Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹9.4 L+₹14,229.92 (1.54%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | L3₹9.6 L+₹37,690.01 (4.08%)Accepted-Finance | L3 | Accepted-Finance Accepted | |
| 4 | L4₹9.6 L+₹40,251.61 (4.36%)Accepted-Finance | L4 | Accepted-Finance Accepted | |
| 5 | L5₹10.1 L+₹86,335.26 (9.35%)Accepted-Finance | L5 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | Yougesh B Class Contractor L6 | SAFEENA BEGUM L7 | Mudassar Ahmed L4 | INDERJEET PARIHAR L5 | JAMEEL AHMED L9 | Yassir Ahmrd L3 | MOHAMMAD ASHRAF L1 | M/S MOHD ISHAFQ CONTRACTOR L8 | vikram singh L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Wooden foot bridge 2 No of 35 ft span Earthworkinexcavationbymanualmeansoverareas(Exceeding 30 Cm and upto1.5mtr in depth,
1.5mtr in width as well as10 sqm.onplan)includingdisposalofexcavatedearthupto1mtrfrom
cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil | 9.52 | Cum | 300 ₹2,856 | 400 ₹3,808 | 300 ₹2,856 | 4,000 ₹38,080 | 410 ₹3,903.2 | 400 ₹3,808 | 273.33 ₹2,602.1 | 250 ₹2,380 Lowest | 500 ₹4,760 |
| 2.00 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah | 14.95 | Cum | 2,500 ₹37,375 | 2,500 ₹37,375 | 2,000 ₹29,900 | 3,000 ₹44,850 | 2,862 ₹42,786.9 | 1,500 ₹22,425 | 1,859.34 ₹27,797.13 | 2,000 ₹29,900 | 500 ₹7,475 Lowest |
| 3.00 | Extraction , transportation and Labour of Wood for making Wooden Foot Bridge ofSpan35 ft
complete job as per directed by the site incharge Engage 4 Carpenter for 20 days for making 2 foot bridge of Span 35 ft | 80 | No | 500 ₹40,000 | 750 ₹60,000 | 350 ₹28,000 Lowest | 1,200 ₹96,000 | 612 ₹48,960 | 750 ₹60,000 | 418.38 ₹33,470.4 | 800 ₹64,000 | 500 ₹40,000 |
| 4.00 | Engage 8 Labour for 20 days for making 2 foot bridge of Span 35 ft | 160 | No | 300 ₹48,000 Lowest | 550 ₹88,000 | 350 ₹56,000 | 1,000 ₹1,60,000 | 460 ₹73,600 | 500 ₹80,000 | 315.21 ₹50,433.6 | 800 ₹1,28,000 | 350 ₹56,000 |
| 5.00 | Providing and fixing of Nails | 30 | Kg | 150 ₹4,500 | 150 ₹4,500 | 100 ₹3,000 | 300 ₹9,000 | 90 ₹2,700 | 100 ₹3,000 | 60 ₹1,800 Lowest | 120 ₹3,600 | 750 ₹22,500 |
| 6.00 | Painting withsyntheticenamel paint of approvedbrandandmanufacture togiveanevenshade.
Twoormore coats onnewworkover anunder coat of suitable shadewithordinarypaint of
approved brand and manufacture. | 71.56 | Sqm | 100 ₹7,156 | 190 ₹13,596.4 | 180 ₹12,880.8 | 25 ₹1,789 Lowest | 160 ₹11,449.6 | 100 ₹7,156 | 116.79 ₹8,357.49 | 150 ₹10,734 | 500 ₹35,780 |
| 7.00 | Carriage of materials from source to site of work Stone av. Distance HL 500 mtr | 14.95 | Cum | 300 ₹4,485 | 400 ₹5,980 | 600 ₹8,970 | 6,000 ₹89,700 | 610 ₹9,119.5 | 750 ₹11,212.5 | 398 ₹5,950.1 | 100 ₹1,495 Lowest | 100 ₹1,495 Lowest |
| 8.00 | Construction of Path 11000 FT Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not
exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan,
depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed
earth to be levelled and neatly dressed in all kinds of soil | 451.71 | Cum | 300 ₹1,35,513 | 241 ₹1,08,862.11 | 250 ₹1,12,927.5 | 140 ₹63,239.4 Lowest | 360 ₹1,62,615.6 | 300 ₹1,35,513 | 273.33 ₹1,23,465.89 | 250 ₹1,12,927.5 | 400 ₹1,80,684 |
| 9.00 | Dry random rubble masonry with hard stone in foundation and plinth With bond stone. | 55.76 | Cum | 2,500 ₹1,39,400 | 2,000 ₹1,11,520 | 1,500 ₹83,640 | 1,200 ₹66,912 | 2,430 ₹1,35,496.8 | 1,200 ₹66,912 | 1,859.34 ₹1,03,676.8 | 2,000 ₹1,11,520 | 500 ₹27,880 Lowest |
| 10.00 | Dry stone pitching, 225mm thick, including cost of stones and preparation of surface. | 543.68 | Sqm | 580 ₹3,15,334.4 | 280 ₹1,52,230.4 | 180 ₹97,862.4 | 110 ₹59,804.8 Lowest | 230 ₹1,25,046.4 | 300 ₹1,63,104 | 191.6 ₹1,04,169.09 | 400 ₹2,17,472 | 250 ₹1,35,920 |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
1 Jul 2026, 4:00 pmClosed
Wildlife Warden Chenab Division,Kishtwar
Kishtwar
Construction of Track route in Kibar Catchment from Kibar to Bramsar including Construction of path foot bridge shelter shed and tenting sites Under Mitigation Plan Wildlife Division Kishtwar for the Year 2026 27
2026_FD_312736_1
NIT 02 OF 2026-27 TRACK ROUTE KIBAR TO BRAMHSAR
Open Tender
Civil Works
Item Wise
90 days
Kibar, Dachhan.
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Wildlife Warden Chenab Division,Kishtwar
₹30,000
29 Sept 2026
17 Jun 2026
2 Jul 2026
17 Jun 2026
1 Jul 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Wooden foot bridge 2 No of 35 ft span Earthworkinexcavationbymanualmeansoverareas(Exceeding 30 Cm and upto1.5mtr in depth,
1.5mtr in width as well as10 sqm.onplan)includingdisposalofexcavatedearthupto1mtrfrom
cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil | 9.52 | Cum | - | - |
| 2 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah | 14.95 | Cum | - | - |
| 3 | Extraction , transportation and Labour of Wood for making Wooden Foot Bridge ofSpan35 ft
complete job as per directed by the site incharge Engage 4 Carpenter for 20 days for making 2 foot bridge of Span 35 ft | 80 | No | - | - |
| 4 | Engage 8 Labour for 20 days for making 2 foot bridge of Span 35 ft | 160 | No | - | - |
| 5 | Providing and fixing of Nails | 30 | Kg | - | - |
| 6 | Painting withsyntheticenamel paint of approvedbrandandmanufacture togiveanevenshade.
Twoormore coats onnewworkover anunder coat of suitable shadewithordinarypaint of
approved brand and manufacture. | 71.56 | Sqm | - | - |
| 7 | Carriage of materials from source to site of work Stone av. Distance HL 500 mtr | 14.95 | Cum | - | - |
| 8 | Construction of Path 11000 FT Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not
exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan,
depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed
earth to be levelled and neatly dressed in all kinds of soil | 451.71 | Cum | - | - |
| 9 | Dry random rubble masonry with hard stone in foundation and plinth With bond stone. | 55.76 | Cum | - | - |
| 10 | Dry stone pitching, 225mm thick, including cost of stones and preparation of surface. | 543.68 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.34 MB
BOQ_1012228.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .