Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-NOT FROM RESPECTIVE PANCHAYAT |
Tender Value
₹2.5 L
Closing Date
28 Feb 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER RURAL ENGINEERING WING SHOP
EXECUTIVE ENGINEER RURAL ENGINEERING WING SHOPIAN
IMP OF KULL WITH RWALL FROM LO YONUS THOKER TO NAZIR THOKHER AT TAKIPORA PRATABPORA
2022_RDPR_161675_15
NIT230OF2020-21
Open Tender
Civil Works
Item Rate
30 days
SHOPIAN
Please refer Tender documents.
4 documents required · 4 mandatory
₹250
Rural Development and Panchayati Raj
Exempted
1 Mar 2022
22 Feb 2022
1 Mar 2022
22 Feb 2022
28 Feb 2022
22 Feb 2022
30 days
Amount
Site clearance by way of engagement of labours,cutting of bushes etc.erth work in excavation by maniual means including disposals of excavated earth I/C extra for additional lift of 1.5 m
Earthwork in excavation by manual meansin trenchs for foundation drains pipes cables etc( not exceeding 1.5metre in width and for shaft wells cesspits and the like not exceeding 10 sqm on plan) including dressing of sides, ramming of bottoms lift up to 1.5 m and 25 m beyand cutting edge including getting out excavated and disposal of surplus excavated earth as directed
Providing and laying stone solling dry handpacked tightly ) including carriage from sourse to site of work
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttring all work up tp to plinth level with miix1:2 :4 ( 1 cement :2 course sand :4 graded stone aggregate) nominal size 20 mm crushed stone aggregate including carriage complate up to site of work
Centering and shuttering including strutting and propping including removal of farm work in fondations slabs,beams raft etc incld carriage
provision for fixing carriage and cost of sign board /
M/S MUDDASSIR NAZIR
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .