KVA
Inter coil Insulation per limb for 22KV / 315 KVA
Re-insulation of L.V. Coils for 22KV / 315 KVA
Oil Resistance Paint for inner side of Tanks per Transformer for 22KV / 315 KVA
Gray Paint for outer side of Distribution Transformer for 22KV / 315 KVA
Gasket for tank cover / Transformer for 22KV / 315 KVA
Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 22KV / 315 KVA
Opening, lifting the core and re-Examination: Per Transformer for 22KV / 315 KVA
Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 22KV / 315 KVA
Electrical connections: Star Connection for 22KV / 315 KVA
Electrical connections : Delta Connection for 22KV / 315 KVA
Cleaning tank, tubes, conservator tank etc., internal surface and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 22KV / 315 KVA
Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 22KV / 315 KVA
Charges for hot oil circulation after filling for 22KV / 315 KVA
Drying out of the repaired core after assembling the coils for 22KV / 315 KVA
Welding per cm for 22KV / 315 KVA
Total amount for repairing of 1 No. of 22KV, 315KVA sick Distribution Transformer
Total amount for repairing of 54 Nos. of 22KV, 315KVA sick Distribution Transformer (C)
HV Coil SE Copper / Kg for 22KV / 500 KVA
Add: Wastage 5% on HV copper coil
H.T. Bushings Insulator (I.S. 3347 ) for 22KV / 500 KVA
L.T. Bushings Insulator(I.S. 3347) for 22KV / 500 KVA
H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 22KV / 500 KVA
L.T. Rod copper with Metal parts Brass each (IS. 3347) for 22KV / 500 KVA
Breather for 22KV / 500 KVA
Wheel valve of size 1 ¼”each (superior quality) for 22KV / 500 KVA
New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 22KV / 500 KVA
C.R.G.O Lamination for 22KV / 500 KVA
Radiator Fins for 22KV / 500 KVA
Inter coil Insulation per limb for 22KV / 500 KVA
Re-insulation of L.V. Coils for 22KV / 500 KVA
Oil Resistance Paint for inner side of Tanks per Transformer for 22KV / 500 KVA
Gray Paint for outer side of Distribution Transformer for 22KV / 500 KVA
Gasket for tank cover / Transformer for 22KV / 500 KVA
Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 22KV / 500 KVA
Opening, lifting the core and re-Examination: Per Transformer for 22KV / 500 KVA
Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 22KV / 500 KVA
Electrical connections: Star Connection for 22KV / 500 KVA
Electrical connections : Delta Connection for 22KV / 500 KVA
Cleaning tank, tubes, conservator tank etc., internal surface and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 22KV / 500 KVA
Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 500 KVA
Charges for hot oil circulation after filling for 22KV / 500 KVA
Drying out of the repaired core after assembling the coils for 22KV / 500 KVA
Welding per cm for 22KV / 500 KVA
Total amount for repairing of 1 No. of 22KV, 500KVA sick Distribution Transformer
Total amount for repairing of 5 Nos. of 22KV, 500KVA sick Distribution Transformer (D)
Total amount for repairing 150 Nos. (Approx) of 22 KV sick Distribution Transformers (A+B+C+D)
HV Coil SE Copper / Kg for 11KV /100 KVA
Add: Wastage 5% on HV copper coil
H.T. Bushings Insulator (I.S. 3347 ) for 11KV /100 KVA
L.T. Bushings Insulator(I.S. 3347) for 11KV / 100 KVA
H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 11KV / 100 KVA
L.T. Rod copper with Metal parts Brass each (IS. 3347) for 11KV /100 KVA
Breather for 11KV /100 KVA
Wheel valve of size 1 ¼”each (superior quality) for 11KV /100 KVA
New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 11KV /100 KVA
C.R.G.O Lamination for 11KV /100 KVA
Radiator Fins for 11KV /100 KVA
Inter coil Insulation per limb for 11KV /100 KVA
Re-insulation of L.V. Coils for 11KV /100 KVA
Oil Resistance Paint for inner side of Tanks per Transformer for 11KV /100 KVA
Gray Paint for outer side of Distribution Transformer for 11KV /100 KVA
Gasket for tank cover / Transformer for 11KV /100 KVA
Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 11KV /100 KVA
Opening, lifting the core and re-Examination: Per Transformer for 11KV /100 KVA
Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 11KV /100 KVA
Electrical connections: Star Connection for 11KV /100 KVA
Electrical connections : Delta Connection for 11KV /100 KVA
Cleaning tank, tubes, conservator tank etc., internal surface and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 11KV /100 KVA
Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 11KV / 100 KVA
Charges for hot oil circulation after filling for 11KV /100 KVA
Drying out of the repaired core after assembling the coils for 11KV /100 KVA
Welding per cm for 11KV /100 KVA
Total amount for repairing of 1 No. of 11KV, 100KVA sick Distribution Transformer
Total amount for repairing of 10 Nos. of 11KV, 100KVA sick Distribution Transformer (E)
HV Coil SE Copper / Kg for 11KV /200 KVA
Add: Wastage 5% on HV copper coil
H.T. Bushings Insulator (I.S. 3347 ) for 11KV / 200 KVA
L.T. Bushings Insulator(I.S. 3347) for 11KV /200 KVA
H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 11KV /200 KVA
L.T. Rod copper with Metal parts Brass each (IS. 3347) for 11KV /200 KVA
Breather for 11KV /200 KVA
Wheel valve of size 1 ¼”each (superior quality) for 11KV /200 KVA
New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 11KV / 200 KVA
C.R.G.O Lamination for 11KV /200 KVA
Radiator Fins for 11KV /200 KVA
Inter coil Insulation per limb for 11KV /200 KVA
Re-insulation of L.V. Coils for 11KV /200 KVA
Oil Resistance Paint for inner side of Tanks per Transformer for 11KV /200 KVA
Gray Paint for outer side of Distribution Transformer for 11KV /200 KVA
Gasket for tank cover / Transformer for 11KV / 200 KVA
Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 11KV /200 KVA
Opening, lifting the core and re-Examination: Per Transformer for 11KV /200 KVA
Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 11KV /200 KVA
Electrical connections: Star Connection for 11KV /200 KVA
Electrical connections : Delta Connection for 11KV /200 KVA
Cleaning tank, tubes, conservator tank etc., internal surface and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 11KV /200 KVA
Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 11KV /200 KVA
Charges for hot oil circulation after filling for 11KV /200 KVA
Drying out of the repaired core after assembling the coils for 11KV /200 KVA
Welding per cm for 11KV /200 KVA
Total amount for repairing of 1 No. of 11KV, 200KVA sick Distribution Transformer
Total amount for repairing of 24 Nos. of 11KV, 200KVA sick Distribution Transformer (F)
HV Coil SE Copper / Kg for 11KV / 315 KVA
Add: Wastage 5% on HV copper coil
H.T. Bushings Insulator (I.S. 3347 ) for 11KV /315 KVA
L.T. Bushings Insulator(I.S. 3347) for 11KV /315 KVA
H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 11KV / 315 KVA
L.T. Rod copper with Metal parts Brass each (IS. 3347) for 11KV / 315 KVA
Breather for 11KV / 315 KVA
Wheel valve of size 1 ¼”each (superior quality) for 11KV / 315 KVA
New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 11KV / 315 KVA
C.R.G.O Lamination for 11KV / 315 KVA
Radiator Fins for 11KV / 315 KVA
Inter coil Insulation per limb for 11KV / 315 KVA
Re-insulation of L.V. Coils for 11KV /315 KVA
Oil Resistance Paint for inner side of Tanks per Transformer for 11KV / 315 KVA
Gray Paint for outer side of Distribution Transformer for 11KV / 315 KVA
Gasket for tank cover / Transformer for 11KV /315 KVA
Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 11KV / 315 KVA
Opening, lifting the core and re-Examination: Per Transformer for 11KV / 315 KVA
Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 11KV / 315 KVA
Electrical connections: Star Connection for 11KV / 315 KVA
Electrical connections : Delta Connection for 11KV /315 KVA
Cleaning tank, tubes, conservator tank etc., internal surface and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 11KV / 315 KVA
Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 315 KVA
Charges for hot oil circulation after filling for 11KV / 315 KVA
Drying out of the repaired core after assembling the coils for 11KV / 315 KVA
Welding per cm for 11KV / 315 KVA
Total amount for repairing of 1 No. of 11KV, 315KVA sick Distribution Transformer
Total amount for repairing of 8 Nos. of 11KV, 315KVA sick Distribution Transformer (G)
HV Coil SE Copper / Kg for 11KV / 630 KVA
Add: Wastage 5% on HV copper coil
H.T. Bushings Insulator (I.S. 3347 ) for 11KV / 630 KVA
L.T. Bushings Insulator(I.S. 3347) for 11KV / 630 KVA
H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 11KV / 630 KVA
L.T. Rod copper with Metal parts Brass each (IS. 3347) for 11KV / 630 KVA
Breather for 11KV /630 KVA
Wheel valve of size 1 ¼”each (superior quality) for 11KV /630 KVA
New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 11KV /630 KVA
C.R.G.O Lamination for 11KV /630 KVA
Radiator Fins for 11KV / 630 KVA
Inter coil Insulation per limb for 11KV /630 KVA
Re-insulation of L.V. Coils for 11KV / 630 KVA
Oil Resistance Paint for inner side of Tanks per Transformer for 11KV / 630 KVA
Gray Paint for outer side of Distribution Transformer for 11KV / 630 KVA
Gasket for tank cover / Transformer for 11KV / 630 KVA
Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 11KV / 630 KVA
Opening, lifting the core and re-Examination: Per Transformer for 11KV / 630 KVA
Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 11KV / 630 KVA
Electrical connections: Star Connection for 11KV / 630 KVA
Electrical connections : Delta Connection for 11KV / 630 KVA
Cleaning tank, tubes, conservator tank etc., internal surface and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 11KV / 630 KVA
Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 11KV / 630 KVA
Charges for hot oil circulation after filling for 11KV / 630 KVA
Drying out of the repaired core after assembling the coils for 11KV / 630 KVA
Welding per cm for 11KV / 630 KVA
Total amount for repairing of 1 No. of 11KV, 630KVA sick Distribution Transformer
Total amount for repairing of 5 Nos. of 11KV, 630 KVA sick Distribution Transformer (H)
Total amount for repairing 47 Nos. (Approx) of 11 KV sick Distribution Transformers (E+F+G+H)
Unit Rate Total
SAKTHI TRANSFORMERS
AUROTECH TRANSFORMERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .