| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.9 LAccepted-AOC NEW HOSPITAL ROAD UDHAMPUR UDHAMPUR UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L1 | Accepted-AOC AOC to lowest bid of M/s Mahajan Trading Co | |
| 2 | L2₹30.1 L+₹2.2 L (7.88%)Rejected-Finance | L2 | Rejected-Finance Being other than lowest bid | |
| 3 | L3₹35.4 L+₹7.5 L (26.7%)Rejected-Finance | L3 | Rejected-Finance Being other than lowest bid |
| Sl No | Description | Qty | Unit | s l sharma and sons L3 | sohtra and co L2 | MAHAJAN TRADING CO L1 |
|---|---|---|---|---|---|---|
| 1.00 | Cleaning of blocked Manhole n.exc 1.5 mtr deep and removing all silt, residue sludge both organic and inorganic nature including any type of foreign material and removing waste material/sludge etc to a distance n.exc 50 mtr including digging , burrying in ground Complete all as specified.and as directed,
Note :-(i) Work shall be done in foul conditions , necessary precautionary measures/equipments to be adopted by the contractor .
(ii) The solid or semi solid sludge shall be burried in pits and fully covered with a layer of lime powder and earth.
(iii) Rates quoted by the contractor shall be deemed to have considered all such contingencies including removal and refixing man hole covers.
(iv) Any damage caused during cleaning shall be made good by the contractor to the entire satisfaction of Engr-in-Charge without any extra cost to Govt. | 1,100 | Each | 25 ₹27,500 | 19 ₹20,900 Lowest | 40 ₹44,000 |
| 2.00 | All as per item No 01 here in before, but depth of man hole exc 1.5 mtr but n.exc 3.00 mtr completed all as specified and directed.. | 48 | Each | 50 ₹2,400 Lowest | 115 ₹5,520 | 70 ₹3,360 |
| 3.00 | All as per item No 01 here in before, but depth of man hole exc 3.0 mtr but n.exc 6.00 mtr completed all as specified and directed. | 36 | Each | 100 ₹3,600 Lowest | 150 ₹5,400 | 100 ₹3,600 Lowest |
| 4.00 | All as per item No 01 here in before, but gully traps completed all as specified and directed. | 1,207 | Each | 25 ₹30,175 | 28 ₹33,796 | 15 ₹18,105 Lowest |
| 5.00 | Cleaning of all blockage in sewage line of 100 mm dia of sewer line (i.e branch sewer line, main sewer line, etc) in any depth and in any situation by way of cleaning/desludging foreign materials as well as blockage of sewage line in between sucessive manholes by manually or mechanically and removing sludge etc to a distance n.exc 50 mtr including digging , burrying in ground and ensuring high standred of heigine and sanitation complete along with necessary cleaning alongwith rods,pumps Bamboos if necessary,chemicals as required and all other required tools all as specified Complete all as specified.and as directed,
Note :-(i) Work shall be done in foul conditions , necessary precautionary measures/equipments to be adopted by the contractor .(ii) The solid or semi solid sludge shall be burried in pits and fully covered with a layer of lime powder and earth. (iii) Rates quoted by the contractor shall be deemed to have considered all such contingencies including removal and refixing man hole covers. (iv) Any damage caused during cleaning shall be made good by the contractor to the entire satisfaction of Engr-in-Charge without any extra cost to Govt. | 544 | RM | 25 ₹13,600 | 25 ₹13,600 | 15 ₹8,160 Lowest |
| 6.00 | All as per item No 05 here in before, but 150 mm dia of sewage line. | 2,000 | RM | 25 ₹50,000 | 15 ₹30,000 Lowest | 20 ₹40,000 |
| 7.00 | All as per item No 05 here in before, but 200 mm dia of sewage line. | 603 | RM | 25 ₹15,075 Lowest | 40 ₹24,120 | 25 ₹15,075 Lowest |
| 8.00 | Cleaning and desludging of existing septic tanks/Soakage wells of any capacity ( 10 users to 500 users ) including inlet and outlet chambers, taking out sludge in any form alongwith all other foreign materials by mechanical equipment or by way of other suitable means , and removing waste material/sludge etc to a distance n.exc 50 mtr including digging , burrying in ground Complete all as specified.and as directed,
Note :-(i) Work shall be done in foul conditions , necessary precautionary measures/equipments to be adopted by the contractor .(ii) The solid or semi solid sludge shall be burried in pits and fully covered with a layer of lime powder and earth. (iii) Rates quoted by the contractor shall be deemed to have considered all such contingencies including removal and refixing man hole covers. (iv) Any damage caused during cleaning shall be made good by the contractor to the entire satisfaction of Engr-in-Charge without any extra cost to Govt. | 713 | Cum | 200 ₹1,42,600 | 50 ₹35,650 Lowest | 150 ₹1,06,950 |
| 9.00 | Dewatering of existing septic tanks of any capacity (10 users to 500 user) including inlet and outlet chambers and soakage well,, taking out sewage water by mechanical pump and equipment, filling in closed tank atached with tractore or truck etc and removing the same out side from population area, complete all as specified.and as directed,
Note :-(i) Work shall be done in foul conditions , necessary precautionary measures/equipments to be adopted by the contractor .
(ii) Mesurement of item shall be taken as effected measurement of septic tank which is occupied by the volume of water.
(iii) Rates quoted by the contractor shall be deemed to have considered all such contingencies including removal and refixing man hole covers.
(iv) Any damage caused during cleaning shall be made good by the contractor to the entire satisfaction of Engr-in-Charge without any extra cost to Govt. | 1,207 | Cum | 200 ₹2,41,400 | 50 ₹60,350 Lowest | 150 ₹1,81,050 |
| 10.00 | Systematically Cleaning of blockage of WC Indian, Orrisa pattern or European type and bathroom/ kitchen including cleaning of Nahani traps/gully traps/floor by removing of all the mud/sludge and getting out including cleaning of SGSW or CI pipe upto Ist manhole and depositng the sludge in a pit of suitable size at a distance not exceeding 50 metres from the gully trap and covering the same with the soil obtained from excavation of of pit including all excavations and earth work complete and ensuring high standred of heigine and sanitation complete along with necessary cleaning alongwith rods,pumps Bamboos if necessary,chemicals as required and all other required tools all as specified and day to day directed by Engineer-in-charge. The quoted rate includes for keeping particular BLOCK under taken once for cleaning, functional for full contract period.)
Note :-(i) The contractor should provide 04 people (02 sewage cleaning people & 02 helpers) and his authorised representative shall collect the complaints of all blockage from complaint cell/Engr-in-charge daily and all complaints will be rectified by the contractor with in same day and returne the complaint slip after completion of complaint and get receipt from concerned JE/Engr-in-charge. If he fails to complete the work with in same day then recovery will be made @ Rs 300.00 per complaint per day.
(ii) Work shall be done in foul conditions , necessary precautionary measures/equipments to be adopted by the contractor .
(iii) Any damage caused during cleaning shall be made good by the contractor to the entire satisfaction of Engr-in-Charge without any extra cost to Govt. | 2,000 | EACH JOB | 25 ₹50,000 | 20 ₹40,000 Lowest | 25 ₹50,000 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
30 Apr 2026, 6:00 pmClosed
GE (North) Udhampur
GE (North) Udhampur c/o 56 APO PIN-901220
REPAIRS / MAINT OF SEWAGE LINE MANHOLE, SEPTIC TANK, FOOTPATH AND DRAIN OF 874 AT BN, ASHOK VIHAR AND ADJOINING AREA UNDER GE (NORTH) UDHAMPUR
2026_MES_759711_1
GE/U(N)-16/2026-27
Open Tender
Civil Works
Item Rate
180 days
AOR of GE (North) Udhampur
As per NIT
6 documents required · 6 mandatory
₹500
GE (North) Udhampur
₹80,000
Yes
17 Jun 2026
10 Apr 2026
4 May 2026
10 Apr 2026
30 Apr 2026
24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Cleaning of blocked Manhole n.exc 1.5 mtr deep and removing all silt, residue sludge both organic and inorganic nature including any type of foreign material and removing waste material/sludge etc to a distance n.exc 50 mtr including digging , burrying in ground Complete all as specified.and as directed,
Note :-(i) Work shall be done in foul conditions , necessary precautionary measures/equipments to be adopted by the contractor .
(ii) The solid or semi solid sludge shall be burried in pits and fully covered with a layer of lime powder and earth.
(iii) Rates quoted by the contractor shall be deemed to have considered all such contingencies including removal and refixing man hole covers.
(iv) Any damage caused during cleaning shall be made good by the contractor to the entire satisfaction of Engr-in-Charge without any extra cost to Govt. | - | Each | - | - |
| - | All as per item No 01 here in before, but depth of man hole exc 1.5 mtr but n.exc 3.00 mtr completed all as specified and directed.. | - | Each | - | - |
| - | All as per item No 01 here in before, but depth of man hole exc 3.0 mtr but n.exc 6.00 mtr completed all as specified and directed. | - | Each | - | - |
| - | All as per item No 01 here in before, but gully traps completed all as specified and directed. | - | Each | - | - |
| - | Cleaning of all blockage in sewage line of 100 mm dia of sewer line (i.e branch sewer line, main sewer line, etc) in any depth and in any situation by way of cleaning/desludging foreign materials as well as blockage of sewage line in between sucessive manholes by manually or mechanically and removing sludge etc to a distance n.exc 50 mtr including digging , burrying in ground and ensuring high standred of heigine and sanitation complete along with necessary cleaning alongwith rods,pumps Bamboos if necessary,chemicals as required and all other required tools all as specified Complete all as specified.and as directed,
Note :-(i) Work shall be done in foul conditions , necessary precautionary measures/equipments to be adopted by the contractor .(ii) The solid or semi solid sludge shall be burried in pits and fully covered with a layer of lime powder and earth. (iii) Rates quoted by the contractor shall be deemed to have considered all such contingencies including removal and refixing man hole covers. (iv) Any damage caused during cleaning shall be made good by the contractor to the entire satisfaction of Engr-in-Charge without any extra cost to Govt. | - | RM | - | - |
| - | All as per item No 05 here in before, but 150 mm dia of sewage line. | - | RM | - | - |
| - | All as per item No 05 here in before, but 200 mm dia of sewage line. | - | RM | - | - |
| - | Cleaning and desludging of existing septic tanks/Soakage wells of any capacity ( 10 users to 500 users ) including inlet and outlet chambers, taking out sludge in any form alongwith all other foreign materials by mechanical equipment or by way of other suitable means , and removing waste material/sludge etc to a distance n.exc 50 mtr including digging , burrying in ground Complete all as specified.and as directed,
Note :-(i) Work shall be done in foul conditions , necessary precautionary measures/equipments to be adopted by the contractor .(ii) The solid or semi solid sludge shall be burried in pits and fully covered with a layer of lime powder and earth. (iii) Rates quoted by the contractor shall be deemed to have considered all such contingencies including removal and refixing man hole covers. (iv) Any damage caused during cleaning shall be made good by the contractor to the entire satisfaction of Engr-in-Charge without any extra cost to Govt. | - | Cum | - | - |
| - | Dewatering of existing septic tanks of any capacity (10 users to 500 user) including inlet and outlet chambers and soakage well,, taking out sewage water by mechanical pump and equipment, filling in closed tank atached with tractore or truck etc and removing the same out side from population area, complete all as specified.and as directed,
Note :-(i) Work shall be done in foul conditions , necessary precautionary measures/equipments to be adopted by the contractor .
(ii) Mesurement of item shall be taken as effected measurement of septic tank which is occupied by the volume of water.
(iii) Rates quoted by the contractor shall be deemed to have considered all such contingencies including removal and refixing man hole covers.
(iv) Any damage caused during cleaning shall be made good by the contractor to the entire satisfaction of Engr-in-Charge without any extra cost to Govt. | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_850932.xls
BOQ • 1.59 MB
Tender16.pdf
Tender Documents • 1.05 MB
Amendment.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .