| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC NIL NEAR BPCL PETROL PUMP MAKARPURA MANEJA VADODARA GUJARAT 390014 | VADODARA | GUJARAT | 390014 | ₹1.1 Cr Quoted ₹1.5 Cr | L1 | Accepted-AOC awarded |
| 2 | L2₹1.6 Cr+₹15.9 L (11.0%)Rejected-AOC | ₹1.6 Cr+₹15.9 L (11.0%) | L2 | Rejected-AOC Not awarded |
| 3 | Rejected-Technical RITHANI DELHI ROAD RITHANI MEERUT UTTAR PRADESH 250103 | MEERUT | UTTAR PRADESH | 250103 | - | - | Rejected-Technical Rejected techno commercially. |
Tender Value
Refer Docs
Closing Date
23 Apr 2019, 3:00 pmClosed
Mandar G Karambelkar
Praj Industries Limited Praj Tower 274 and 275 Bhumkar Chowk-Hinjewadi Road Hinjewadi Pune-411057
Outdoor type oil immersed transformer
2019_REFHQ_93808_1
Outdoor type Oil immersed Transformer
Limited
Electrical - Motors and other equipments
Supply
150 days
PANIPAT
As per RFQ
6 documents required · 6 mandatory
Exempted
Praj Tower Pune
17 May 2022
15 Mar 2019
24 Apr 2019
15 Mar 2019
23 Apr 2019
9 Apr 2019
26 Mar 2019
Supply of outdoor type oil immersed transformers. Design, engineering, manufacturing, assembly, painting, inspection and testing , packing, preparation for shipments of transformers complete with all accessories, forwarding & supply at site, supply of mandatory & commissioning spares, tools & tackles, mechanical and performance guarantee of the transformers as per the requirements specified in the MR specifications (S-17047-4-EMR3501) and other related documents in the tender/bid. Each transformers shall be supplied complete with 1st filling of oil plus 10% spare oil in non returnable drums, Touch-up paint of same shade (2 Ltr. for each Transformer) all fittings and accessories as detailed in this specification. This cost should include bidder/vendor TPIA charges.
Tag no. - TR-3 2 MVA, 6.6/0.433 kV, Dyn11, Z=6.25% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-5 2 MVA, 6.6/0.433 kV, Dyn11, Z=6.25% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-6 2 MVA, 6.6/0.433 kV, Dyn11, Z=6.25% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-8 2 MVA, 6.6/0.433 kV, Dyn11, Z=6.25% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-4 1.6 MVA, 6.6/0.433 kV, Dyn11, Z=6.25% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-11 1.25 MVA, 6.6/0.433 kV, Dyn11, Z=5% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-25 2.5 MVA, 6.6/0.433 kV, Dyn11, Z=8% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Charges for site supervision of erection, testing and commisioning of any item mentioned in 1.01 to 1.07 above (These charges are other than site supervison charges that included in item no. 1.01 to 1.07 )
Overtime rate/ hour beyond normal 8 hours work on normal working days.
Overtime rate/hour for work on weekly off days/ holidays (as applicable at Project site).
Description of Work / Item(s)
Supply of outdoor type oil immersed transformers. Design, engineering, manufacturing, assembly, painting, inspection and testing , packing, preparation for shipments of transformers complete with all accessories, forwarding & supply at site, supply of mandatory & commissioning spares, tools & tackles, mechanical and performance guarantee of the transformers as per the requirements specified in the MR specifications (S-17047-4-EMR3501) and other related documents in the tender/bid. Each transformers shall be supplied complete with 1st filling of oil plus 10% spare oil in non returnable drums, Touch-up paint of same shade (2 Ltr. for each Transformer) all fittings and accessories as detailed in this specification. This cost should include bidder/vendor TPIA charges.
Tag no. - TR-3 2 MVA, 6.6/0.433 kV, Dyn11, Z=6.25% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-5 2 MVA, 6.6/0.433 kV, Dyn11, Z=6.25% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-6 2 MVA, 6.6/0.433 kV, Dyn11, Z=6.25% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-8 2 MVA, 6.6/0.433 kV, Dyn11, Z=6.25% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-4 1.6 MVA, 6.6/0.433 kV, Dyn11, Z=6.25% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-11 1.25 MVA, 6.6/0.433 kV, Dyn11, Z=5% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-25 2.5 MVA, 6.6/0.433 kV, Dyn11, Z=8% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Charges for site supervision of erection, testing and commisioning of any item mentioned in 1.0 to 1.07 above (These charges are other than site supervison charges that included in item no. 1.0 to 1.07 )
Overtime rate/ hour beyond normal 8 hours work on normal working days.
Overtime rate/hour for work on weekly off days/ holidays (as applicable at Project site).
Description of Work / Item(s)
Spares
Description of Work / Item(s)
Spares
Description of Work / Item(s)
Cost Component
Direct Material Cost
Direct Labour Cost
Factory Overhead
HAMMOND POWER SOLUTIONS PVT LTD
VOLTAMP TRANSFORMERS LIMITED
VOLTAMP TRANSFORMERS LIMITED
VOLTAMP TRANSFORMERS LIMITED
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Portion of Quoted Rate in Currency
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Portion of Quoted Rate in Currency
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Description of Work / Item(s)
Tag no. - TR-3 2 MVA, 6.6/0.433 kV, Dyn11, Z=6.25% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-5 2 MVA, 6.6/0.433 kV, Dyn11, Z=6.25% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-6 2 MVA, 6.6/0.433 kV, Dyn11, Z=6.25% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-8 2 MVA, 6.6/0.433 kV, Dyn11, Z=6.25% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-4 1.6 MVA, 6.6/0.433 kV, Dyn11, Z=6.25% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-11 1.25 MVA, 6.6/0.433 kV, Dyn11, Z=5% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Tag no. - TR-25 2.5 MVA, 6.6/0.433 kV, Dyn11, Z=8% with no negative tolerance, OCTC, ONAN transformer, taps +/- 5% in steps of 2.5%. Transformers efficiency shall be Efficiency level 2 as per IS 1180.
Overtime rate/ hour beyond normal 8 hours work on normal working days.
Overtime rate/hour for work on weekly off days/ holidays (as applicable at Project site).
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .