| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | ₹2.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.6 LRejected-AOC 1 118 MARIYAMMAN KOVIL STREET KALPAGANUR POST ATTUR TK SALEM DISTRICT | MADURAI | TAMIL NADU | 625001 | ₹2.6 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SMR CONSTRUCTIONS | SSS CONSTRUCTION |
|---|---|---|---|---|---|
| 1.00 | Plastering with cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) | 72 | M2 | 43,848 ₹51,740.64 | 43,920 ₹51,825.60 |
| 2.00 | Plastering with cement mortar 1:3 (One part of Cement and three part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 60.4 | M2 | 18,422 ₹21,737.96 | 18,422 ₹21,737.96 |
| 3.00 | Plastering with cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 10mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 19.02 | M2 | 6,276.6 ₹7,406.39 | 6,371.7 ₹7,518.61 |
| 4.00 | Painting two coats for Interior surface with approved Interior Plastic Emulsion paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. | 79.43 | M2 | 21,287.24 ₹25,118.94 | 21,446.1 ₹25,306.40 |
| 5.00 | Painting two coats for Exterior surface with approved Exterior Plastic Emulsion paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. | 72.01 | M2 | 19,370.69 ₹22,857.41 | 19,442.7 ₹22,942.39 |
| 6.00 | Paving the floor with Double charged Vitrified tiles of approved quality and colour of size 600x600x8mm thick of approved make, quality and colour in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick and laid straight alignment and pointed neatly with colour cement at the rate of 0.40kg/m2 laid without any air gap in the tiles neatly and fixing in position as per standard specifications and as directed by the departmental officer. The colour & quality of tiles should be got approved by Municipal Engineer before use on work | 21 | M2 | 32,130 ₹37,913.40 | 32,340 ₹38,161.20 |
| 7.00 | Providing and fixing casement doors fabricated from un-plasticized polyvinyl chloride (uPVC) sections Profiles: The profiles should be three chamber system which provides high insulation properties with outer frame 60mm x 55mm with an outer wall thickness of 2.4mm. The window unit should be designed with all corner joints mitred and fusion welded. Windows should be steel reinforced with 25 x 24 x 25mm steel reinforcement with a thickness of 1mm to have dimensional stability. The sash should be of 60 x 102mm. The mullion should be of 60 x 74mm. The profiles should have co-extruded seals.Hardware: All the hardware like friction stays, handles should be screwed with self tapping screws. The handles, locks should be designed so that they cannot be released from outside.Glazing: The window system should be glazed with 5mm plain float glass / 6mm bison lam. Installation: The profiles should be cut to length and welded 45 degrees. The window should be designed such that the water drainage does not pass through the reinforcement chamber. The window system should be fixed directly to the plastered brick wall using self expanding nylon plug and driving ms electroplated screws into plug | 1.9 | M2 | 15,789 ₹18,631.02 | 15,865 ₹18,720.70 |
| 8.00 | Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 25GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with spag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown olour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The window should be got approved from the executive Engineer before use on work | 5.78 | M2 | 43,245.96 ₹51,030.23 | 43,350 ₹51,153 |
| 9.00 | Finishing the top of roof with one course of machine pressed tiles of size 200 mm x 200 mm x 20 mm of approved quality in Cement Mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 12 mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete | 21 | M2 | 7,896 ₹9,317.28 | 8,400 ₹9,912 |
| 10.00 | Weathering Course with Concrete Broken Brick (S.I.No.278) & ( P & D) Data 54.Jelly 20mm gauge in pure slaked lime (no sand to be added) over roof slab,the proportion of brick jelly to lime being '32 to 12.5 well beated with wooden beaters for giving required slope and thickness as directed by the departmental officers etc., complete.-10 cum | 1.91 | M3 | 8,213 ₹9,691.34 | 8,404 ₹9,916.72 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
11 Apr 2025, 3:00 pmClosed
The Commissioner ,Tambaram Corporation
No.01,Kalaivani Street , Rajakilpakkam , chennai-73
Restoration of public Toilet and changes to medicine distribution Center in Ward no.34
2025_DMA_542319_4
003/2024/E1
Open Tender
Civil Works
90 days
Tambaram CIty Municipal Corporation, Zone -3
Restoration of public Toilet and changes to medicine distribution Center in Ward no.34
2 documents required · 2 mandatory
₹0
₹5,000
12 Mar 2026
9 Apr 2025
11 Apr 2025
9 Apr 2025
11 Apr 2025
9 Apr 2025
Plastering with cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309)
Plastering with cement mortar 1:3 (One part of Cement and three part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications
Plastering with cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 10mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications
Painting two coats for Interior surface with approved Interior Plastic Emulsion paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification.
Painting two coats for Exterior surface with approved Exterior Plastic Emulsion paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification.
Paving the floor with Double charged Vitrified tiles of approved quality and colour of size 600x600x8mm thick of approved make, quality and colour in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick and laid straight alignment and pointed neatly with colour cement at the rate of 0.40kg/m2 laid without any air gap in the tiles neatly and fixing in position as per standard specifications and as directed by the departmental officer. The colour & quality of tiles should be got approved by Municipal Engineer before use on work
Providing and fixing casement doors fabricated from un-plasticized polyvinyl chloride (uPVC) sections Profiles: The profiles should be three chamber system which provides high insulation properties with outer frame 60mm x 55mm with an outer wall thickness of 2.4mm. The window unit should be designed with all corner joints mitred and fusion welded. Windows should be steel reinforced with 25 x 24 x 25mm steel reinforcement with a thickness of 1mm to have dimensional stability. The sash should be of 60 x 102mm. The mullion should be of 60 x 74mm. The profiles should have co-extruded seals.Hardware: All the hardware like friction stays, handles should be screwed with self tapping screws. The handles, locks should be designed so that they cannot be released from outside.Glazing: The window system should be glazed with 5mm plain float glass / 6mm bison lam. Installation: The profiles should be cut to length and welded 45 degrees. The window should be designed such that the water drainage does not pass through the reinforcement chamber. The window system should be fixed directly to the plastered brick wall using self expanding nylon plug and driving ms electroplated screws into plug
Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 25GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with spag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown olour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The window should be got approved from the executive Engineer before use on work
Finishing the top of roof with one course of machine pressed tiles of size 200 mm x 200 mm x 20 mm of approved quality in Cement Mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 12 mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete
Weathering Course with Concrete Broken Brick (S.I.No.278) & ( P & D) Data 54.Jelly 20mm gauge in pure slaked lime (no sand to be added) over roof slab,the proportion of brick jelly to lime being '32 to 12.5 well beated with wooden beaters for giving required slope and thickness as directed by the departmental officers etc., complete.-10 cum
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid