| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.1 L+₹55,846.82 (4.46%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹13.5 L+₹91,767.88 (7.32%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹14.2 L+₹1.6 L (13.1%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹14.3 L+₹1.7 L (13.8%)Rejected-AOC | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | GNANAVEL L2 | V.Usha L3 | J.P.CONSTRUCTION L4 | MST RAJ CONSTRUCTION L5 | G.K.Gunasekaran L1 |
|---|---|---|---|---|---|---|---|---|
| 1.001. CONSTRUCTION OF PUBLIC DISTRIBUTION SYSTEM AT ANNUGUDI HABITATION IN 57,KULAMANIKKAM PANCHAYAT. | ||||||||
| 2.00 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete | 41.51 | Cum | 243 ₹10,086.93 | 255 ₹10,585.05 | 258.5 ₹10,730.34 | 261.5 ₹10,854.87 | 215 ₹8,924.65 Lowest |
| 3.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 8.98 | Cum | 2,403 ₹21,578.94 | 2,100 ₹18,858 | 2,603.55 ₹23,379.88 | 2,621.5 ₹23,541.07 | 1,954 ₹17,546.92 Lowest |
| 4.00 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete | 8.63 | Cum | 5,961 ₹51,443.43 Lowest | 6,100 ₹52,643 | 6,475.45 ₹55,883.13 | 6,488.5 ₹55,995.76 | 6,100 ₹52,643 |
| 5.00 | Filling the basement with U S Gravel including cost and conveyance of | 13.16 | Cum | 861 ₹11,330.76 Lowest | 900 ₹11,844 | 931.25 ₹12,255.25 | 939.45 ₹12,363.16 | 900 ₹11,844 |
| 6.00 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. A).Below Basement | 8.96 | Cum | 5,788 ₹51,860.48 Lowest | 6,200 ₹55,552 | 6,296.47 ₹56,416.37 | 6,298.35 ₹56,433.22 | 6,100 ₹54,656 |
| 7.00 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. B).Super Structure | 16.54 | Cum | 5,874 ₹97,155.96 Lowest | 6,350 ₹1,05,029 | 6,382.5 ₹1,05,566.55 | 6,388.74 ₹1,05,669.76 | 6,250 ₹1,03,375 |
| 8.00 | Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete. I) Below Basement | 50.27 | Sqm | 503 ₹25,285.81 Lowest | 530 ₹26,643.1 | 541.66 ₹27,229.25 | 545.5 ₹27,422.29 | 530 ₹26,643.1 |
| 9.00 | Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete. II) LINTELS, RCC SLABS, BEAMS, TEE or ELL BEAMS, | 112.4 | sqm | 1,006 ₹1,13,074.4 | 950 ₹1,06,780 Lowest | 1,089.45 ₹1,22,454.18 | 1,092.5 ₹1,22,797 | 950 ₹1,06,780 Lowest |
| 10.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works | 2.1 | MT | 84,433 ₹1,77,309.3 Lowest | 90,000 ₹1,89,000 | 91,756.35 ₹1,92,688.34 | 91,869.55 ₹1,92,926.06 | 85,000 ₹1,78,500 |
Tender Value
Refer Docs
EMD Value
₹14,500
Closing Date
24 Sept 2026, 12:00 pmClosed
Block Development officer B.pt Kottur
Block Development office B.pt Kottur
1 CONSTRUCTION OF PUBLIC DISTRIBUTION SYSTEM AT ANNUGUDI HABITATION IN 57 KULAMANIKKAM PANCHAYAT at KOTTUR Block in Tiruvaur District Package No 1 KTR MPLADS 2025 26
2026_RDTN_703347_1
RC No 1485 2026 a2 date 10 09 2026 P1 57, Kulamanikkam Panchayat Kottur block P1
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kottur
As Per Tender Document
8 documents required · 8 mandatory
₹0
₹14,500
Yes
Block Development office B.pt Kottur
8 Oct 2026
10 Sept 2026
24 Sept 2026
10 Sept 2026
24 Sept 2026
10 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. CONSTRUCTION OF PUBLIC DISTRIBUTION SYSTEM AT ANNUGUDI HABITATION IN 57,KULAMANIKKAM PANCHAYAT. | - | - | - | - |
| 2 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete | 41.51 | Cum | - | - |
| 3 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 8.98 | Cum | - | - |
| 4 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete | 8.63 | Cum | - | - |
| 5 | Filling the basement with U S Gravel including cost and conveyance of | 13.16 | Cum | - | - |
| 6 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. A).Below Basement | 8.96 | Cum | - | - |
| 7 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. B).Super Structure | 16.54 | Cum | - | - |
| 8 | Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete. I) Below Basement | 50.27 | Sqm | - | - |
| 9 | Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete. II) LINTELS, RCC SLABS, BEAMS, TEE or ELL BEAMS, | 112.4 | sqm | - | - |
| 10 | Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works | 2.1 | MT | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_845445.xls
BOQ • 0.39 MB
tecbid.pdf
Tender Documents • 0.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .