| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NTPC LIMITED EPROCUREMENT PORTAL | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical TECHNO-COMMERCIALLY NON-RESPONSIVE |
| 4 | Rejected-Technical | Rejected-Technical TECHNO-COMMERCIALLY NON-RESPONSIVE |
Tender Value
Refer Docs
EMD Value
₹54 L
Closing Date
22 Jul 2020, 5:00 pmClosed
General Manager (CC-III)
General Manager (Civil) CC-III, Room No.220 B, 2nd Floor Jyoti Sadan NHPC Office Complex, Sector-33, Faridabad (121003), Harayana , India
Civil, Hydro-mechanical and Electro-mechanical works for Construction of Surface Power House Building including Architectural works, Tail Race Channel etc. of 2.4 MW (3x0.8MW) Hydroelectric Project at Toe of Dam in Kishanganga H.E. Project,
2020_NHPC_561178_1
NH/CC-III/CO-101/PR-12019/274
Open Tender
Civil Works - Others
820 days
Bandipora,
Please refer Tender documents.
10 documents required · 10 mandatory
₹5,000
NHPC LIMITED
₹54 L
FARIDABAD
7 Oct 2020
27 May 2020
28 Jul 2020
27 May 2020
22 Jul 2020
13 Jun 2020
16 Jun 2020
Amount
Dewatering During Construction
Dewatering of Construction site
Surface Excavation
Common Excavation
Rock Excavation
Minor Excavation
Removal of material arising from overbreak accepted due to geological conditions
Backfill
Random Backfill
Compacted Backfill
Concrete
Plain Cement Concrete (M15/ A40)
Plain Cement Concrete (M20/ A40)
Reinforced Cement Concrete M25/A20
Reinforced Cement Concrete M30/A40
Reinforced Cement Concrete M35/A20
High Performance Concrete (M60/A20)
Precast concrete (M20/A20)
Blockout / second stage Concrete M35/A20
Cement Variation in Concrete
Grouting of equipment bearing plates and anchors
Formwork
Class F1/F1C
Class F2/F2C
Class F3/F3C
Reinforcement Steel
Deformed Reinforcing Bars - Grade Fe 500
Waterstops and joints
P.V.C. Water Stops(230 mm wide)
Joint Sealing Compound
Joint Fillers(12 mm thk)
Joint Sealant (Including primer)
Bituminous Compound
Metalworks
Steel Pipes
Miscellaneous Steel Sections
Steel Covers, Frames and Gratings
Handrails and Railings
Ladders and Climbing Irons
Building and Architectural Works
Brick masonry in cement mortar 1:4
Wall, Floor and Roof Furnishes
13 mm thick interior plane faced cement plaster in cement mortar (1:4) on walls and concrete surfaces.
20 mm thick exterior sand faced cement plaster in cement sand mortar (1:3) in 2 layers (first layer 14 mm thick, second layer 6mm thick)
Ceramic vitrified tiles(Anti skidding) for Control room/office room & toilet etc.
Kota stone flooring in staircases and general circulation area
Acid resistant tiles in battery room
Granolithic Flooring for Generator Floor,service bay & E&M Workshop
Corrugated Galvanised Steel Sheet Roofing
CGS Sheets 1mm thick
Ridges and Hips
Cast Iron Rain Water Pipes and Fitings
- 100 mm dia
- 150 mm dia
Down Spout
False ceiling made from combination of FRP Panel, Mineral fibre ceiling and curved perforated steel in office room, control room,battery room and toilet.
Aluminium Doors, Windows and Partitions
Aluminium Door
Aluminium Window and Ventilators
Aluminium Partitions
Float Glass
Glass Panels
Gear operated steel rolling shutter
Painiting Works
Two coats of emulsion acrylic paint (water based) of approved quality shade over a primary coat for internal walls and concrete surfaces.
Two coats of emulsion acrylic paint (water based) of approved quality shade over a primary coat for exterior walls and concrete surfaces.
Insulation of Rooms at top of control room
Thermal Insulating panel in walls and roof of Rooms at top of Control Room
Miscellaneous and Ancillary Works
Fencing
Security Gate
PVC Pipes
-75mm dia
-100mm dia
-150mm dia
Slope Protection
Rock Paving
Stone Pitching
Gabions (Wire Crates)
Wirecrates
Boulders
Service Water supply, Sewage System and Sanitary Installation
Pipe Work
25 mm nominal dia GS pipe
15 mm nominal dia GS pipe
150 mm nominal dia CI pipe
75 mm nominal dia CI pipe
Water Closet Unit
Wash Basin Unit
Service Sink Unit
Urinal Unit
Kitchen Unit
PVC Water Tank 1500 litre capacity
Globe Valves
Check Valves
Safety Valves
Draw-off taps
Description of Work / Item(s)
Amount
TURBINE AND ACCESSORIES
Horizontal Francis Turbine having rated output of 850 kW capacity, rated head of 20.8 m, rated unit discharge 4.5 m3/second, complete with essential auxiliaries like lubrication equipment, oil, water and air piping, instruments, controls, safety devices as per the specifications. Performance test at site at one unit.
GOVERNOR
Digital Governing equipments including oil pressure pumping units (common for Governor & MIV), pressure and sump tanks, allied valves and piping, etc.
MAIN INLET VALVE
Inlet valves (butterfly valve) for turbines, complete with operating mechanisms, bypass valve, seal, sleeve, piping etc.
PENSTOCK BUTTERFLY VALVE
Penstock Butterfly Valve of dia 1300 mm complete with operating mechanisms, bypass valve, seal, piping etc.
GENERATOR AND ACCESSORIES
900 KVA capacity at 3.3 KV and 0.9 power factor, 50 Hz synchronous generator, direct driven, horizontal shaft, bearings, other components and auxiliaries, Instruments, Control & safety devices for generators as per the specifications. Performance test at site at one unit.
Generator Neutral Grounding Transformer Panel
Generator PTSP Panel completes with PT's, LA.
EXCITATION SYSTEM
Brushless Excitation system equipment complete with AVR and other accessories.
Excitation transformer
STEP UP TRANSFORMERS (3.3/11 kV)
3.3/11 kV, 1000 KVA, 3-phase, 50 Hz, Oil immersed, ONAN cooled outdoor type transformer complete with OLTC (-10% to +5% range), bushings, under-carriage, CTs and all fittings and accessories as per the specifications.
POWER & CONTROL CABLE
3.3 KV XLPE Aluminium cables for connection of Three nos. Generator to their Generator Transformer complete with all accessories
11 KV XLPE Aluminium cables for connection of three nos. Generator Transformers, two nos. outgoing feeders (up to nearest pole outside) and two nos. Station Auxiliary Transformer to 11 KV Switchgear complete with all accessories.
Power and control cables, cable trays, supporting structures, complete with cable terminals and all accessories.
CONTROL, MONITORING AND PROTECTION SYSTEM
Computerized Control & Protection Panel for Generating unit, GSU and 11 kV Switchgear, SAB and other system including Alarm, Annunciation & Generator Synchronizing facility along-with all accessories. One no. operator work stations and historian in control room.
11 kV SWITCHGEAR EQUIPMENTS
11 KV indoor switchgear complete with CTs & PTs with all accessories.
STATION AUXILIARY TRANSFORMER
11KV/415V, 500 kVA Station Aux. Transformer.
415V AUXILIARY POWER SYSTEM
415 Volts Station Auxiliary Board complete with auxiliary panels its protection system.
DC SYSTEM
110V, 200AH DC system consisting of battery, charger, Inverter, distribution boards, etc. as per specification.
HEATING, VENTILATION & AIR CONDITIONING SYSTEM
4 nos. Hot air blowers, ventilation & exhaust fans & 2 nos. split AC for control room for power house complex with all accessories and control.
ILLUMINATION SYSTEM
LED based illumination system complete with all accessories and UPS with battery for emergency lighting.
GROUNDING SYSTEM
Grounding system complete with all accessories.
EOT CRANE
One no. pendant and radio control EOT crane for Power House with all accessories.
COOLING WATER SYSTEM
Cooling Water system along with all accessories.
DRAINAGE SYSTEM
Drainage Water system with all accessories.
OIL HANDLING SYSTEM
Oil Handling system with all accessories.
FIRE FIGHTING SYSTEM
Fire Fighting System along with all accessories. Portable type Fire Extinguishers and 3 nos. of service taps from penstock with fire hose.
Description of Work / Item(s)
Amount
TURBINE AND ACCESSORIES
Horizontal Francis Turbine having rated output of 850 kW capacity, rated head of 20.8 m, rated unit discharge 4.5 m3/second, complete with essential auxiliaries like lubrication equipment, oil, water and air piping, instruments, controls, safety devices as per the specifications. Performance test at site at one unit.
GOVERNOR
Digital Governing equipments including oil pressure pumping units (common for Governor & MIV), pressure and sump tanks, allied valves and piping, etc.
MAIN INLET VALVE
Inlet valves (butterfly valve) for turbines, complete with operating mechanisms, bypass valve, seal, sleeve, piping etc.
PENSTOCK BUTTERFLY VALVE
Penstock Butterfly Valve of dia 1300 mm complete with operating mechanisms, bypass valve, seal, piping etc.
GENERATOR AND ACCESSORIES
900 KVA capacity at 3.3 KV and 0.9 power factor, 50 Hz synchronous generator, direct driven, horizontal shaft, bearings, other components and auxiliaries, Instruments, Control & safety devices for generators as per the specifications. Performance test at site at one unit.
Generator Neutral Grounding Transformer Panel
Generator PTSP Panel completes with PT's, LA.
EXCITATION SYSTEM
Brushless Excitation system equipment complete with AVR and other accessories.
Excitation transformer
STEP UP TRANSFORMERS (3.3/11 kV)
3.3/11 kV, 1000 KVA, 3-phase, 50 Hz, Oil immersed, ONAN cooled outdoor type transformer complete with OLTC (-10% to +5% range), bushings, under-carriage, CTs and all fittings and accessories as per the specifications.
POWER & CONTROL CABLE
3.3 KV XLPE Aluminium cables for connection of Three nos. Generator to their Generator Transformer complete with all accessories
11 KV XLPE Aluminium cables for connection of three nos. Generator Transformers, two nos. outgoing feeders (up to nearest pole outside) and two nos. Station Auxiliary Transformer to 11 KV Switchgear complete with all accessories.
Power and control cables, cable trays, supporting structures, complete with cable terminals and all accessories.
CONTROL, MONITORING AND PROTECTION SYSTEM
Computerized Control & Protection Panel for Generating unit, GSU and 11 kV Switchgear, SAB and other system including Alarm, Annunciation & Generator Synchronizing facility along-with all accessories. One no. operator work stations and historian in control room.
11 kV SWITCHGEAR EQUIPMENTS
11 KV indoor switchgear complete with CTs & PTs with all accessories.
STATION AUXILIARY TRANSFORMER
11KV/415V, 500 kVA Station Aux. Transformer.
415V AUXILIARY POWER SYSTEM
415 Volts Station Auxiliary Board complete with auxiliary panels its protection system.
DC SYSTEM
110V, 200AH DC system consisting of battery, charger, Inverter, distribution boards, etc. as per specification.
HEATING, VENTILATION & AIR CONDITIONING SYSTEM
4 nos. Hot air blowers, ventilation & exhaust fans & 2 nos. split AC for control room for power house complex with all accessories and control.
ILLUMINATION SYSTEM
LED based illumination system complete with all accessories and UPS with battery for emergency lighting.
GROUNDING SYSTEM
Grounding system complete with all accessories.
EOT CRANE
One no. pendant and radio control EOT crane for Power House with all accessories.
COOLING WATER SYSTEM
Cooling Water system along with all accessories.
DRAINAGE SYSTEM
Drainage Water system with all accessories.
OIL HANDLING SYSTEM
Oil Handling system with all accessories.
FIRE FIGHTING SYSTEM
Fire Fighting System along with all accessories. Portable type Fire Extinguishers and 3 nos. of service taps from penstock with fire hose.
Description of Work / Item(s)
Amount
Bye Pass Gates & Hydraulic Hoists
Bye Pass Service Gate (Slide Type) (1.15m x 1.15m)
First stage embedded parts for 3.1 including 300 dia. Air vent pipe along with 300dia. Air release/ vacuum breaker valve, steel liner, bonnet & bonnet cover, Hoist supporting structure and Dogging arrangement etc.
Bye Pass Emergency Gate (1.15m x 1.15m)
First stage embedded parts for 3.3 including pressure relief valve, steel liner, bonnet & bonnet cover, Hoist supporting structure and Dogging arrangement etc.
Hydraulic Cylinders (double acting) (each of 45T Capacity) for 3.1 & 3.3 complete in all respect along with arrangement for gate position indication
Hydraulic Power pack for 3.5 complete in all respect including Electrical Control, piping etc. for a set of service & emergency gates
Mandatory Spare Parts (As per statement 1B)
Tailrace Tunnel Gates and Rope Drum Hoists
Tailrace Tunnel Gates including ballast (fixed wheel type) (3.5m x 2.85m)
First Stage Embedded Parts including 300 dia. Air vent pipe for 4.1
Second Stage Embedded Parts including dogging etc. for 4.1
Rope drum hoist (12T Capacity) complete in all respect and control equipment for 4.1
Hoist supporting bridge & trestle etc. for 4.1
Mandatory Spare Part (As per statement 1B)
Pressure shaft liner & Bye pass Pipe
1.3m Dia. Steel liner in horizontal portion including bifurcation
Steel Transition from 1.3m circular to 1.15m X 1.15m square section 1.4m long
Steel transition from 1.15m x 1.15m square section to 1.3m circular 1.4m long
1.3m circular bye-pass pipe in upper horizontal portion including upper horizontal bend
1.3m Dia. Vertical shaft with upper & lower vertical bends
Branch pipe 0.92*m Dia. Emerging from 1.3m diameter main penstock upto u/s of unit no.-1 MIV
Bifurcation with inlet Dia. 1.3m into branches of 0.92*m Dia.
Steel liner of 0.92*m Dia. Pipe between bifurcation and MIV of unit 2.
0.92*m Dia. Steel liner including lower horizontal bend with lower horizontal pressure shaft after bifurcation in unit no. 3.
1.3m dia steel pipe for e-flow during construction.
Instrumentation and Control System
A) Following instruments shall also be provided at their respective locations complete in all respect and is not part of PLC system:- i) One (1) set of water level measuring system to indicate balance head condition of penstock intake bulk head gate. ii) One (1) set of water level measuring and indication Equipment at Tail Race area. iii) Three (3) sets of water level measuring system to indicate balance head condition of tail race channel gates. iv) One (1) set of flow meter in bye pass pipe to indicate discharge passing through bye-pass. v) One (1) set of flow meter in steel pipe for e-flow during construction. C) Distribution board & feeder pillar for all HM equipments.
Mandatory Spare Parts (As per statement 1B)
Mandatory Tools & Tackles (As per statement 1A)
Description of Work / Item(s)
Amount
Bye Pass Gates & Hydraulic Hoists
Bye Pass Service Gate (Slide Type) (1.15m x 1.15m)
First stage embedded parts for 3.1 including 300 dia. Air vent pipe along with 300dia. Air release/ vacuum breaker valve, steel liner, bonnet & bonnet cover, Hoist supporting structure and Dogging arrangement etc.
Bye Pass Emergency Gate (1.15m x 1.15m)
First stage embedded parts for 3.3 including pressure relief valve, steel liner, bonnet & bonnet cover, Hoist supporting structure and Dogging arrangement etc.
Hydraulic Cylinders (double acting) (each of 45T Capacity) for 3.1 & 3.3 complete in all respect along with arrangement for gate position indication
Hydraulic Power pack for 3.5 complete in all respect including Electrical Control, piping etc. for a set of service & emergency gates
Mandatory Spare Parts (As per statement 1B)
Tailrace Tunnel Gates and Rope Drum Hoists
Tailrace Tunnel Gates including ballast (fixed wheel type) (3.5m x 2.85m)
First Stage Embedded Parts including 300 dia. Air vent pipe for 4.1
Second Stage Embedded Parts including dogging etc. for 4.1
Rope drum hoist (12T Capacity) complete in all respect and control equipment for 4.1
Hoist supporting bridge & trestle etc. for 4.1
Mandatory Spare Part (As per statement 1B)
Pressure shaft liner & Bye pass Pipe
1.3m Dia. Steel liner in horizontal portion including bifurcation
Steel Transition from 1.3m circular to 1.15m X 1.15m square section 1.4m long
Steel transition from 1.15m x 1.15m square section to 1.3m circular 1.4m long
1.3m circular bye-pass pipe in upper horizontal portion including upper horizontal bend
1.3m Dia. Vertical shaft with upper & lower vertical bends
Branch pipe 0.92*m Dia. Emerging from 1.3m diameter main penstock upto u/s of unit no.-1 MIV
Bifurcation with inlet Dia. 1.3m into branches of 0.92*m Dia.
Steel liner of 0.92*m Dia. Pipe between bifurcation and MIV of unit 2.
0.92*m Dia. Steel liner including lower horizontal bend with lower horizontal pressure shaft after bifurcation in unit no. 3.
1.3m dia steel pipe for e-flow during construction.
Instrumentation and Control System
A) Following instruments shall also be provided at their respective locations complete in all respect and is not part of PLC system:- i) One (1) set of water level measuring system to indicate balance head condition of penstock intake bulk head gate. ii) One (1) set of water level measuring and indication Equipment at Tail Race area. iii) Three (3) sets of water level measuring system to indicate balance head condition of tail race channel gates. iv) One (1) set of flow meter in bye pass pipe to indicate discharge passing through bye-pass. v) One (1) set of flow meter in steel pipe for e-flow during construction. C) Distribution board & feeder pillar for all HM equipments.
Mandatory Spare Parts (As per statement 1B)
Mandatory Tools & Tackles (As per statement 1A)
Description of Work / Item(s)
Amount
Schedule. No.1: Civil Works
Schedule No.2A: Supply of E&M Plant & Equipment
Schedule No. 2B Transportation, Insurance & Erection services for E&M Plant & Equipment
Schedule No. 3A Supply of HM Plant & Equipment including mandatory spares and tools & tackles
Schedule No. 3B Transportation, Insurance & Erection services for HM Plant & equipment
Precision Infratech Pvt. Ltd.
Precision Infratech Pvt. Ltd.
Precision Infratech Pvt. Ltd.
Precision Infratech Pvt. Ltd.
Precision Infratech Pvt. Ltd.
Precision Infratech Pvt. Ltd.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx