Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LQualified ANS METRO MALL 2ND FLOOR ANS METRO MALL TUGHLAKABAD TUGHLAKABAD SOUTH DELHI DELHI 110044 | SOUTH EAST DELHI | DELHI | 110044 | L1 | Qualified | |
| 2 | L2₹5.0 L+₹25,950 (5.51%)Qualified GROUND FLOOR BALLIA UTTAR PRADESH 277001 | BALLIA | UTTAR PRADESH | 277001 | L2 | Qualified | |
| 3 | L3₹5.0 L+₹33,500 (7.12%)Qualified 1ST FLOOR PEARL TOWER GURUGRAM PLOT NO 51 SECTOR 32 GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | L3 | Qualified | |
| 4 | L4₹5.1 L+₹38,310 (8.14%)Qualified 413 GAUTIYA RAJPUR KALAN ALIGANJ BAREILLY UTTAR PRADESH 243302 | BAREILLY | UTTAR PRADESH | 243302 | L4 | Qualified | |
| 5 | Disqualified V 101 SECTOR A BHAGWATI VIHAR UTTAM NAGAR UTTAM NAGAR WEST DELHI DELHI 110059 UDYAM DL 10 0005303 | WEST DELHI | DELHI | 110059 | - | Disqualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
22 Sept 2025, 6:00 pmClosed
Split Air Conditioner Including Green AC
Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6654789 Dated : 08-09-2025 Bid Document 1/8
-- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
8318623
GEM/2025/B/6654789
Two Packet Bid
Split Air Conditioner Including Green AC
90 days
SULTANPUR
Total value wise evaluation
PRODUCT
3 documents required · 3 mandatory
Exempted
8 Sept 2025
8 Sept 2025
22 Sept 2025
Split Air Conditioner Including Green AC
Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6654789 Dated : 08-09-2025 Bid Document 1/8
-- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8318623.pdf
GEM_BID
green_room_air_conditioner_specifications_-draft-_d_2024-05-01-11-50-44_6dc927f8627fd0e694ecf3e91a001743.pdf
SPECIFICATION
stc_-version_2-_split_air_conditioner_including_gre_2024-06-26-16-57-37_efdc88d6a009d5c093d94097cf97cbc4.pdf
OTHER
requirements_for_oem_status_against_the_category_-__2024-05-01-12-38-10_42eb1899ef2d07820095ebe48910a901.pdf
OTHER
1757303309.pdf
OTHER
OM_energy_ElecAppl.pdf
OTHER
ATCnew_ff99ff54-67c4-4742-bd171757303676232_shivamkumar.ord@ord.gov.in.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .