| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Due to lower Rates |
| 2 | L2₹1.2 Cr+₹7.6 L (6.81%)Rejected-Finance VILLAGE SIVIAN DISTT BATHINDA | BATHINDA | PUNJAB | 151001 | ₹1.2 Cr+₹7.6 L (6.81%) | L2 | Rejected-Finance Due to higher Rates |
| Sl No | Description | Qty | Unit | EVERGREEN EARTH MOVERS L2 | THE G.D. CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, diversion for traffic, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect. | 29,746.56 | cum | 111 ₹33,01,868.16 | 107 ₹31,82,881.92 Lowest |
| 2.00 | Lowering, jointing of RCC NP-2 plain end pipes 600 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. | 10,126.56 | Mtr | 369 ₹37,36,700.64 | 358 ₹36,25,308.48 Lowest |
| 3.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of renches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres | 766.43 | cum | 172 ₹1,31,825.96 Lowest | 191 ₹1,46,388.13 |
| 4.00 | Cement concrete 1:4:8 | 71.05 | cum | 4,419 ₹3,13,969.95 | 3,093 ₹2,19,757.65 Lowest |
| 5.00 | Cement concrete 1:2:4 | 141.82 | cum | 5,504 ₹7,80,577.28 | 3,302 ₹4,68,289.64 Lowest |
| 6.00 | Shuttering for concrete faces | 765.98 | sqm | 221 ₹1,69,281.58 Lowest | 221 ₹1,69,281.58 Lowest |
| 7.00 | First class burnt brick work laid in cement sand mortar 1:6 | 352.55 | cum | 6,681 ₹23,55,386.55 | 6,560 ₹23,12,728 Lowest |
| 8.00 | 10 mm thick Cement Plaster 1:4 on Side Walls | 786.67 | sqm | 186 ₹1,46,320.62 Lowest | 190 ₹1,49,467.3 |
| 9.00 | 10 mm thick Cement Plaster 1:4 on Floors | 375.56 | sqm | 143 ₹53,705.08 Lowest | 146 ₹54,831.76 |
| 10.00 | RCC slab 1:2:4 with 60 kg steel per cum | 8.25 | cum | 9,243 ₹76,254.75 Lowest | 9,243 ₹76,254.75 Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
9 Jun 2025, 9:00 amClosed
Executive Engineer Devigarh Patiala Division
Executive Engineer/Devigarh Patiala Canal and Ground Water Division WRD Punjab Patiala
ESTIMATE FOR LINING OF W/C BY LAYING UGPL OF O/L RD 13500/R OF 3R DISTY.
2025_WR_141145_6
10/2025-26
Open Tender
Civil Works
Item Rate
60 days
Patiala
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Yes
₹2.1 L
Yes
Devigarh Patiala Division
16 Jan 2026
26 May 2025
9 Jun 2025
26 May 2025
9 Jun 2025
26 May 2025
2 Jun 2025
Amount
Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, diversion for traffic, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect.
Lowering, jointing of RCC NP-2 plain end pipes 600 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect.
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of renches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres
Cement concrete 1:4:8
Cement concrete 1:2:4
Shuttering for concrete faces
First class burnt brick work laid in cement sand mortar 1:6
10 mm thick Cement Plaster 1:4 on Side Walls
10 mm thick Cement Plaster 1:4 on Floors
RCC slab 1:2:4 with 60 kg steel per cum
Wrought iron & Mild steel ladders, framed grills, gratings etc. with ends of bars riveted or molded forged framed window guards, barred iron doors stair case iron railing etc. including cost of bolts and nuts, screws, welding rod complete fixing inposition
Providing & placing of Steel foot steps complete
Jointing & Cutting of RCC Plain End NP-2 pipes 150 mm dia into trenches & laying same in correct alignment
Shutter Arrangement for 600mm dia
Providing and Fixing Alfa Valve dia 600 mm
Dismantling of flexible pavements thickness above 50mm by mechanical means and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately as per technical clause 202 of MORT&H specifications
EVERGREEN EARTH MOVERS (BID ID -650739)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .