Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 CrAccepted-Finance | ₹9.2 Cr | L1 | Accepted-Finance as per online received rate |
| 2 | L2₹9.9 Cr+₹74.9 L (8.17%)Accepted-Finance | ₹9.9 Cr+₹74.9 L (8.17%) | L2 | Accepted-Finance as per online received rate |
| 3 | L3₹10.8 Cr+₹1.7 Cr (18.0%)Accepted-Finance 2 1909 KUDI BHAGATASANI HOUSING BOARD JODHPUR RAJASTHAN 342001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | ₹10.8 Cr+₹1.7 Cr (18.0%) | L3 | Accepted-Finance as per online received rate |
| 4 | L4₹11.6 Cr+₹2.4 Cr (26.2%)Accepted-Finance | ₹11.6 Cr+₹2.4 Cr (26.2%) | L4 | Accepted-Finance as per online received rate |
| 5 | L5₹12.5 Cr+₹3.3 Cr (36.1%)Accepted-Finance 302 SHIV SADAN OPP ANAND MILAN SOC NEAR FIVE SHOP BHATIA CHOWK ULHASNAGAR 421004 | THANE | MAHARASHTRA | 421004 | ₹12.5 Cr+₹3.3 Cr (36.1%) | L5 | Accepted-Finance as per online received rate |
Tender Value
₹12.7 Cr
EMD Value
₹25.5 L
Closing Date
27 Nov 2025, 6:00 pmClosed
Additional Chief Engineer WR Zone Udaipur
Office of the Additional Chief Engineer WR Zone Udaipur
Construction of Bedach Ka Naka Dam for Rural Water Supply Scheme of 11 MH and 48 OH Block Kumbhalgarh district Rajsamand
2025_WRDAS_511268_1
Nit 10/2025-26 ACE WR Zone Udaipur
Open Tender
Civil Works
Percentage
540 days
Kumbhalgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Executive Engineer WR Division Rajsamand
₹25.5 L
Yes
ACE WR Zone Udaipur
9 Jan 2026
4 Nov 2025
28 Nov 2025
6 Nov 2025
27 Nov 2025
6 Nov 2025
14 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete) | 340 | sqm | 160 | ₹54,400 |
| 2 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | 4,960 | sqm | 220 | ₹10,91,200 |
| 3 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Curved edges or sides of special shapes like baffle or chute blocks, end sills, Basin Block, projected copings, extended sills, curved surfaces arches, circular ducts etc. | 399 | sqm | 340 | ₹1,35,660 |
| 4 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete) | 107 | cum | 140 | ₹14,980 |
| 5 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. | 2,700 | cum | 200 | ₹5,40,000 |
| 6 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Aqueduct troughs, siphon conduits, box type sluice barrels, domes spiral shafts or stair cases ( thin walled section) and ogee crests, baffle or chute blocks, end sills, buckets, projects coping, extended sill etc. | 915 | cum | 400 | ₹3,66,000 |
| 7 | Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and remove | 11 | sqm | 225 | ₹2,475 |
| 8 | Supply & fixing 6 mm thick PVC water seal of approved quality in construction/contraction joint as per drawing complete in all respect. 305 mm wide | 179 | rm | 800 | ₹1,43,200 |
| 9 | Steel shuttering for precasting R.C.C. members for railing of bridges with all lifts complete.(Area of railing) | 88 | sqm | 360 | ₹31,680 |
| 10 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 1,03,891 | kg | 89 | ₹92,46,299 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Tender Documents
Tender Documents • 4.78 MB
Other Document
Other Document • 4.31 MB
BOQ_911003.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .