Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-Finance 36 VIVEKANANDA ROAD KOLKATA 700007 | KOLKATA | KOLKATA | WEST BENGAL | 700007 | L1 | Accepted-Finance L1 | |
| 2 | L2₹32.2 L+₹7.4 L (29.7%)Rejected-Finance 124 B SHYAMAPROSAD MUKHERJEE ROAD KALIGHAT KOL 26 | KOLKATA | KOLKATA | WEST BENGAL | 700026 | L2 | Rejected-Finance L2 | |
| 3 | L3₹35.2 L+₹10.3 L (41.6%)Rejected-Finance 38 GURUPADA HALDER ROAD KOLKATA 700026 | KOLKATA | KOLKATA | WEST BENGAL | 700026 | L3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical 676 KEMIA KALUPARA KIRTIPUR NORTH 24 PARGANAS WEST BENGAL 700128 | KIRTIPUR | NORTH 24 PARGANAS | WEST BENGAL | 700128 | - | Rejected-Technical REJECTED |
| Sl No | Description | Qty | Unit | SINHA & SONS L1 | ART DECORATORS L3 | M/s. K.D.SET L2 |
|---|---|---|---|---|---|---|
| 1.00 | Hire and labour charges for fixing tarpaulin over the pandel with new materials complete in all respect including the cost of labour, materials and all other incidental charges and removal of the same after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 987 | sqm | 475 ₹4,68,825 | 500 ₹4,93,500 | 423.72 ₹4,18,211.64 Lowest |
| 2.00 | Hire and labour charges for Erection of stage with provision of front and backside ramps (with railings) including decoration as per requirement and fitting of flex at backdrop of stage with wooden frame (30ft x 15ft) including the cost of labour, materials and all other incidental charges and removal of the same and restoration of site after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 200 | sqm | 847 ₹1,69,400 Lowest | 989 ₹1,97,800 | 847.76 ₹1,69,552 |
| 3.00 | Hire and labour charges for Erection of Samiana Pandal with new materials and clothes complete in all respect including the cost of labour, materials and all other incidental charges and removal of the same after completion of the programme including cleaning and restoration of site as per direction and satisfaction of the Engineer-in Charge. | 165 | sqm | 169.4 ₹27,951 Lowest | 169.4 ₹27,951 Lowest | 169.4 ₹27,951 Lowest |
| 4.00 | Hire and labour charges for Fixing of Designed coloured cloth at celling of dias, for walling all over the area complete in all respect including the cost of labour, materials and all other incidental charges and removal of the same after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 365 | sqm | 338 ₹1,23,370 Lowest | 1,339 ₹4,88,735 | 1,339 ₹4,88,735 |
| 5.00 | Hire and labour charges for Erection of double layer jhalor with new materials and clothes complete in all respect including the cost of labour, materials and all other incidental charges and removal of the same after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 175 | mtr | 338 ₹59,150 Lowest | 1,339 ₹2,34,325 | 1,339 ₹2,34,325 |
| 6.00 | Hire and labour charges for laying of new tarpaulin on ground (tarpaulin Flooring) complete in all respect including the cost of labour, materials and all other incidental charges and removal of the same after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 445 | sqm | 85 ₹37,825 Lowest | 85 ₹37,825 Lowest | 85 ₹37,825 Lowest |
| 7.00 | Hire and labour charges for erection of Wooden bottom framework with new approved clour covering for side wing including front screen complete in all respect including the cost of labour, materials and all other incidental charges and removal of the same after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 135 | sqm | 339 ₹45,765 Lowest | 339 ₹45,765 Lowest | 339 ₹45,765 Lowest |
| 8.00 | Hire and labour charges for Wooden bottom framework with deep blue curtain fitting on the backside of the stage complete in all respect including the cost of labour, materials and all other incidental charges and removal of the same after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 67 | sqm | 169 ₹11,323 Lowest | 169 ₹11,323 Lowest | 169 ₹11,323 Lowest |
| 9.00 | Hire and labour charges for erection of stall decoration with rack counter complete in all respect including the cost of labour, materials and all other incidental charges and removal and restoration of the same after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 27 | sqm | 423 ₹11,421 Lowest | 423 ₹11,421 Lowest | 423 ₹11,421 Lowest |
| 10.00 | Hire and labour charges for laying synthetic carpet on dias, rest room and all over the pandel complete in all respect including the cost of labour, materials and all other incidental charges and removal of the same after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 233 | sqm | 63 ₹14,679 Lowest | 63 ₹14,679 Lowest | 63 ₹14,679 Lowest |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
23 Mar 2026, 11:30 amClosed
Sri. Sukdeb Halder Executive Enginer KCD PWD
45 Ganesh Chandra Avenue
Erection of temporary pandal, Stage and other allied works for the Annual convocation and Tagore Birth Anniversary to be held on 8th and 9th May, 2026 at the Jorasanko Sampus of Rabindra Bharati University.
2026_WBPWD_1018688_1
WBPWD/EE/KCD/NIeT28/2025-26
Open Tender
CIVIL WORKS
Item Rate
15 days
45 Ganesh Chandra Avenue
Please refer Tender documents.
4 documents required · 4 mandatory
₹80,000
Yes
27 May 2026
6 Mar 2026
25 Mar 2026
9 Mar 2026
23 Mar 2026
9 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hire and labour charges for fixing tarpaulin over the pandel with new materials complete in all respect including the cost of labour, materials and all other incidental charges and removal of the same after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 987 | sqm | - | - |
| 2 | Hire and labour charges for Erection of stage with provision of front and backside ramps (with railings) including decoration as per requirement and fitting of flex at backdrop of stage with wooden frame (30ft x 15ft) including the cost of labour, materials and all other incidental charges and removal of the same and restoration of site after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 200 | sqm | 1 | ₹200 |
| 3 | Hire and labour charges for Erection of Samiana Pandal with new materials and clothes complete in all respect including the cost of labour, materials and all other incidental charges and removal of the same after completion of the programme including cleaning and restoration of site as per direction and satisfaction of the Engineer-in Charge. | 165 | sqm | 2 | ₹330 |
| 4 | Hire and labour charges for Fixing of Designed coloured cloth at celling of dias, for walling all over the area complete in all respect including the cost of labour, materials and all other incidental charges and removal of the same after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 365 | sqm | 3 | ₹1,095 |
| 5 | Hire and labour charges for Erection of double layer jhalor with new materials and clothes complete in all respect including the cost of labour, materials and all other incidental charges and removal of the same after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 175 | mtr | 5 | ₹875 |
| 6 | Hire and labour charges for laying of new tarpaulin on ground (tarpaulin Flooring) complete in all respect including the cost of labour, materials and all other incidental charges and removal of the same after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 445 | sqm | 6 | ₹2,670 |
| 7 | Hire and labour charges for erection of Wooden bottom framework with new approved clour covering for side wing including front screen complete in all respect including the cost of labour, materials and all other incidental charges and removal of the same after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 135 | sqm | 7 | ₹945 |
| 8 | Hire and labour charges for Wooden bottom framework with deep blue curtain fitting on the backside of the stage complete in all respect including the cost of labour, materials and all other incidental charges and removal of the same after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 67 | sqm | 8 | ₹536 |
| 9 | Hire and labour charges for erection of stall decoration with rack counter complete in all respect including the cost of labour, materials and all other incidental charges and removal and restoration of the same after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 27 | sqm | 9 | ₹243 |
| 10 | Hire and labour charges for laying synthetic carpet on dias, rest room and all over the pandel complete in all respect including the cost of labour, materials and all other incidental charges and removal of the same after completion of the programme as per direction and satisfaction of the Engineer-in Charge. | 233 | sqm | 10 | ₹2,330 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
2911_.pdf
Tender Documents • 1.86 MB
BOQ_2503845.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .