| # | Company | Status |
|---|---|---|
| 1 | Rejected-Technical BEST HOUSE NO 1 GST ROAD OPP TO MANNAR COLLEGE MOOLAKARAI PASUMALAI MADURAI 625 004 | MADURAI | MADURAI | TAMIL NADU | 625004 | Rejected-Technical Rejected |
| 2 | Rejected-Technical 429 MAIN ROAD SENDAMANGALAM NAMAKKAL DISTRICT 637 409 | SENDAMANGALAM | NAMAKKAL | TAMIL NADU | 637409 | Rejected-Technical Rejected |
| 3 | Rejected-Technical 1 367 SIVAN KOVIL STREET THONDAMATHURAI POST 621103 VEPPANTHATTAI TALUK PERAMBALUR DISTRICT | PERAMBALUR | TAMIL NADU | 621103 | Rejected-Technical Rejected |
Tender Value
₹12.0 Cr
EMD Value
₹6.1 L
Closing Date
9 Feb 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer(H) NABARD and RR Trichy
Office of the Superintending Engineer, Highways Department, NABARD and RR Circle, Plot No.372, Rajaram Salai, KK Nagar, Trichy-620021
Construction of bridge at Km 0/6 of Adhanur - Malavarayanalur road
2022_HWAY_219341_1
TN.No.15/2021-2022/SDO/TRY-NRR
Open Tender
Civil Works - Bridges
Item Rate
720 days
Ariyalur
As per PQ Document
6 documents required · 6 mandatory
₹0
₹6.1 L
Trichy
1 Mar 2022
29 Jan 2022
10 Feb 2022
29 Jan 2022
9 Feb 2022
2 Feb 2022
31 Jan 2022
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for DRESSING THE BED UPTO SILL LEVEL as per MORT&H Vth Revision 304. | 1,150 | Cubic Metre | - | - |
| 2 | Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification FOUNDATION OF PILE CAP UNDER ABUTMENTS AND PIERS as per MORT&H Vth Revision 304. | 810 | Cubic Metre | - | - |
| 3 | Providing and driving in position permanent MS liners 6mm thick including and conveyance to the site and fabricating, welding, all labour and consumables, hire charges and liner to be left permanently with the pile shaft as per requirement and as per specification with all leads and lift using 6mm M.S. Sheet etc., Complete as per MORT&H Vth Revision 1100, 1600, 1107.3. | 40.5 | Metric Tonne | - | - |
| 4 | Providing Reinforced Cement Concrete cast-in-situ bored piles of 1200 mm diameter in RCC using M35 (Design mix) using 20mm ISS HBG Metal with minimum cement content of 400 Kg/cum maximum water cement ration of 0.4 and slump of 150-200 mm by tremie concreting including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel and placing in position before concreting seting up of piling equipment, shifting the same from onelocation to another pile location , dismantling and including all labour for boring through all soils , leading the excavated earth to a distance 200m including forming of working platform, mixing concrete, filling in position by tremie pipe, cutting of pile head to cutt off level for casting pile cap including diversion of water course if necessary and all other incidental charges etc., complete as per standard specifications, forming and maintaining protective bunds and all other incidental charges etc., complete for PILES UNDER ABUTMENTS, WINGS & PIERS as per MORT&H Vth Revision 1000,1107, 1100, 1600,1700,1107 | 940 | Running Metre | - | - |
| 5 | Plain Cement concrete M15 Grade (Nominal Mix 1:2:4) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for LEVELLING COURSE BELOW PILE CAP UNDER ABUTMENTS, WINGS AND PIERS AND FOOTING UNDER PIER as per MORT&H 1000, 1500, 1700. | 33 | Cubic Metre | - | - |
| 6 | Vibrated Reinforced Cement Concrete M35 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for PILE CAP UNDER ABUTMENTS, RETURN WALLS AND PIERS as per MORT&H Vth Revision 1000, 1500, 1600, 1700, 2300, 1114 | 645 | Cubic Metre | - | - |
| 7 | Vibrated Reinforced Cement Concrete M35 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for ABUTMENTS AND RETURN WALLS as per MORT&H Vth Revision 1000, 1500, 1600, 1700, 2300 | 167 | Cubic Metre | - | - |
| 8 | Vibrated Reinforced Cement Concrete M35 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for BED BLOCK cum DIRT WALL OVER ABUTMENTS as per MORT&H Vth Revision 1000, 1500, 1600, 1700, 2200, 2300 | 16 | Cubic Metre | - | - |
| 9 | Vibrated Reinforced Cement Concrete M35 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for PIERS COLUMNS 1500mm dia as per MORT&H Vth Revision 1000, 1500, 1600, 1700, 2300 | 61 | Cubic Metre | - | - |
| 10 | Vibrated Reinforced Cement Concrete M35 (Design Mix) using HBG graded metal 20mm and 12mm ISS size including cost and conveyance of all materials to work site, but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering labour charges for compacting, curing, including all incidental charges etc., complete for CAPPING BEAM OVER PIER COLUMN as per MORT&H Vth Revision 1000, 1500, 1600, 1700, 2200 | 140 | Cubic Metre | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_259343.xls
BOQ Document • 0.35 MB
91586089.pdf
Tender Document • 0.10 MB
PQ_VOLI_ATHANUR.pdf
Tender Document • 0.36 MB
PRICE_BIDVOLII_ATHANUR.pdf
Tender Document • 1.59 MB
91586091.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .