Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical NEDUNGULAM | THIRUVALLUR | TAMIL NADU | 600019 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
8 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector(Dev),RDDA, Ramanathapuram
District Rural Development Agency, Ramanathapuram
Rejuvenation of Water Bodies in Package No.PMK-1/AGAMT 2021-22 of Paramakudi Block in Ramanathapuram District under AGAMT 2021-22
2022_RDTN_242424_1
R7/5593/2021/dated 05.07.2022 PMK-1
Open Tender
Civil Works - Bridges
Item Rate
180 days
District Rural Development Agency
Refer to Tender Document
6 documents required · 6 mandatory
₹0
₹90,000
District Rural Development Agency, Ramanathapuram
9 Sept 2022
18 Jul 2022
8 Aug 2022
18 Jul 2022
8 Aug 2022
20 Jul 2022
20 Jul 2022
Amount
Part I : Somanathapuram Habitation, Deepening of Somanathapuram Poodankki Oorani with construction of bathing ghat and Inlet
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and conveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc. completed
Sectioning during forming bunds when earth moving machineries, loories and rollers are used for consolidation (Annexure III - D.50D)
Construction of Bathing ghat
Earth work Excavation and depositing on bank with initial lead and lift in hard stiff clay block cotton hard red earth shales murrams, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Sand filling with river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc complete
Cement concrete 1:4:8 mix using 40mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Cement concrete 1:2:4 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Supply and errection of centering with necessary supports for RCC item of works including cost and conveyance of all material and labour charges etc complete.
Supplying and Fabrication, placing in position of mild steel girlls for RCC works including cost of steel and binding wire etc.
Reinforcement cement concrete 1:1:5:3 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Colour washing two coats using approved colour pigments including cost and conveyance etc., complete
Construction of Inlet
Earth work Excavation for foundation in all soils and sub soil to full depth in hard stiff clay, stiff block cotton, hard red earth, shales murrum, gravel stoney earth and arth mixed with small sized boulders etc complete.
Supplying and filling foundation with river sand including watering consolidation ect complete
Plain cement concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete
Supplying erecting centreing, shuttering for sides and soffits including strutting etc complete
Towards cost and conveyance of 900mm dia RCC Hume pipes including all charges etc complete
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc complete
Part II : Valaiyanenthal Habitation, Deepening of Pudukulam Oorani with construction of bathing ghat and Inlet
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and conveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc. completed
Sectioning during forming bunds when earth moving machineries, loories and rollers are used for consolidation (Annexure III - D.50D)
Construction of Bathing ghat
Earth work Excavation and depositing on bank with initial lead and lift in hard stiff clay block cotton hard red earth shales murrams, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Sand filling with river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc complete
Cement concrete 1:4:8 mix using 40mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Cement concrete 1:2:4 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Supply and errection of centering with necessary supports for RCC item of works including cost and conveyance of all material and labour charges etc complete.
Supplying and Fabrication, placing in position of mild steel girlls for RCC works including cost of steel and binding wire etc.
Reinforcement cement concrete 1:1:5:3 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Colour washing two coats using approved colour pigments including cost and conveyance etc., complete
Construction of Inlet
Earth work Excavation for foundation in all soils and sub soil to full depth in hard stiff clay, stiff block cotton, hard red earth, shales murrum, gravel stoney earth and arth mixed with small sized boulders etc complete.
Supplying and filling foundation with river sand including watering consolidation ect complete
Plain cement concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete
Supplying erecting centreing, shuttering for sides and soffits including strutting etc complete
Towards cost and conveyance of 900mm dia RCC Hume pipes including all charges etc complete
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc complete
Part III : Nenmeni Habitation, Deepening of Pillaiyar kovil Oorani with construction of bathing ghat and Inlet
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and conveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc. completed
Sectioning during forming bunds when earth moving machineries, loories and rollers are used for consolidation (Annexure III - D.50D)
Construction of Bathing ghat
Earth work Excavation and depositing on bank with initial lead and lift in hard stiff clay block cotton hard red earth shales murrams, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Sand filling with river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc complete
Cement concrete 1:4:8 mix using 40mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Cement concrete 1:2:4 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Supply and errection of centering with necessary supports for RCC item of works including cost and conveyance of all material and labour charges etc complete.
Supplying and Fabrication, placing in position of mild steel girlls for RCC works including cost of steel and binding wire etc.
Reinforcement cement concrete 1:1:5:3 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Colour washing two coats using approved colour pigments including cost and conveyance etc., complete
Construction of Inlet
Earth work Excavation for foundation in all soils and sub soil to full depth in hard stiff clay, stiff block cotton, hard red earth, shales murrum, gravel stoney earth and arth mixed with small sized boulders etc complete.
Supplying and filling foundation with river sand including watering consolidation ect complete
Plain cement concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete
Supplying erecting centreing, shuttering for sides and soffits including strutting etc complete
Towards cost and conveyance of 900mm dia RCC Hume pipes including all charges etc complete
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc complete
Part IV : Avarenthal Habitation, Deepening of Kamatchi amman kovil Oorani with construction of bathing ghat and Inlet
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and conveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc. completed
Sectioning during forming bunds when earth moving machineries, loories and rollers are used for consolidation (Annexure III - D.50D)
Construction of Bathing ghat
Earth work Excavation and depositing on bank with initial lead and lift in hard stiff clay block cotton hard red earth shales murrams, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Sand filling with river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc complete
Cement concrete 1:4:8 mix using 40mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Cement concrete 1:2:4 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Supply and errection of centering with necessary supports for RCC item of works including cost and conveyance of all material and labour charges etc complete.
Supplying and Fabrication, placing in position of mild steel girlls for RCC works including cost of steel and binding wire etc.
Reinforcement cement concrete 1:1:5:3 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Colour washing two coats using approved colour pigments including cost and conveyance etc., complete
Construction of Inlet
Earth work Excavation for foundation in all soils and sub soil to full depth in hard stiff clay, stiff block cotton, hard red earth, shales murrum, gravel stoney earth and arth mixed with small sized boulders etc complete.
Supplying and filling foundation with river sand including watering consolidation ect complete
Plain cement concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete
Supplying erecting centreing, shuttering for sides and soffits including strutting etc complete
Towards cost and conveyance of 900mm dia RCC Hume pipes including all charges etc complete
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc complete
Part V - S.Andakudi Habitation, Deepening of Ayyanar kovil Oorani with construction of bathing ghat and Inlet
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and conveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc. completed
Sectioning during forming bunds when earth moving machineries, loories and rollers are used for consolidation (Annexure III - D.50D)
Construction of Bathing ghat
Earth work Excavation and depositing on bank with initial lead and lift in hard stiff clay block cotton hard red earth shales murrams, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Sand filling with river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc complete
Cement concrete 1:4:8 mix using 40mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Cement concrete 1:2:4 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Supply and errection of centering with necessary supports for RCC item of works including cost and conveyance of all material and labour charges etc complete.
Supplying and Fabrication, placing in position of mild steel girlls for RCC works including cost of steel and binding wire etc.
Reinforcement cement concrete 1:1:5:3 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Colour washing two coats using approved colour pigments including cost and conveyance etc., complete
Construction of Inlet
Earth work Excavation for foundation in all soils and sub soil to full depth in hard stiff clay, stiff block cotton, hard red earth, shales murrum, gravel stoney earth and arth mixed with small sized boulders etc complete.
Supplying and filling foundation with river sand including watering consolidation ect complete
Plain cement concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete
Supplying erecting centreing, shuttering for sides and soffits including strutting etc complete
Towards cost and conveyance of 900mm dia RCC Hume pipes including all charges etc complete
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc complete
Part VI -Pampuvilzhunthan Habitation, Deepening of OSR land well Oorani with construction of bathing ghat and Inlet
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and conveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc. completed
Sectioning during forming bunds when earth moving machineries, loories and rollers are used for consolidation (Annexure III - D.50D)
Construction of Bathing ghat
Earth work Excavation and depositing on bank with initial lead and lift in hard stiff clay block cotton hard red earth shales murrams, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Sand filling with river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc complete
Cement concrete 1:4:8 mix using 40mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Cement concrete 1:2:4 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Supply and errection of centering with necessary supports for RCC item of works including cost and conveyance of all material and labour charges etc complete.
Supplying and Fabrication, placing in position of mild steel girlls for RCC works including cost of steel and binding wire etc.
Reinforcement cement concrete 1:1:5:3 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Colour washing two coats using approved colour pigments including cost and conveyance etc., complete
Construction of Inlet
Earth work Excavation for foundation in all soils and sub soil to full depth in hard stiff clay, stiff block cotton, hard red earth, shales murrum, gravel stoney earth and arth mixed with small sized boulders etc complete.
Supplying and filling foundation with river sand including watering consolidation ect complete
Plain cement concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete
Supplying erecting centreing, shuttering for sides and soffits including strutting etc complete
Towards cost and conveyance of 900mm dia RCC Hume pipes including all charges etc complete
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc complete
Part VII - Vendhoni Habitation, Deepening of Sambai Oorani with construction of bathing ghat and Inlet
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and conveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc. completed
Sectioning during forming bunds when earth moving machineries, loories and rollers are used for consolidation (Annexure III - D.50D)
Construction of Bathing ghat
Earth work Excavation and depositing on bank with initial lead and lift in hard stiff clay block cotton hard red earth shales murrams, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Sand filling with river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc complete
Cement concrete 1:4:8 mix using 40mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Cement concrete 1:2:4 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Supply and errection of centering with necessary supports for RCC item of works including cost and conveyance of all material and labour charges etc complete.
Supplying and Fabrication, placing in position of mild steel girlls for RCC works including cost of steel and binding wire etc.
Reinforcement cement concrete 1:1:5:3 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Colour washing two coats using approved colour pigments including cost and conveyance etc., complete
Construction of Inlet
Earth work Excavation for foundation in all soils and sub soil to full depth in hard stiff clay, stiff block cotton, hard red earth, shales murrum, gravel stoney earth and arth mixed with small sized boulders etc complete.
Supplying and filling foundation with river sand including watering consolidation ect complete
Plain cement concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete
Supplying erecting centreing, shuttering for sides and soffits including strutting etc complete
Towards cost and conveyance of 900mm dia RCC Hume pipes including all charges etc complete
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc complete
Part VIII - Vendhoni Habitation, Deepening of Kamatchi amman Oorani with construction of bathing ghat and Inlet
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and conveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc. completed
Sectioning during forming bunds when earth moving machineries, loories and rollers are used for consolidation (Annexure III - D.50D)
Construction of Bathing ghat
Earth work Excavation and depositing on bank with initial lead and lift in hard stiff clay block cotton hard red earth shales murrams, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Sand filling with river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc complete
Cement concrete 1:4:8 mix using 40mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Cement concrete 1:2:4 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Supply and errection of centering with necessary supports for RCC item of works including cost and conveyance of all material and labour charges etc complete.
Supplying and Fabrication, placing in position of mild steel girlls for RCC works including cost of steel and binding wire etc.
Reinforcement cement concrete 1:1:5:3 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Colour washing two coats using approved colour pigments including cost and conveyance etc., complete
Construction of Inlet
Earth work Excavation for foundation in all soils and sub soil to full depth in hard stiff clay, stiff block cotton, hard red earth, shales murrum, gravel stoney earth and arth mixed with small sized boulders etc complete.
Supplying and filling foundation with river sand including watering consolidation ect complete
Plain cement concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete
Supplying erecting centreing, shuttering for sides and soffits including strutting etc complete
Towards cost and conveyance of 900mm dia RCC Hume pipes including all charges etc complete
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc complete
Part IX - Idayathur Habitation, Deepening of Amman kovil Oorani with construction of bathing ghat and Inlet
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and conveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc. completed
Sectioning during forming bunds when earth moving machineries, loories and rollers are used for consolidation (Annexure III - D.50D)
Construction of Bathing ghat
Earth work Excavation and depositing on bank with initial lead and lift in hard stiff clay block cotton hard red earth shales murrams, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Sand filling with river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc complete
Cement concrete 1:4:8 mix using 40mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Cement concrete 1:2:4 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Supply and errection of centering with necessary supports for RCC item of works including cost and conveyance of all material and labour charges etc complete.
Supplying and Fabrication, placing in position of mild steel girlls for RCC works including cost of steel and binding wire etc.
Reinforcement cement concrete 1:1:5:3 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Colour washing two coats using approved colour pigments including cost and conveyance etc., complete
Construction of Inlet
Earth work Excavation for foundation in all soils and sub soil to full depth in hard stiff clay, stiff block cotton, hard red earth, shales murrum, gravel stoney earth and arth mixed with small sized boulders etc complete.
Supplying and filling foundation with river sand including watering consolidation ect complete
Plain cement concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete
Supplying erecting centreing, shuttering for sides and soffits including strutting etc complete
Towards cost and conveyance of 900mm dia RCC Hume pipes including all charges etc complete
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc complete
Part X - Thenpothuvakudi Habitation, Deepening of Pillaiyar kovil Oorani with construction of bathing ghat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and conveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc. completed
Sectioning during forming bunds when earth moving machineries, loories and rollers are used for consolidation (Annexure III - D.50D)
Construction of Bathing ghat
Earth work Excavation and depositing on bank with initial lead and lift in hard stiff clay block cotton hard red earth shales murrams, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Sand filling with river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc complete
Cement concrete 1:4:8 mix using 40mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Cement concrete 1:2:4 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Supply and errection of centering with necessary supports for RCC item of works including cost and conveyance of all material and labour charges etc complete.
Supplying and Fabrication, placing in position of mild steel girlls for RCC works including cost of steel and binding wire etc.
Reinforcement cement concrete 1:1:5:3 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Colour washing two coats using approved colour pigments including cost and conveyance etc., complete
Part-XI Thenpothuvakudi Habitation, Deepening of Vellaikon Oorani with construction of bathing ghat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and conveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc. completed
Sectioning during forming bunds when earth moving machineries, loories and rollers are used for consolidation (Annexure III - D.50D)
Construction of Bathing ghat
Earth work Excavation and depositing on bank with initial lead and lift in hard stiff clay block cotton hard red earth shales murrams, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Sand filling with river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc complete
Cement concrete 1:4:8 mix using 40mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Cement concrete 1:2:4 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Supply and errection of centering with necessary supports for RCC item of works including cost and conveyance of all material and labour charges etc complete.
Supplying and Fabrication, placing in position of mild steel girlls for RCC works including cost of steel and binding wire etc.
Reinforcement cement concrete 1:1:5:3 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Colour washing two coats using approved colour pigments including cost and conveyance etc., complete
Part XII - Devarenthal Habitation, Deepening of Thatchar Oorani with construction of bathing ghat and Inlet
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and conveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc. completed
Sectioning during forming bunds when earth moving machineries, loories and rollers are used for consolidation (Annexure III - D.50D)
Construction of Bathing ghat
Earth work Excavation and depositing on bank with initial lead and lift in hard stiff clay block cotton hard red earth shales murrams, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Sand filling with river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc complete
Cement concrete 1:4:8 mix using 40mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Cement concrete 1:2:4 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Supply and errection of centering with necessary supports for RCC item of works including cost and conveyance of all material and labour charges etc complete.
Supplying and Fabrication, placing in position of mild steel girlls for RCC works including cost of steel and binding wire etc.
Reinforcement cement concrete 1:1:5:3 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Colour washing two coats using approved colour pigments including cost and conveyance etc., complete
Construction of Inlet
Earth work Excavation for foundation in all soils and sub soil to full depth in hard stiff clay, stiff block cotton, hard red earth, shales murrum, gravel stoney earth and arth mixed with small sized boulders etc complete.
Supplying and filling foundation with river sand including watering consolidation ect complete
Plain cement concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete
Supplying erecting centreing, shuttering for sides and soffits including strutting etc complete
Towards cost and conveyance of 900mm dia RCC Hume pipes including all charges etc complete
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc complete
Part XIII - Podhuvakudi Habitation, Deepening of Padikulathu Oorani with construction of bathing ghat and Inlet
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.,
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and conveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc. completed
Sectioning during forming bunds when earth moving machineries, loories and rollers are used for consolidation (Annexure III - D.50D)
Construction of Bathing ghat
Earth work Excavation and depositing on bank with initial lead and lift in hard stiff clay block cotton hard red earth shales murrams, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Sand filling with river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc complete
Cement concrete 1:4:8 mix using 40mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Cement concrete 1:2:4 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Supply and errection of centering with necessary supports for RCC item of works including cost and conveyance of all material and labour charges etc complete.
Supplying and Fabrication, placing in position of mild steel girlls for RCC works including cost of steel and binding wire etc.
Reinforcement cement concrete 1:1:5:3 mix using 20mm HBGS metal including cost and conveyance of all materials to site including labour for mixing, laying, curing etc.,
Colour washing two coats using approved colour pigments including cost and conveyance etc., complete
Construction of Inlet
Earth work Excavation for foundation in all soils and sub soil to full depth in hard stiff clay, stiff block cotton, hard red earth, shales murrum, gravel stoney earth and arth mixed with small sized boulders etc complete.
Supplying and filling foundation with river sand including watering consolidation ect complete
Plain cement concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete
Supplying erecting centreing, shuttering for sides and soffits including strutting etc complete
Towards cost and conveyance of 900mm dia RCC Hume pipes including all charges etc complete
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K ARULANDHU
SULTHAN SHAHUL HAMEED
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .